Room Integrity Testing
Room Integrity Testing
AUTHORS
CORY ZIEGLER
GILLES TREMBLAY
October 2019
www.merrick.com
EXECUTIVE SUMMARY
Biological laboratories that work with infectious agents are often required to have some level of boundary integrity testing (also
commonly referred to as leak/air tightness testing). This paper is a review of current guidelines and standards in the Biocontainment
Industry and proposes a means of testing new construction of CL3 laboratories to ensure that an acceptable level of quality is
achieved. Boundary integrity testing of the laboratory space for Biocontainment facilities achieves three primary objectives:1)
containment of an aerosolized agent; 2) containment of fumigants (decontamination gases); and 3) verification of the quality of the CL3
(BSL-3, SAPO-3, ACDP-3) boundary construction. Migration of fumigants is of most concern since laboratory ventilation systems are
designed to maintain directional airflow into a contaminated zone and room fumigation is usually performed when the ventilation
system is isolated at the room or zone level.
For CL3-Ag (BSL-3Ag, SAPO-4) and CL4 (BSL-4, ACDP-4) spaces, industry accepted standards have been pressure decay tests, as
identified in the Canadian Biosafety Standard and the USDA ARS Facility Design Standards. This report focuses on boundary integrity
testing methods for CL3 (BSL-3, SAPO-3, ACDP-3), laboratories, which are less defined.
Testing strategies and acceptance criteria for CL3 room leakage are often subjective rather than definitive, only referencing that a room
should be sealed with no definition of “sealed.”. This lack of definition can create many arguments during construction as to what is
considered “sealed.” Other guidelines require smoke pencil testing, but even that is difficult to quantify since interpretation is highly
subjective of the person doing the testing. To avoid conflicts, best practice is to specify a combination of testing, including smoke pencil
or soap bubble testing followed with a leakage test. The leakage test should be specific, easily quantifiable, allow the contractor to be
held liable for achieving, and easily repeatable for future testing. This report analyzes case studies to provide a suggested definitive
test criterion that can be applied to newly constructed CL3 facilities that have been constructed using common CL3 construction
techniques such as drywall or concrete masonry unit.
Prescriptive requirements from guidelines include a fixed rate range between 2 and 20 l/s (4 and 42CFM) at a differential pressure of
200 Pa (0.8 inches of wc) as published by Australia/New Zealand (AS/NZS); a limit on leakage per room surface area of 0.152 l/s per
square meter (0.030 cfm per square foot) at a room differential of 300 Pa (1.2 inches of wc) specified for USDA CL3 greenhouses; and
a limit on leakage per room surface area of 0.036 l/s per square meter (0.007 cfm per square foot) at a room differential of 250Pa (1
inch of wc) listed in the German VDI guidelines. Merrick best practice typically specifies a leakage rate of 2% of room volume per
minute at a room differential of 500 Pa (2 inches of wc). All these identified criteria were compared with various testing results obtained
from facilities around the world. To make comparisons simpler, all rates were adjusted to an equivalent test with a room differential
pressure of 250 Pa (1 inch of wc).
If all the rooms have the same construction materials and techniques, it is difficult to imagine why a room that is twice the volume must
be twice as tight in construction to achieve an acceptable result as specified by the AS/NZS guideline. This fact creates an argument
for improved testing methodologies that consider the room geometry.
The ARS greenhouse leakage rate acceptance criteria of 0.139 l/s per square meter (0.027 cfm per square foot) of room surface area
at a room differential pressure of 250 Pa (1 inch of wc) seems to provide a room integrity test standard that is challenging, but at the
same time achievable. Fifty-five percent of the rooms tested pass the criteria with typical CL3 construction methodologies, including
single and double wall gypsum, as well as CMU.
The Merrick industry best practice leakage rate of 1.41% of room volume at a room differential pressure of 250 Pa (1 inch of wc)
appears to offer similar challenging but achievable test results with 59% of rooms tested passing the criteria.
The recommended procedure for testing a room is a two-step process; 1) Initial leaks are identified with smoke pencil or soap bubble
testing and repairs are made to seal all visible leaks, and 2) A quantifiable leakage rate to verify the room meets minimum leakage
requirements.
Based on multiple facility testing assessments, the USDA ARS greenhouse leakage rate acceptance criterion of 0.139 l/s per square
meter (0.027 cfm per square foot) of room surface area at a room differential pressure of 250 Pa (1 inch of wc) is recommended as the
base criteria. Merrick best practice leakage rate of 1.41% of room volume at a room differential pressure of 250 Pa (1 inch of wc) is
offered as a secondary or alternative test criterion. Finally, for rooms that form the primary containment boundary but are still classified
as CL-3, we recommend a more stringent criterion following the German VDI guidelines of 0.036 l/s per square meter (0.007 cfm per
square foot) or room surface area at a room differential pressure of 250Pa (1 inch of wc). Achieving pressure differentials in excess of
250Pa can sometimes challenge construction materials, so the final recommendations summarize the room integrity test requirements
over a range of room pressure differentials.
www.merrick.com i
CONTRIBUTORS AND PEER REVIEW
Paul Amadio,
Facilities Engineering Operations Manager, Boston University, National Emerging Infectious Diseases Laboratories,
Boston MA, United States of America
Allen Bennett,
National Infection Service, Public Health England, United Kingdom
Todd Coulter,
Director Facility and Property Management Division, National Microbiological Laboratory, Winnipeg MB, Canada
Miguel A. Grimaldo
Director of Institutional Biocontainment Resources, University of Texas Medical Branch, Galveston. TX, United States of
America
Chris Kiley,
Director of Life Science Engineering, Merrick & Company, Duluth GA, United States of America
Joseph O’Keefe,
Animal Health Laboratory Manager, Project Director, National Biocontainment Laboratory Project, Diagnostics and
Surveillance Services, Biosecurity, Wallaceville, New Zealand
Scott Rusk,
Facility Director, Boston University, National Emerging Infectious Diseases Laboratories, Boston MA, United States of
America
Heather Sheeley,
Public Health England, United Kingdom
Joe Tanelli,
Chief Biocontainment Engineer, Health Security Infrastructure Branch, Public Health Agency of Canada
Jason Tearle,
Technical and Development Programme Biosafety Lead, The Pirbright Institute, Pirbright, United Kingdom
Neil Walls,
Neil Walls Consulting Pty Ltd, Australia (note: Reviewer does not agree with all the content).
Benjamin Weber,
Head of Biosafety and Engineering, Containment Laboratory Branch, SPIEZ LABORATORY, Austrasse, CH-3700 Spiez
Nathan Woods,
NBL Engineer, National Biocontainment Laboratory Project, Diagnostic and Surveillance Services (DSS), Operations
Branch, Ministry for Primary Industries, Wallaceville, New Zealand
www.merrick.com ii
TABLE OF CONTENTS
Executive Summary ......................................................................................................................................... i
Contributors and Peer Review ........................................................................................................................ ii
Table of Contents ............................................................................................................................................ iii
List of Acronyms and Abbreviations ............................................................................................................... iv
1 Introduction ............................................................................................................................................ 1
1.1 Background: ...................................................................................................................................... 1
1.2 Guidelines and Standards ................................................................................................................. 1
1.2.1 Australian AS/NZS 2243.3 – 2010 - Safety in laboratories - Part 3: Microbiological safety and
containment ............................................................................................................................. 2
1.2.2 VDI Guidelines Tightness of Containments VDI-2083 Part 19 – 2018 - Germany ................. 3
1.2.3 Canadian Biosafety Standard (CBS) – 2nd Edition – 2015 ....................................................... 3
1.2.4 USDHHS/CDC/NIH – Biosafety in Microbiological and Biomedical Laboratories – 5th Edition –
2009, USA (BMBL) .................................................................................................................. 3
1.2.5 ARS 242.1 – 2012 – ARS Facilities Design Standards, USA .................................................. 4
1.2.6 World Health Organization (WHO) – Laboratory Biosafety Manual – 3rd Edition – 2004 ......... 4
1.2.7 ANSI/ASSP Z9.14 – 2014, USA .............................................................................................. 4
1.2.8 Health and Safety Executive, UK............................................................................................. 5
1.2.9 Advisory Committee on Dangerous Pathogens (ACDP) – 2018, UK....................................... 5
1.2.10 Merrick Industry Best Practice ................................................................................................. 5
1.2.11 Primary Containment Device – BSC........................................................................................ 5
1.2.12 Building Envelope Testing ....................................................................................................... 6
1.2.13 Comparisons ........................................................................................................................... 6
2 What is an Acceptable Leakage Criterion? ............................................................................................ 7
2.1 Containing Aerosols .......................................................................................................................... 7
2.2 Containing Fumigant (Decontamination Gases) ............................................................................... 7
2.3 Construction Quality .......................................................................................................................... 7
2.4 Integrity Test Descriptions................................................................................................................. 7
2.5 Rate vs. Volume vs. Area.................................................................................................................. 8
2.5.1 Fixed Flow Rate: Australian AS/NZS 2243.3 ........................................................................... 9
2.5.2 Flow per unit area: VDI-2083 Part 19 and ARS 242.1 ............................................................. 9
2.5.3 Flow as % volume per minute ............................................................................................... 10
2.5.4 Pressure Decay: Canadian Biosafety Standard (CBS) – ARS 242.1 .................................... 10
3 Quantifiable Testing Results ................................................................................................................ 11
3.1 Introduction ..................................................................................................................................... 11
3.2 Australian Study .............................................................................................................................. 11
3.3 US Facility 1 .................................................................................................................................... 12
3.4 US Facility 2 .................................................................................................................................... 12
3.5 US Facility 3 .................................................................................................................................... 13
3.6 Canadian Facilities .......................................................................................................................... 14
3.7 European Facility ............................................................................................................................ 14
4 Conclusions ......................................................................................................................................... 15
5 Recommendations: .............................................................................................................................. 16
Appendix A: Explanatory Notes on Leak Testing .......................................................................................... 18
Appendix B: Formulas and Supporting Calculations ..................................................................................... 19
References .................................................................................................................................................... 22
www.merrick.com iii
LIST OF ACRONYMS AND ABBREVIATIONS
ACDP-3: Advisory Committee on Dangerous Pathogens Level 3
ASHRAE:
Pa: Pascals
www.merrick.com iv
1 INTRODUCTION
1.1 BACKGROUND:
Biological research, diagnostic and/ bio-response facilities working on infectious agents in which laboratories and rooms have the
potential for exposure to biological organisms are often required to have some level of boundary integrity testing (also commonly
referred to as leak/air tightness testing). This paper is not intended to be adopted by guidelines or standards, but is a review of current
guidelines and standards in the industry, and proposes a means of testing new construction of CL3 laboratories to ensure that an
acceptable level of quality is achieved to meet the primary objectives of a CL3 containment envelope.
Boundary integrity testing of the laboratory space for biological containment facilities is performed in order to achieve three primary
objectives
1. To minimize the potential for release of an aerosolized infectious agent to the general public and staff, as well as minimize
cross-contamination of multiple agent use facilities or larger facilities that may have different program requirements within
the same biological containment facility.
2. To minimize the migration of fumigants (decontamination gases) used to decontaminate the laboratory into neighboring
spaces within the building thereby reducing fumigant concentrations within the space and creating a health hazard, as well
as minimize migration of fumigants to multiple agent use facilities, or larger facilities that may have different concurrent
program requirements.
3. To verify construction quality of the space and whether it is sufficient for withstanding the maximum design pressure limit
without compromising the structural integrity of the CL3 containment boundary.
For CL3-Ag (BSL-3Ag, SAPO-4) and CL4 (BSL-4, ACDP-4) spaces, industry accepted standards have been pressure decay tests, as
identified in the Canadian Biosafety Standard, 2nd Edition and the USDA ARS 242.1-2012 Facility Design Standards. As these
standards and guidelines are well defined, this report will focus on boundary integrity testing methods for CL3 (BSL-3, SAPO-3, ACDP-
3) laboratories. For the purposes of this report, the acronym for containment level 3 laboratories (CL3) will be used. Note that this
acronym is directly comparable to other international acronyms (BSL-3/ABSL-3, ACDP-3, SAPO-3, PC3, etc.).
Typically, laboratory ventilation systems maintain airflow into a contaminated zone and exhaust through HEPA filters to minimize the
risk of release of aerosolized agents. Most manipulations of infectious agents within a CL3 laboratory occur within primary containment
devices such as Biological Safety Cabinets. The safeguards and practices minimize the risk of an accidental release of biological
agents, thus migration of fumigants (decontamination gases) is of greater concern as room fumigation is usually performed when the
ventilation system is isolated at the room or zone level.
To minimize leakage rate, CL3 laboratories are sealed using various methods during construction, and known leakage points, such as
doors and grilles, are sealed manually before room fumigation. Testing strategies and acceptance criteria for room leakage are often
subjective rather than definitive. This report analyzes different testing methodologies and case studies to provide a suggested definitive
test criterion that can be applied to newly constructed CL3 facilities using common CL3 construction techniques such as gypsum board
and concrete masonry unit (CMU).
www.merrick.com 1
1.2.1 AUSTRALIAN AS/NZS 2243.3 – 2010 - SAFETY IN LABORATORIES - PART 3:
MICROBIOLOGICAL SAFETY AND CONTAINMENT
Appendix H of AS/NZS 2243.3 “Recommendations on Acceptable Room Airtightness,” states a prescriptive recommendation for
maximum air leakage: “The recommended maximum leakage rate, β, for PC3 and PC4 laboratories is 10-5, at a test pressure of 200
Pa”, or in other words:
which equates to a recommended maximum leakage rate of 2 l/s at a pressure differential of 200 Pa (4.2 cfm @ 0.8 inch wc).
1. “Many PC3 and PC4 research laboratories do not need to meet the same level of air tightness as they are not dealing with
animals and all work is performed in biological safety cabinets that act as the primary containment device within the laboratory
structure.”
2. “It is not recommended that a laboratory be designed for gaseous decontamination if the leakage rate exceeds 10-4 at 200 Pa
differential pressure, without specialist advice.”
Given these two exceptions, the 10-5 criteria is the AS/NZS standard, however a higher leakage rate may be acceptable for rooms that
are not the primary containment barriers, as any manipulation of agents is performed in primary containment devices such as isolators
or biological safety cabinets. Rooms may be permitted to have a leakage rate as high as 10-4 (20 l/s) at 200 Pa differential pressure (42
cfm at 0.8 inches of wc) if precautions are taken during decontamination to ensure that risks of exposure to fumigants are minimized in
adjacent spaces.
Therefore, per the Australia/New Zealand standard, the recommended range of leakage from a CL3 laboratory is 2 l/s (4.2 cfm) to 20
l/s (42 cfm), with a room differential pressure of 200 Pa (0.8-inch wc). For comparison purposes in this report, the equivalent range of
acceptance at a room differential pressure of 250 Pa is calculated at 2.2 l/s (4.7 cfm) to 22.4 l/s (47.5 cfm).
An argument is made that the Australia/New Zealand standard requires a single leakage rate for all room sizes to force designers to
use smaller rooms which makes the facility safer. Another argument is that if they were to allow more leakage in a larger space, the
result may be unacceptable leakage at one point causing a safety hazard during fumigations.
Note that this guideline is currently under review for a future update but unlikely to change in this regard.
www.merrick.com 2
1.2.2 VDI GUIDELINES TIGHTNESS OF CONTAINMENTS VDI-2083 PART 19 – 2018 -
GERMANY
Criteria for testing of leakage is recommended for multiple building types including cleanrooms, for different classifications of
containment spaces ranging from level 0 through level 7, For CL3, the guideline recommends that the leakage rate for class 4 be used
at a rate of 0.03620L/s per square meter (0.007CFM per square foot) of room surface area at a pressure differential of 250Pa (1 inch
w.c.). Also, for CL4 spaces, the guideline recommends that the leakage rate for class 5 be used at a rate of 0.01205L/s per square
meter (0.002CFM per square foot) at a pressure differential of 250Pa (1 inch w.c.). Figure 1.1 shows the equivalency table from the
guideline for acceptable air permeability rates of different classes at multiple differential test pressures.
Paragraph 5.3.5 in the CBS identifies the testing requirements for CL-3Ag and CL4 zones as follows: “Integrity of containment barrier to
be tested by pressure decay testing. Acceptance criteria include two consecutive tests with a maximum of 250 Pa (1 inch wc) loss of
pressure from an initial 500 Pa (2 inch wc) over a 20-minute period.”
www.merrick.com 3
1.2.5 ARS 242.1 – 2012 – ARS FACILITIES DESIGN STANDARDS, USA
Criteria for testing of leakage is only provided for BSL3-Ag zones and is identical to the test identified in the Canadian Biosafety
Standard. Acceptance criteria is outlined in paragraph 9B-4.E as, “Two consecutive pressure decay tests demonstrating a minimum of
1 inch wc (250 Pa) negative differential pressure remaining after 20 minutes, from an initial negative pressure differential of 2 inches wc
(500 Pa).”
In addition, CL3-Ag (BSL-3Ag) containment for greenhouses is separately identified in paragraph 9B-6 as “the test pressure difference
will be 6.24 pounds per square foot positive static pressure (300 Pa); the allowable leakage rate is 0.03 cfm per square foot” (0.152 l/s
per square meter). For comparison purposes within this report, the equivalent allowable leakage rate at a room differential pressure of
250 Pa is 0.139 l/s per square meter (0.027 cfm per square foot) of room surface area.
Note that this guideline is currently under review for a future update.
Section 8.4.8.2 states, “When required by the facility risk assessment, room tightness (room air-leakage test) shall be performed before
initial operation, periodically thereafter (as determined by the facility risk assessment and SOP) …” While no definitive testing criteria is
stated, it does identify that the boundary is to be confirmed using smoke or soap bubbles with room pressures ranging from normal
operating pressures to higher values (e.g., twice the normal value) as appropriate. It also indicates that additional test methods may be
appropriate for initial commissioning of new construction and/or renovations, such as:
1. Operating the room at higher differential pressure values for the smoke/bubble tests (e.g., up to 2 inch wg (500 Pa)): Testing
at this pressure may be useful in conjunction with HVAC controls testing.
2. “Room porosity” tests using airflow/pressure testing equipment similar to equipment used for duct-leak testing.
www.merrick.com 4
1.2.8 HEALTH AND SAFETY EXECUTIVE, UK
The HSE publishes a document, “Sealability of Microbiological Containment Level 3 and 4 Facilities,” which requires that, for
containment level CL3 and CL4 facilities, the workplace is to be sealable to permit disinfection. The sealability test methods identified
include:
1. Smoke testing is the main method, with no test criteria identified. They also go on to state, “Recent research has indicated
that the use of smoke plume-generating devices is an inherently sensitive method. However, the limits of its sensitivity are
heavily dependent upon the skill of the person performing the test.”
2. Room pressure decay testing, which requires the room to be held at a specified negative pressure relative to atmosphere
for a prescribed period and measurement of any loss of the pressure differential at regular intervals during that time. The
leak rate must then be compared to a predetermined acceptance value. A reference to Canada’s pressure decay testing
methodology is also made.
In addition, there is a pointed note that applies to all responsible owners that deal with room disinfection that states, “Therefore,
regardless of whether the fumigant of choice is formaldehyde, hydrogen peroxide or some other chemical, the legal requirement for
room sealability remains and it is the responsibility of the duty holder to ensure the sealable status of the facility.”
1. [28] “At CL3, the laboratory must be capable of being sealed to allow it to be effectively disinfected. An ongoing programme
of formal assessment, e.g. an annual test is recommended to make sure sealability is maintained. However, more frequent
visual inspections should be undertaken, e.g. for cracks, or dust trails, which may provide early indication of breaches in
sealability of the facility. In this event, remedial work should be carried out and verified as effective.”
2. [31] “Sealability is usually carried out with the laboratory operating at normal working pressure and leaks are detected by
observing any deviation of the smoke plume (see Figure 13) and should be performed by a competent person.”
1. “The cabinet shall hold 2 in. wg (500 Pa) within ± 10% for 10 min.
2. For manufacturer testing only, the soap bubble method may be used when pressure plates fail: all welds, gaskets,
penetrations, or seals on exterior surfaces of air plenums shall be free of soap bubbles when at 2 in. wg (500 Pa) ± 10%
pressure above atmospheric.
www.merrick.com 5
1.2.12 BUILDING ENVELOPE TESTING
As a point of reference and comparison, there are building envelope testing standards that define the air tightness of the building
enclosure or envelope. While these standards set air leakage criteria to help reduce overall energy consumption of buildings, they may
not be appropriate for a containment lab environment. Three typical standards with test criteria are as follows:
1. The U.S. Army Corps of Engineers Air Leakage Test Protocol for Building Envelopes; Version 3 identifies a maximum
allowable air leakage requirement at 75 Pa (0.3” wc) to be 1.27 l/s per square meter (0.25 cfm per square foot).
2. In the UK, the Air Tightness Testing & Measurement Association (ATTMA) Technical Standard L2 lists normal and best
practice air permeability rates for various space types. At 50 Pa (0.2” wc), the most stringent air permeability best practice
is listed for Museums as 1.0 cubic meter per hour per square meter or equivalently: 0.278 l/s per square meter (0.055 cfm
per square foot).
3. ASHRAE 90.1 – Energy Standards for Buildings Except Low Rise Residential Buildings identifies many leakage rates of
building envelopes for different types of building construction and fenestration types, with the one relevant for our purpose
being 2.03 l/s per square meter (0.4 cfm per square foot) at a pressure of 75 Pa (0.3” wc)
1.2.13 COMPARISONS
The graphic below illustrates the wide variance in test criteria. Note that the only defined test criteria for CL3 laboratories is the AS/NZS
guidelines and German VDI. ASHRAE 90.1 and the NSF/ANSI 49 standards are not relevant to CL3 construction but are shown to
illustrate extreme limits.
Figure 1.2: Logarithmic comparison of acceptable leakage rate limits between standards
normalized to a dP of 250Pa; Based on a typical lab module of 6.7m(L) x 3.3m(W) x 3.0m(H)
www.merrick.com 6
2 WHAT IS AN ACCEPTABLE LEAKAGE CRITERION?
2.1 CONTAINING AEROSOLS
CL3 laboratories typically rely on directional airflow to contain potential infectious agents, by supplying less air into the space than what
is being exhausted (extracted) from the space. The USDA ARS 242.2 guidelines recommend “the infiltration of air into the containment
boundary be at least 50 cfm (23.6 l/s) per doorway at all times.“ The USDA ARS 242.2 guideline also requires “sufficient exhaust to
create a 0.05” water column differential between containment area and the access area”, which typically drives the airflow across a
doorway to be greater than 47l/s (100CFM). The NIH Design Requirements Manual states “to maintain 47 l/s (100 cfm) air flow from the
corridor into each lab module.” To ensure directional airflow is maintained, at a minimum the leakage of the space should be less than
allowed for across the doorways. Arguably, increasing the differential between supply and exhaust (extract) air will maintain directional
airflow in the leakiest of spaces, so a hard target based on this criterion is difficult to establish. Generally, CL3 spaces are not primary
containment, and work with aerosols or animals are within self-contained apparatus, so risk of aerosols within the general CL3
environment is minimal. A risk assessment should be completed to evaluate if there is a considerable risk in which a higher level of
containment is required.
Some guidelines have more prescriptive requirements, such as those for Australia/New Zealand, which specify a fixed rate; Canada
and the USDA which specify a volumetric leakage rate for CL3Ag; the USDA greenhouse requirements, which specify a limit on
leakage per surface area; and the German VDI guidelines which specify a limit on leakage per surface area.
To avoid conflicts during construction and with testing officials, best practice is to specify a combination of testing, including smoke
pencil or soap bubble testing followed with a leakage test. The leakage test should be specific, easily quantifiable, allow the contractor
to be held liable for achieving, and easily repeatable in future testing.
Since aerosol and fumigant (decontamination gases) containment can be accomplished with good SOPs, an acceptable leakage
criterion for CL3 laboratories does not need to be extreme but should be achievable and repeatable with current construction practices
for CL3 laboratories, which often consist of gypsum board or CMU.
From the Australia/New Zealand standards, we see a range of acceptable leakage is suggested at between 2 to 20 l/s (4 and 42 cfm)
when the room is subjected to a differential pressure of 200 Pa (0.8 inches of wc). However, an acceptable room volume or surface
area through which the leakage would occur is not provided. Thus, for the Australia/New Zealand standard, the size of the room is
www.merrick.com 7
irrelevant in the calculation, and the same leakage rage is assumed for any size of room. We suggest that a small procedure room
should not have the same leakage rate as a large open laboratory, when the large laboratory has significantly more surface area,
penetrations, and other potential leak points all of which contribute to overall leakage. Similar to the pressure decay testing
methodology, we suggest that a leakage standard for CL3 spaces should be proportional to the room size.
When looking at a pressure decay testing specified for CL3-Ag and CL4 facilities, the same rate of change in pressure is required for
any size room. From the ideal gas law, the change in the amount of air in the space is proportional to the room volume, thus the larger
the room, the larger the amount of displaced air is required to meet the same change in pressure. In other words, for the pressure
decay test criteria, the rate of leakage from a space is directly proportional to the room volume.
V=n ·R·T/P
Room geometry can also play a factor in leakage rates. Consider two rooms with the same width, with one room having a square floor
area and the second room having rectangular area where the length of one side is twice the length of the width of the other side.
Although both rooms hove double the volume of air, the surface area of the rectangular room is marginally less than double of the
surface area of the square room.
This observation suggests that acceptable rates of air leakage from containment spaces should be proportional to the room surface
area, rather than the room volume, however it is noted that the difference in room volumes vs the difference in surface areas between
the two geometries is marginal and would have minimal consequences on calculating an acceptable leakage rate.
2. A double wide lab module of 6.7m(L) x 6.7m(W) x 3.0m(H) is twice as wide as a typical lab module.
3. A double long lab module of 13.4m(L) x 3.3m(W) x 3.0m(H), is twice as long as a typical lab module.
Each of these examples is used to demonstrate the comparable leakage rates. The surface areas and volumes for each of the rooms is
summarized as follows:
www.merrick.com 8
2.5.1 FIXED FLOW RATE: AUSTRALIAN AS/NZS 2243.3
The AS/NZS standard requires leakage of any size space to be between 2.2 and 22.4 l/s (4.7 and 47 cfm) when subjected to a room
differential pressure of 250 Pa (1 inch of wc). Figure 2.2 below indicates the minimum fixed leakage of 2.2 l/s (4.7cfm) for lab modules
of different geometry and compares it to the equivalent leakage per unit area, leakage of %volume per minute, and an equivalent
pressure decay rate. From the figure, we see that comparable leakage per unit area and leakage of percent volume per minute are
essentially double for a typical lab module that is half the size of the other two lab modules. Comparable pressure decay rates for the
typical lab module is approximately half of that compared to the other two lab modules. If all the lab modules have the same
construction materials and techniques, then it is difficult to imagine why a room that is twice the volume must be twice as tight in
construction to achieve an acceptable result. This demonstrates that a fixed leakage rate may not be the best solution as a measure of
acceptable leakage as compared to guidelines which factor in room geometry.
2.5.2 FLOW PER UNIT AREA: VDI-2083 PART 19 AND ARS 242.1
The German VDI guideline requirement states a leakage per room surface area criteria of 0.0362 l/s per square meter (0.007 cfm per
square foot) at a room differential pressure of 250 Pa (1 inch of wc).The ARS greenhouse requirement states a leakage per room
surface area criteria of 0.139 l/s per square meter (0.027cfm per square foot) at a room differential pressure of 250 Pa (1 inch of wc).
Figure 2.3 below indicates the ARS fixed leakage per room surface area criteria of 0.139 l/s per square meter (0.027cfm per square
foot) at a room differential pressure of 250 Pa (1 inch of wc) for lab modules of different geometry and compares it to the equivalent
total leakage flow rate, leakage of %volume per minute, and an equivalent pressure decay rate. From the chart, we see that total
leakage increases as surface area increases, as would be expected when using the same construction materials and techniques. The
chart also shows that the comparable percent volume per minute calculation and pressure decay rate only vary slightly as the room
geometry changes.
www.merrick.com 9
Figure 2.3: Fixed Leakage per Area: ARS Greenhouse Leakage Comparison
www.merrick.com 10
3 QUANTIFIABLE TESTING RESULTS
3.1 INTRODUCTION
The following examples are of real CL3 laboratories around the world where we have compiled quantifiable leak testing results. The
results are compared to different guideline testing requirements of the AS/NZS total leakage of 22.4L/s, the ARS Greenhouse standard
of 0.139 l/s per square meter of room surface area, and the biocontainment industry standard of 1.41% of room volume per minute, all
at a differential pressure of 250Pa.. Since testing at all facilities was at slightly different pressures, all data is modified using the orifice
equations and ideal gas laws to equate comparable leakage rates at 250 Pa, and green highlights indicate the spaces that pass the
criteria in the relevant column. For simplicity of reading, all units of measure are presented in metric.
Only the wall surface area for each facility was recorded in the publication, so for comparison purposes in this report, the total surface
area including floor and ceiling was calculated. To calculate the total surface area, the room volume was divided by a typical room
height of 3 meters to get the room area. This room area was used as the floor and ceiling area and added to the wall area to achieve a
calculated total room surface area.
We analyzed the 16 Australian facilities and compared accepted leakage rates based on the AS/NZS 2243.3 standard and calculated
flow per square meter of room surface area, percent of room volume of leakage per minute at equivalent room differential pressures of
250 Pa, and pressure decay rate from 500 Pa to 250 Pa. Of the 16 facilities tested, only 10 met the minimum Australian criteria of 22.4
l/s when measured at a differential pressure of 250 Pa, and only two facilities achieved the leakage rate of 2.2 l/s.
Leakage Leakage per Area Leakage per Vol
Australia Construction Volume Est Total S. @ 250Pa (L/s) (L/s per sq.m) %vol per min Decay Rate
Facility # Material cu.m Area sq.m (Pass =22.4) (Pass = 0.139) (Pass = 1.41) 500Pa to 250Pa (s)
1 Sandwich Panel 79.69 112 1.80 0.0160 0.14 103.6
2 Double Gypsum 42.2 77 1.86 0.0241 0.26 53.2
3 Double Gypsum 48.11 109 2.54 0.0234 0.32 44.4
4 Sandwich Panel 57.82 109 2.96 0.0273 0.31 45.7
5 Double Gypsum 48.11 109 4.51 0.0415 0.56 25.0
6 Gypsum 50.83 80 8.36 0.1041 0.99 14.2
7 Double Gypsum 143.07 158 16.12 0.1019 0.68 20.8
8 Sandwich Panel 61.97 110 16.47 0.1499 1.59 8.8
9 Sandwich Panel 67.35 105 17.71 0.1679 1.58 8.9
10 Gypsum 48.91 85 21.18 0.2494 2.60 5.4
11 Gypsum 82.8 115 26.48 0.2299 1.92 7.3
12 Gypsum 112.83 173 27.75 0.1604 1.48 9.5
13 Gypsum 42.04 76 28.17 0.3700 4.02 3.5
14 Gypsum 49.15 86 29.96 0.3503 3.66 3.8
15 Gypsum 66.86 99 35.03 0.3546 3.14 4.5
16 Gypsum 156.68 248 63.28 0.2548 2.42 5.8
Figure 3.1: Australian Study Comparison
In terms of l/s per square meter of room surface area, we see that the first nine facilities and facility 12 are all under 0.2 l/s per square
meter at a pressure differential of 250Pa. This is expected because facility 12 has a large surface area about 60% greater than the
other facilities that passed the AS/NZS standard. If we look at the ARS guideline with an acceptable leakage criterion of 0.139 l/s per
square meter of room surface area at a differential pressure of 250Pa, we see that only the first seven facilities pass the requirement as
indicated by the green highlight. We also note that the leakage rate from facility numbers 8,9, and 12 are almost identical between 0.15
and 0.17 l/s per square meter, while facility 10—which passed the AS/NZS criteria—grossly exceeds the ARS rate with a leakage of
0.25 l/s per square meter at a pressure differential of 250Pa. This data supports the suggestion that leakage per unit area is an
improved acceptance criterion over a fixed rate for all spaces.
www.merrick.com 11
When looking at percentage of room volume per minute, again as indicated by the green highlight only the first seven facilities fall
under the CL3 biocontainment industry standard recommended criteria of 1.41% of room volume per minute at a pressure differential of
250Pa. We also notice that facility 12’s leakage rate of 1.48%vol per minute at a pressure differential of 250Pa is less than that of
facilities 8,9 and 10, all of which passed the AS/NZS criteria. This data shows similar acceptance results when compared to the ARS
greenhouse leakage rate of 0.139 l/s per square meter of room surface area at 250 Pa differential pressure, which again supports the
suggestion that leakage per volume is an improved acceptance criterion over a fixed rate for all spaces.
We also note that the best constructed facility has a pressure decay rate from 500 Pa to 250 Pa of just over one and a half minutes,
which is not even close to the 20 minutes identified in the CBS and ARS guidelines for CL3-Ag and CL4 facilities. This data supports
that CL3 facilities are not currently held to the same construction standards as CL3-Ag and CL4.
3.3 US FACILITY 1
The construction of the walls of this facility was concrete masonry unit (CMU), and the testing criteria was originally specified as a
pressure decay test, starting with the room at a negative differential pressure of 188 Pa, and measuring the time it took until the
negative pressure differential reached 94 Pa. The passing criteria was an elapsed time greater than 20 minutes. During initial testing,
the elapsed time for most of the rooms was less than 15 seconds.
Merrick recommended a different approach to measure the room volumetric offset to maintain a certain pressure. Leakage points were
identified and sealed, and tests were re-run using a blower door to pressurize each room and measure the airflow required to maintain
pressure.
We compared the final measured leakage rates and calculated flow per square meter of room surface area, and percent of room
volume of leakage per minute at equivalent differential pressures of 250 Pa, and a pressure decay rate from 500 Pa to 250 Pa. From
these results, we see that all the large labs fall under the Merrick acceptance leakage rate of 1.41% of room volume per minute at a
pressure differential of 250Pa.
Leakage Measured Leakage per Area Leakage per Vol
US Facility 1 Volume Surf. Area @ 250Pa (L/s) L/s per sq.m %vol per min Decay Rate
Room # Room Name cu.m sq.m (Pass =22.4) (Pass = 0.139) (Pass = 1.41) 500Pa to 250Pa (s)
MB00.58 Large Lab 59.47 96.62 5.7 0.0587 0.57 21.9
MB00.59 Large Lab 59.47 96.62 13.3 0.1381 1.35 9.3
MB00.60 Large Lab 59.47 96.62 9.3 0.0967 0.94 13.3
MB00.61 Large Lab 59.47 96.62 9.3 0.0967 0.94 13.3
MB00.62 Large Lab 59.47 96.62 13.7 0.1415 1.38 9.1
MB00.63 Large Lab 59.47 96.62 9.7 0.1001 0.98 12.9
MB00.64 Large Lab 59.47 96.62 11.0 0.1139 1.11 11.3
MB00.66 Procedure Room 24.07 50.17 8.9 0.1775 2.22 5.7
MB00.67 Procedure Room 48.14 81.75 13.7 0.1673 1.70 7.4
MB00.73 Iso Suite 99.11 137.50 13.7 0.0995 0.83 15.2
Figure 3.2: US Facility 1 Comparison
If we look at the ARS guideline with an acceptable leakage criterion of 0.139 l/s per square meter of room surface area at a pressure
differential of 250Pa, we see that all but one of the large labs pass the requirement. This data supports the suggestion that ARS
greenhouse criteria is slightly more stringent than the Merrick best practice acceptance criteria.
If we compare the leakage rates to the AS/NZS acceptance criteria of 22.4 l/s at a room differential pressure of 250 Pa, we see that all
the rooms easily pass the criteria. Again, this data supports the suggestion that leakage per unit area or % of volume per minute is an
improved acceptance criterion over a fixed rate for all spaces.
3.4 US FACILITY 2
The construction of the walls of this facility was single layer drywall on metal stud. No specific testing criteria were identified for this
project, however Merrick recommended performing multiple tests in succession in which leaks were identified and sealed and the room
re-tested. Using the same approach, tests were run using a blower door to pressurize each room and measure the airflow required to
maintain pressure.
www.merrick.com 12
We compared the final measured leakage rates and calculated flow per square meter of room surface area, and percent of room
volume of leakage per minute at equivalent differential pressures of 250 Pa, and a pressure decay rate from 500 Pa to 250 Pa. From
these results, we see that most of the larger labs fall above the ARS greenhouse requirement of 0.139 l/s per square meter or room
surface area at a pressure differential of 250Pa and fall above the Merrick acceptance leakage rate of 1.41% of room volume per
minute at a pressure differential of 250Pa. However, we note that the animal rooms, which are primary containment, all passed the
listed criteria in the table.
Leakage Measured Leakage per Area Leakage per Vol
US Facility 2 Volume Surf. Area @ 250Pa (L/s) L/s per sq.m %vol per min Decay Rate
Room # Room Name cu.m sq.m (Pass =22.4) (Pass = 0.139) (Pass = 1.41) 500Pa to 250Pa (s)
8079 Large Lab 67.96 107.77 33.5 0.3108 2.96 4.2
8078 Large Lab 67.96 107.77 19.3 0.1795 1.71 7.4
8077 Large Lab 67.96 107.77 27.4 0.2539 2.42 5.2
8076 Large Lab 67.96 107.77 22.6 0.2101 2.00 6.3
8075 Large Lab 67.96 107.77 22.6 0.2101 2.00 6.3
8074 Large Lab 67.96 107.77 13.7 0.1269 1.21 10.4
8073 Large Lab 67.96 107.77 14.2 0.1313 1.25 10.1
8023E Lab 45.31 78.04 9.4 0.1209 1.25 10.1
8024E Lab 45.31 78.04 7.1 0.0907 0.94 13.4
8025E Lab 45.31 78.04 7.1 0.0907 0.94 13.4
8026E Lab 45.31 78.04 7.1 0.0907 0.94 13.4
8023F Procedure Room 40.78 73.21 7.1 0.0966 1.04 12.1
8023G Animal Room 73.62 109.63 7.1 0.0645 0.58 21.8
8024F Procedure Room 40.78 73.21 7.1 0.0966 1.04 12.1
8024G Animal Room 73.62 109.63 7.1 0.0645 0.58 21.8
8025F Procedure Room 40.78 73.21 7.1 0.0966 1.04 12.1
8025G Animal Room 73.62 109.63 7.1 0.0645 0.58 21.8
8026F Procedure Room 40.78 73.21 7.1 0.0966 1.04 12.1
8026G Animal Room 73.62 109.63 7.1 0.0645 0.58 21.8
8027E Aerobiology 124.88 159.98 23.6 0.1474 1.13 11.1
8027I Necropsy 39.64 70.61 23.6 0.3340 3.57 3.5
8027J Animal Room 27.18 55.00 23.6 0.4288 5.21 2.4
Figure 3.3: US Facility 2 Comparison
If we compare the leakage rates to the AS/NZS acceptance criteria of 22.4 l/s at a room differential pressure of 250 Pa, we see that the
larger rooms have about twice the air leakage as the smaller rooms. Again, this data supports the suggestion that leakage per unit area
or volume is an improved acceptance criterion over a fixed rate for all spaces.
3.5 US FACILITY 3
The construction of the walls of this facility was precast concrete with a polyurethane sealant, and the testing criteria was specified as
1% of room volume per minute at a room differential pressure of 125 Pa. The facility was tested as a whole at the containment
perimeter using a blower door to pressurize the space and measure the airflow required to maintain pressure.
We compared the final measured leakage rates and calculated flow per square meter of room surface area, and percent of room
volume of leakage per minute at equivalent differential pressures of 250 Pa, and a pressure decay rate from 500 Pa to 250 Pa. From
these results we see the facility falls well below the ARS greenhouse requirement of 0.139 l/s per square meter or room surface area at
a pressure differential of 250Pa, and also falls well below the Merrick acceptance leakage rate of 1.41% of room volume per minute at
a pressure differential of 250Pa. The facility also passes the German VDI recommendation of 0.036 l/s per square meter (0.007 cfm per
square foot) of room surface area at a room differential of 250Pa (1 inch of wc). In contrast, due to the volume of the space the facility
would have no hope of passing the AS/NZS requirement of 22.4 l/s at a room differential pressure of 250 Pa. Again, this data supports
the suggestion that leakage per unit area or volume is an improved acceptance criterion over a fixed rate for all spaces.
Leakage Measured Leakage per Area Leakage per Vol
US Facility 3 Volume Surf. Area @ 250Pa (L/s) L/s per sq.m %vol per min Decay Rate
Room # Room Name cu.m sq.m (Pass =22.4) (Pass = 0.139) (Pass = 1.41) 500Pa to 250Pa (s)
101 Mechanical Space 8563 2742 73.4 0.0268 0.05 244.2
Figure 3.4: US Facility 3 Comparison
www.merrick.com 13
3.6 CANADIAN FACILITIES
The first Canadian facility listed here was tested on a room-by-room basis for each lab room, whereas the second Canadian facility was
tested as a whole at the containment perimeter. Both the Canadian facilities’ walls were constructed with double layer gypsum drywall
and were tested using a pressure decay of each space from 500 Pa to 0 Pa, for the time required for the pressure to drop to 0 Pa. The
starting and ending atmospheric and gauge pressures were known, along with total room volume and space temperature. These
values were used to calculate a l/s (cfm) leakage rate normalized to room differential pressure of 250 Pa, flow per square meter of
surface area, and percentage of room volume per minute.
We compared the final measured leakage rates, calculated flow per square meter of room surface area, percent of room volume of
leakage per minute at equivalent differential pressures of 250 Pa, and pressure decay rate from 500 Pa to 250 Pa. From these results,
we see that about half of the labs fall below the ARS greenhouse requirement of 0.139 l/s per square meter of room surface area at a
pressure differential of 250Pa. We also see that the leakage rates for the same rooms also fall below the Merrick acceptance leakage
rate of 1.41% of room volume per minute at a pressure differential of 250Pa.
Leakage Measured Leakage per Area Leakage per Vol
Canadian Facilities Volume Surf. Area @ 250Pa (L/s) L/s per sq.m %vol per min Decay Rate
Room # Room Name cu.m sq.m (Pass =22.4) (Pass = 0.139) (Pass = 1.41) 500Pa to 250Pa (s)
20-097 Lab 141.6 189.1 286.85 1.5171 12.15 1.0
20-098 Procedure 45.1 79.3 13.87 0.1750 1.85 6.8
20-099 Lab 112.5 156.9 160.59 1.0237 8.57 1.5
20-106 Procedure 42.1 74.9 3.67 0.0490 0.52 24.0
20-107 Procedure 42.1 75.2 12.94 0.1722 1.85 6.8
20-108 Procedure 41.3 73.7 11.99 0.1626 1.74 7.2
20-109 Procedure 42.1 74.9 9.46 0.1263 1.35 9.3
20-110 Lab 96.5 153.5 12.12 0.0789 0.75 16.7
MM Total Vol 289.9 352.7 23.32 0.0661 0.48 26.0
Figure 3.5: Canadian Facilities Comparison
If we compare the leakage rates to the AS/NZS acceptance criteria of 22.4 l/s at a differential pressure of 250Pa, we also see that most
of the rooms passed the criteria. However, note the wide fluctuations in flow ranging from 5 l/s to over 22 l/s, which is almost directly
related to the size of the room.
The airflow leakage rate measured here is significantly tighter than other facilities and comparable to the CBS/ARS requirement of 20
minutes (1200 seconds) for a pressure decay from 500 Pa to 250 Pa. This is expected as the construction materials and techniques
are like those applied to CL3-Ag and CL4 facilities.
Leakage Measured Leakage per Area Leakage per Vol
European Facility #1 Volume Surf. Area @ 250Pa (L/s) L/s per sq.m %vol per min Decay Rate
Room # Room Name cu.m sq.m (Pass =22.4) (Pass = 0.139) (Pass = 1.41) 500Pa to 250Pa (s)
GE07B Animal 49.725 76.5 0.19 0.0025 0.02 547.5
GE08 Animal 126.425 194.5 0.27 0.0014 0.01 986.0
GE09 Animal 77.831 119.74 0.13 0.0011 0.01 1214.0
GE10 Animal 77.831 119.74 0.30 0.0025 0.02 539.6
GE11 Animal 77.831 119.74 0.31 0.0026 0.02 520.3
GE12 Animal 77.831 119.74 0.20 0.0017 0.02 809.3
GE13 Animal 96.98 149.2 0.32 0.0022 0.02 625.9
GE14 Animal 48.867 75.18 0.15 0.0019 0.02 703.6
GE16 Animal 81.38 125.2 0.15 0.0012 0.01 1171.7
Figure 3.6: European Facility Comparison
www.merrick.com 14
4 CONCLUSIONS
A fixed leakage rate for all facility sizes does not make sense since leakage is a function of surface area. So a room with a large
surface are and large volume will inherently leak more than a smaller room constructed of the same materials and construction
methods. A fixed leakage rate is comparable to saying a 3000kg truck and a 600kg car can both drive the same distance on 1 liter of
gasoline. Although it may be possible, we recommend that improved testing methodologies consider the size of the room.
The rooms tested were tallied with pass rates identified for each of the three comparative leakage rates at a room differential of 250 Pa
(1 inch w.c.). Data from US facility 3 and the European facility were ignored in this tabulation, since these facilities were constructed
with higher standards and construction methodologies that exceed typical CL3 construction. The results are shown in Figure 4.1 below.
Room Pass Rate at Room Differential Pressure of 250Pa
AS/NZS AS/NZS ARS Greenhouse Room vol/min German VDI
Facility (2.24L/s) (22.4L/s) (0.139L/s per sq.m) 1.41% (0.036L/s per sq.m)
Australian 13% 63% 44% 44% 25%
US Facility #1 0% 100% 70% 80% 0%
US Facility #2 0% 68% 64% 68% 0%
Canada Facilities 0% 67% 44% 44% 0%
Average 3% 74% 55% 59% 6%
Figure 4.1: Leakage Pass Rate Comparisons Across Projects
Note that none of the above facilities in the US or Canada passed the German VDI standard, and yet all the facilities reported are
acceptable to national biosafety regulations and have been certified to operate at CL3. Additional testing has also proven that
fumigation of these spaces has been carried out without adverse effects to surrounding areas within the building. This suggests that the
German VDI standard may be more stringent than is required for typical CL3 construction and should not be used to validate facilities
constructed of drywall or CMU.
The ARS greenhouse leakage rate acceptance criteria of 0.139 l/s per square meter (0.027 cfm per square foot) or room surface area
at a room differential pressure of 250 Pa (1 inch of wc) seems to provide a room integrity test standard that is challenging but
achievable. Fifty-five percent of the rooms tested pass the criteria with typical CL3 construction methodologies, including single and
double wall gypsum and CMU.
The Merrick best practice rate of 1.41% of room volume at a room differential pressure of 250 Pa appears to offer similar challenging
but achievable test results with 59% of rooms tested passing the criteria with the same CL3 construction methodologies.
Although not all rooms tested pass the above suggested criteria, it is important to note that such requirements were not originally
specified and thus there was no reason for the contractor to apply better quality control techniques to achieve improved performance.
For example, if you look closely at the data for US facility 2, you see that two of the large labs passed all criteria, while five others of the
same volume and surface area had almost twice the leakage and failed all criteria. If two of the same sized labs can easily pass the
criteria, then surely the others can be sealed to the same standard of care to achieve the same results.
We also note that for rooms that are primary containment but still rated as CL3 (not CL3Ag or CL4), a risk assessment should be
undertaken to validate acceptable leakage rates. Such spaces may have an increased requirement to contain potentially aerosolized
agents and will likely see more frequent room fumigations occurring several times per year. Under these circumstances, consideration
should be given to higher quality construction, and increased testing criteria such as that identified by the German VDI Guidelines.
www.merrick.com 15
5 RECOMMENDATIONS:
Industry standard construction materials and methods for CL3 Laboratories around the world typically use gypsum board or CMU with
impermeable coatings. It is often difficult to obtain room pressure differentials above 250Pa for such construction and often, it is
desirable to perform testing at lower pressures so as not to cause any damage to the structural integrity of the space. At the same time,
pressures less than 125 Pa lead to inaccurate leakage rates and are not recommended. If the structure can handle the pressures, it is
recommended to test the spaces at 250Pa (1 inch of wc) or greater, and could be positive or negative pressure differentials, or both.
1. Initial leaks are identified with smoke pencil or soap bubble testing and repairs are made to seal all visible leaks.
2. Use a quantifiable leakage rate to verify the room meets minimum leakage requirements.
This procedure avoids several problems common to CL3 construction and testing practices and ensures a better end product for the
user:
1. If only relying on visual methods, contractors may introduce gross leaks that are easily identified and repaired, ignoring
small leaks.
2. Even if done by a third party, the quality of smoke pencil and soap bubble testing is a function of the operator, and someone
with less experience may not find all the leak points.
3. Quantitative testing alone may leave small holes that would be found with visual indicators such as smoke pencil or soap
bubbles.
The ARS greenhouse recommended leakage rate at a room differential pressure of 300 Pa (1.2 inches of wc) of 0.152 l/s per square
meter (0.03cfm per square foot) of surface area is recommended as an acceptable criterion for testing construction boundaries of CL3
laboratories constructed using todays common CL3 construction practices. We also note that a specific containment facility in the
United Kingdom has adopted an acceptable leak test rate for CL3 spaces which is equivalent to the ARS greenhouse standard. The
table in figure 5.1 below identifies the ARS greenhouse flow per unit area recommended leakage equivalence for different room
differential pressures, with the yellow highlight as the actual published value.
ARS Greenhouse Leakage Equivalency Table
Pressure Leakage Pressure Leakage
Pa L/s per sq.m inch of w.c. CFM per sq.ft
500 0.196 2 0.039
400 0.176 1.6 0.035
375 0.170 1.5 0.033
350 0.164 1.4 0.032
300 0.152 1.2 0.030
250 0.139 1 0.027
200 0.124 0.8 0.024
150 0.107 0.6 0.021
125 0.098 0.5 0.019
Figure 5.1: ARS Greenhouse Leakage Equivalence vs Room Differential Pressure
www.merrick.com 16
The Merrick best practice leakage rate at a room differential pressure of 500 Pa (2 inches of wc) of 2% of room volume per minute also
produces similar results and could be considered as an alternative test method. Note that the equivalent pressure decay rate is very
short and thus difficult to quantify. If using a pressure decay rate, the time should be taken measured to decay from starting pressure to
half the starting pressure for accuracy. The table in figure 5.2 below identifies the percent of room volume recommended leakage
equivalence for different room differential pressures and equivalent pressure decay rates to half of the starting pressure.
Percent Volume Leakage Equivalency Table
Pressure Pressure Leakage Decay to Decay to Decay Rate
Pa inch of w.c. %Vol per Min Press. (Pa) Press. of w.c. (seconds)
500 2.0 2.00 250 1.00 8.9
400 1.6 1.79 200 0.80 7.9
375 1.5 1.73 188 0.75 7.7
350 1.4 1.67 175 0.70 7.4
300 1.2 1.55 150 0.60 6.9
250 1.0 1.41 125 0.50 6.3
200 0.8 1.26 100 0.40 5.6
150 0.6 1.10
125 0.5 1.00
Figure 5.2: Percent Volume Leakage and Pressure Decay Equivalence vs Room Differential Pressure
For rooms that are primary containment but still rated as CL3 (not CL3Ag or CL4), or CL3 spaces that may have an increased
frequency of room fumigations, should follow the more stringent requirements of the German VDI guidelines. The acceptable leakage
rate at a room pressure differential of 250 Pa (1 inch of wc) is noted 0.03620L/s per square meter (0.007CFM per square foot) of room
surface area. The table in figure 5.3 below identifies the VDI flow per unit area recommended leakage equivalence for different room
differential pressures, with the yellow highlight as the actual published value at 250Pa room differential pressure. The acceptable
airflows as a result of following the VDI standard are quite low, so appropriate instrumentation such as a rotameter needs to be used
for accurate measurements.
German Leakage Class 4
Pressure Leakage Pressure Leakage
Pa L/s per sq.m inch of w.c. CFM per sq.ft
500 0.057 2 0.011
400 0.049 1.6 0.010
375 0.047 1.5 0.009
350 0.045 1.4 0.009
300 0.041 1.2 0.008
250 0.036 1 0.007
200 0.031 0.8 0.006
150 0.026 0.6 0.005
125 0.023 0.5 0.005
Figure 5.3: German VDI Leakage per Unit Area vs Different Room Differential Pressure
www.merrick.com 17
APPENDIX A: EXPLANATORY NOTES ON LEAK
TESTING
The recommended testing procedure is a two-step process; 1) Initial leaks are identified with smoke pencil or soap bubble testing in a
qualitative manner and repairs are made to seal all visible leaks.2) A quantifiable leakage rate is used to verify the room meets
minimum leakage requirements.
Quantifiable leakage rate can be determined from tables in the recommendations of the body of the report or through a project specific
risk assessment.
Seal ventilation openings with plastic and tape. If provided, use bubble tight dampers in ductwork.
Provide a calibrated digital manometer installed across the containment perimeter in a manner to minimize interference with wind or
ventilation turbulence and to accurately represent the interior and exterior differential air pressure.
2 Use a smoke pencil and/or a liquid detergent for soap bubble testing at locations that could be point sources of air leakage.
2.1 Note that a room positive pressure is desirable for smoke pencil testing to easily see the smoke escaping through pin
holes, while a room negative pressure is desirable for soap bubble testing to easily see bubbles forming on air being
drawn in through pin holes.
2.1 Identify all relevant leak points for repair
2.2 Any leaks found through smoke pencil and/or soap bubble testing shall be repaired.
2 Record/trend room pressure and airflow over a 20-minute period at five second intervals.
3 Acceptance Criteria: Leakage rate is less then pre-determined quantifiable leakage rate.
www.merrick.com 18
APPENDIX B: FORMULAS AND SUPPORTING
CALCULATIONS
B-1 ORIFICE EQUATION
Using the published ASHRAE formula for crack leakage, airflow through a crack can be calculated as:
Q = C * A * dP^0.5,
Where Q = flow, C = the flow constant, A = orifice area, and dP = the pressure differential across the crack. To calculate the estimated
flow at different pressures, the flow constant and the orifice area can be assumed to be equal, thus the formula can be reduced to:
Q2 = Q1 * (dP2/dP1)^0.5.
To compare the results from the different test facilities, all leakage rates were correlated to an equivalent leakage rate at a differential
pressure of 250Pa (1 inch wc) using this formula.
PV=nRT,
Where P = absolute pressure in Pascals, V = the volume of the occupied gas in cubic meters, n = the number of moles of the gas, R =
the universal gas constant (8.314 Pa·m3/(K·mol)), and T = the absolute temperature in Kelvin.
For an ideal gas, such as air, at room temperature and pressure, 1 mole of gas occupies 24.5 liters of space.
The ideal gas laws are used to calculate the number of mols of air that escape during a pressure decay test, which can then be
converted to a flow rate. Refer to B-6 for more information on these calculations.
www.merrick.com 19
B-4 CONVERSION OF PRESSURE DECAY TO LEAKAGE RATE
For the purposes of this analysis, we will assume a typical laboratory space, 10m long, by 3.3m wide, by 3m tall. We will demonstrate
the equivalences of each test procedure using this typical space, by calculating the equivalent leakage rate. For these purposes, we
will assume the starting gauge pressure is 120 Pa. Assuming the atmospheric pressure is standard 101.3 kPa, then the actual starting
pressure is 101,420 Pa. The ending gauge pressure is 20 Pa, or equivalent actual pressure of 101,320 Pa. The time it took for the
pressure to decay the specified amounts is five minutes.
n1 = P1V/RT
n1 = 101,420Pa * 99m3 / 8.314 x 298K
n1 = 4,052.6 mols
n2 = P2V/RT
n2 = 101,320Pa * 99m3 / 8.314 x 298K
n2 = 4,048.6 mols
And after decay, the number of mols escaping the space is:
ne = 4,052.6 – 4048.6
ne = 4 mols
Assuming that on average, I mol of gas occupies 24.5 liters of volume at room temperature and pressure, the volume of standard air
escaped from the space after five minutes is:
Va = 24.5l * 4 mols
Va = 98l
The average airflow leakage (AL) from the space is calculated as:
Using the AHRAE formula for crack leakage, the proposed leakage rate at a pressure of 250 Pa can be calculated:
Q2 = Q1 * (dP2/dP1)^0.5.
Q2 = 0.327L/s * (250Pa/70Pa)^0.5
Q2 = 0.61L/s (1.3CFM)
This leakage rate can be easily converted into a cfm per square foot or percentage of room leakage value based off the assumed
surface area and volumes of the room, as demonstrated in other sections of this report.
www.merrick.com 20
B-5 EFFECTS OF TEMPERATURE
Using the ideal gas law, the effects of temperature on pressure were calculated and recorded in Figure B-1. Note that small
temperature changes of 0.05°C (0.09°F), can result in pressure fluctuations of 17 Pa (0.07”), which can be detrimental to pressure
measurements when trying to record changes less than 25 Pa (0.1”). Therefore when performing any boundary integrity test, it is
critical that the space temperature is also monitored and confirmed to be stable throughout the duration of the test.
www.merrick.com 21
REFERENCES
The Air Tightness Testing & Measurement Association, Technical Standard L2 (2010, April). “Measuring Air Permeability in the
Envelopes of Buildings (Non-Dwellings)”
American Society of Heating, Refrigerating and Air-Conditioning Engineers, ANSI/ASHRAE/IES Standard 90.1 (2016). “Energy
Standard for Buildings Except Low-Rise Residential Buildings”
American Society of Safety Professionals (2014). “Testing and Performance-Verification Methodologies for Ventilation Systems for
Biosafety Level 3 (BSL-3) and Animal Biosafety Level 3 (ABSL-3) Facilities”
Australian/New Zealand Standard, AS/NZS 2243.3 (2010, September 17). “Safety in laboratories - Part 3: Microbiological safety and
containment”
Health and Safety Executive, “Sealability of Microbiological Containment Level 3 and 4 Facilities,”
Health and Safety Executive, Advisory Committee on Dangerous Pathogens (2018). “Management and Operation of Microbiological
Containment Laboratories”
McGurk Gordon B. (2009) “A Study of Air-tightness in Australian High-level Bio-containment Facilities”, American Biological Safety
Association, Applied Biosafety Vol. 14, No. 2.
National Institutes of Health (NIH) Design Requirements Manual (DRM), Revision 1.4: 04.24.2019
NSF International Standard/American National Standard, NSF/ANSI 49 (2016, June 24). “Biosafety Cabinetry: Design, Construction,
Performance, and Field Certification”
Public Health Agency of Canada (2015, March). “Canadian Biosafety Standard Second Edition”
United States Department of Agriculture Research, Education, and Economics (2012, May 1). “ARS Facility Design Standards ARS-
242.1”
US Army Corps of Engineers Engineer Research and Development Center (2012, May 11). “U.S. Army Corps of Engineers Air
Leakage Test Protocol for Building Envelopes”
U.S. Department of Health and Human Services, Public Health Service, Centers for Disease Control and Prevention, National Institutes
of Health, HHS Publication No. (CDC) 21-1112 (2009 December). “Biosafety in Microbiological and Biomedical Laboratories – 5th
Edition”
Verein Deutscher Ingenieure, VDI 2083 Part 19 (2018, August). “Cleanroom technology Tightness of containments Classification,
planning, and testing”
www.merrick.com 22