Preliminary Infrastructure Report
Preliminary Infrastructure Report
SEMESTER 1 2023/2024
Content Pages
1.0 Company Profile 1-3
1.1 Company Background
1.2 Company Vision and Mission
1.3 Organizational Chart
2.0 Project Brief 4
3.0 Location 5
4.0 Scope of Project 6
5.0 Duties and Responsibilities of Company 7
5.1 Work Distribution of Team for Infrastructure
5.1.1 Earthwork
5.1.2 Road and Drainage
5.1.3 Sewerage Reticulation
5.1.4 Water Reticulation
6.0 Earthwork 8-22
6.1 Earthwork Planning and Design
6.2 Proposed Level
6.3 Cut & Fill
6.4 Submission Drawings & Requirements
7.0 Road and Drainage
8.0 Sewerage Reticulation
9.0 Water Reticulation
10.0 Cost Estimation of Infrastructure Works
1.0 Company Profile
Vision:
At Civil Craft Consultants, our vision is to lead the way in the civil and structural engineering
consultancy field, setting new standards for innovation, sustainability, and excellence. We
strive to be recognized as a global leader, committed to shaping a sustainable and resilient built
environment. Our unwavering dedication to engineering excellence, ethical practices, and
client satisfaction will drive us to continually exceed expectations."
Mission:
Our mission at Civil Craft Consultants is to provide cutting-edge civil and structural
engineering solutions that transform our world for the better. We are committed to:
1. Delivering Exceptional Expertise: We aim to provide our clients with the highest level
of engineering expertise, staying at the forefront of industry advancements and
technologies.
2. Sustainable Design: We pledge to integrate sustainability into every project,
minimizing environmental impact, conserving resources, and creating enduring
structures for future generations.
3. Client-Centric Approach: We prioritize our clients' objectives and needs, working
collaboratively to develop tailored solutions that meet their goals and budget.
1.3 Organization Chart
Table 2.1
Project Proposal to build and complete a five-storey flat
that consists of 38 units at Lot PT34803, Parit
Raja, Johor.
Location Parit Raja, Johor
Client BFC Development Sdn. Bhd.
Architect Archi Centre Sdn. Bhd.
C&S Consultant Civil Craft Consultant Sdn. Bhd.
Quantity Surveyor Consultant Quantify Pro Consultants
Mechanical & Electrical MECTRIX Engineering
Consultant
Planner Urban Vision Planners
Estimated Cost 5 million
Duration of Project 18 Months
3.0 Location
The proposed site is at Lot Pt 34803, Parit Raja, Batu Pahat, Johor. The location is between
Batu Pahat town and Ayer Hitam town. The site project area can be accessed from Jalan Bahru
which connected to a main road namely Jalan Kluang. The flat consists five-storey with 38
housing units.
LOT PT
34803
The architectural design phase will encompass the creation of detailed blueprints, floor
plans, and elevations, ensuring efficient space utilization, aesthetic appeal, and adherence to
local building codes and regulations. Structural engineering will be a critical aspect, ensuring
the construction's integrity, strength, and durability. This includes the foundation, load-bearing
structures, and earthquake-resistant design where applicable.
The installation of electrical and plumbing systems will involve providing safe and
efficient power and water supply to each unit. Interior finishes will cover the layout,
partitioning, flooring, and fixtures within the units, while exterior finishes will encompass the
facade, roofing, and common areas. Landscaping will be essential for creating a pleasant and
eco-friendly environment surrounding the building. The project will also involve obtaining
necessary permits, adhering to environmental standards, and ensuring the safety of both
workers and future residents throughout the construction process.
The successful completion of this project will result in a residential flat with 38 well-
appointed and energy-efficient units, ready for occupancy. This project will require close
collaboration with architects, engineers, construction teams, and regulatory authorities to
ensure its successful execution.
5.0 Company’s Duties and Responsibilities
CivilCraft Consultants main responsibility is to:
• provide clients with professional advice and direction so they may make well-informed
decisions about their building projects.
• manage the project, making sure that work proceeds in accordance with plans,
schedules, and financial limitations.
• assist clients in navigating the complex regulatory environment, obtaining required
permissions, and ensure compliance with building codes and safety standards.
• assist clients in achieving their goals in an efficient and economical manner by serving
as a helpful partner at every stage of a building project.
• design and analysis of structure.
5.1.1 Earthwork
Chong Ming Quan will be involved in earthwork planning, design and cost estimation. The
earthwork design and calculation will be checked by Nur Syaza Ashiqin Binti Abdullah.
1. The work shall include the excavation of all types of material, backfilling, compaction,
forming embankments and slopes, etc., as is necessary for the completion of the Works
up to the formation levels, in accordance with the lines, grades, dimensions, shapes and
typical cross- sections shown on the Drawings and to the approval of the S.O.
2. The Contractor shall provide where necessary temporary water courses, ditches, drains,
pumping or other means of maintaining the earthworks free from water. Such provision
shall include carrying out the work of forming the cuttings and embankments in such a
manner that their surfaces have at all times a sufficient gradient to enable them to shed
water and prevent ponding.
3. In pumping out excavations and in the lowering of water tables the Contractor shall pay
due regard to the stability of all structures.
4. Adequate means for trapping silt shall be provided on all temporary drainage systems.
Similar arrangements shall be made for all earthworks including excavations whether
for pile trenches, foundations or cuttings.
5. Should the surface of completed areas be damaged by erosion or by any other cause
the Contractor shall at his own cost make good such areas to the satisfaction of the
S.O.
NO. RUJUKAN FAIL:
JADUAL KEDUA
[Subkaedah 2(2)]
Pelan mestilah:
(a) Dilukis mengikut skala yang sesuai beza antara 1:200 hingga 1:1000
atau yang setara dengannya, termasuk suatu pelan punca yang
dilukis mengikut skala 1 inci bagi 1.6 km atau 1:50,000 meliputi
kawasan dalam jarak lingkungan 5 km dari pemajuan yang
dicadangkan itu; dan tunjukkan semua penanda batu jarak
lingkungan itu;
(b) Menunjukkan tapak sebenar di mana bangunan yang dicadangkan itu
akan didirikan atau, mengenai bangunan yang sedia ada, tapak
sebenar di mana bangunan itu berdiri;
(c) Menunjukkan nombor lot dan kawasan tanah;
(g) Menunjukkan jalan masuk yang sah dari tapak ke jalan raya;
(n) Menyediakan ruang syarat teknikal dan ruang syarat kelulusan pihak
berkuasa perancang tempatan di atas pelan;
(s) Kos.
4. Dokumen-dokumen sah untuk menjamin adanya laluan yang sah dari tapak ke
jalan raya.
Original ground level can be obtained from contour plan of construction are. From the grid
shown above:
1A=15.0
1B=15.8
2A=15.9
2B=16.2
Average OGL is calculated by sum all OGL value and divide with total number ofOGL value.
(15.0 + 15.8 + 15.9 + 16.2)/4 = 15.725
Proposed level can be obtained by referring architect plan provided. For this project, proposed
level is 15.50.
Volume of soil was determined to identify whether the soil need to be cut or fill forthat area.
Volume of soil required is calculated as follow:
=(OGL – Proposed level) x Grid area
=(15.725-15.50)x100𝑚2
=22.5𝑚3
2.0 Earthworks