The switchgear offered shall meet the type test requirements of at least the
standards listed
below:
6.1.1 High-voltage switches per IEC 62271-103
Di e l e c t r i c Tests
Te m p er a t u r e Rise Tests
Dielectric Tests
Short-circuit Tests
16
Saudi Electricity Company
Distribution Services Sector
SPECIFICATIONS FOR NON-EXTENSIBLE Issue Date: 03/2022 Page: 17 of 25
SF6 INSULATED RING MAIN UNIT, 17.5KV 32-SDMS-01 REV.03
Accuracy test.
6.1.4 Control panel and parts as per IEC 60068-2-1 and 60068-2-2
Environmental test.
6.1.5 Degree of protection as per IEC 60529 and SEC specification no. 01-
SDMS-01 latest revision.
6.1.6 The cable box and bus bar compartment shall be arc resistant as per IEC
62271-200 amended up to date. The internal arc fault test on cable box
and bus bar compartment shall be carried out for short circuit current.
6.2 The switchgear offered shall meet the routine test requirements of the standards
listed below:
6.2.1 High-voltage switches per IEC 62271-103.
Operation Tests.
17
Saudi Electricity Company
Distribution Services Sector
SPECIFICATIONS FOR NON-EXTENSIBLE Issue Date: 03/2022 Page: 18 of 25
SF6 INSULATED RING MAIN UNIT, 17.5KV 32-SDMS-01 REV.03
6.2.5 Each and Every frame equipped with protection relay a primary current
6.3 SEC reserves the right to visit the factory during manufacture of any or all items
covered by this specification, for inspection of material or witness of tests.
Accordingly, the manufacturer shall give SEC adequate notice of manufacturing
and testing schedule.
The testing shall be classified into the accreditation test and acceptance test. The
manufacturer should submit the test reports for the accreditation test which are
tested in a reputable international test institute.
8 Guarantee
8.1 Guarantee for the automatic RMU and RTU shall be against all defects arising out
of faulty design or workmanship or defective material for a period of five (5)
years from the date of final acceptance of the project.
8.2 Warranty period for gas tightness (seal pressure system) shall conform to IEC
62271- The CONTRACTOR shall assume full responsibility for no gas leakage
during the service life.