CONSTRUCTION CHECKLIST FOR SLAB
Interval of Bamboo props are
satisfactory & Props at both ends are
tighten.
Loose & defective Bamboo props are
removed.
Free end of platform sheet of slab is
fixed with beam shutter.
Forms are properly cleaned and
treated with form release agent (form
oil).
Watertightness is ensured in the
formwork.
4. Electrical or Conduit Embedding:
Electric conduits are set properly
before casting.
Conduit pipe joints has been sealed
properly with PVC Tape.
Pipes are tied with rebar at regular
interval.
Fixtures point is aligned with electrical
drawing.
5. Cleaning:
Shutter face & rebar laying Bed (Plain
Sheet) is cleaned by scrapping & wire
brush.
Re-bar is cleaned from all loose scale,
dirt, and paint oil, grease or other
foreign substance.
6. Materials & equipment’s:
Adequate Material such as cement,
aggregates and sand are presented
with respect to volume of work.
Rain protection is arranged.
Cylinder & Slump testing equipment’s
are present at site and in well
condition.