0% found this document useful (0 votes)
36 views

BQ Ndau

The document provides a bill of quantities for construction of a water supply project in Ndau Village. It includes items for clearing the pipeline route, excavating trenches, laying and jointing pipes, backfilling trenches, installing valves and fittings, constructing valve chambers, testing the pipeline, and materials for the pipeline and chambers. It also includes fabrication and installation of a 50m3 steel elevated water tank.

Uploaded by

KISUJA MADUHU
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views

BQ Ndau

The document provides a bill of quantities for construction of a water supply project in Ndau Village. It includes items for clearing the pipeline route, excavating trenches, laying and jointing pipes, backfilling trenches, installing valves and fittings, constructing valve chambers, testing the pipeline, and materials for the pipeline and chambers. It also includes fabrication and installation of a 50m3 steel elevated water tank.

Uploaded by

KISUJA MADUHU
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

ADDENDUM

BILL OF QUANTITIES FOR NDAU VILLAGE WATER SUPPLY CONSTRUCTION.

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT


NO. KSHS
A. CONSTRUCTION OF 8.305KM
PIPELINE

Clearing of pipeline route


1.0 Clear pipeline route of bushes,
undergrowth, trees, debris and rubbish
and dispose. Width of clearance to be
2.0m to accommodate for access road
and trench and excavation of materials. M2 1,850

Excavation
1.1 Excavate for pipe trench to a depth not
exceeding 1000mm for 80mm diameter
Pvc pipes class D, prepare bed on
completion of excavation. M 925

1.2 Excavate for pipe trench to a depth not


exceeding 1000mm for 50mm diameter
Pvc pipes class D, prepare bed on
completion of excavation. M 680

1.3 Excavate for pipe trench to a depth not


exceeding 1000mm for 25mm diameter
Pvc pipes class D, prepare bed on
completion of excavation. M 1,000

1.4 Excavate for pipe trench to a depth not


exceeding 1000mm for 20mm diameter
Pvc pipes class D, prepare bed on
completion of excavation. M 3,000

1.5 Excavate for pipe trench to a depth not


exceeding 1000mm for 20mm diameter
PPR pipes class D, prepare bed on
completion of excavation. M 2,700

SUB-TOTAL
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
NO. KSHS

Balance Brought Forward

Laying and jointing of pvc pipes.


1.6 Distribute, lay and joint 80mm diameter
Pvc pipes class D in trench including
making provisions for appurtenances
and pipe fittings as per specifications. M 925

1.7 Distribute, lay and joint 50mm diameter


Pvc pipes class D in trench including
making provisions for appurtenances
and pipe fittings as per specifications. M 680

1.8 Distribute, lay and joint 25mm diameter


Pvc pipes class D in trench including
making provisions for appurtenances
and pipe fittings as per specifications. M 1,000

1.9 Distribute, lay and joint 20mm diameter


Pvc pipes class D in trench including
making provisions for appurtenances
and pipe fittings as per specifications. M 3,000

2.0 Distribute, lay and joint 20mm diameter


PPR pipes for meter installation. M 2,700

SUB-TOTAL
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
NO. KSHS

Balance Brought Forward

Backfilling
2.1 Backfill trench using well selected
excavated material after laying and
jointing the 80mm, 50mm, 25mm and
20mm PVC and PPR pipes. M 8,305

Installation of Consumer Water


Meters
2.2 Distribute and install No.576 of 15mm
Kent Water Meters as directed by the No. 576
Engineer.

Road crossing
2.3 Allow for provision of road crossing;
culvert construction and casing for PVC Lump
pipes. sum 1

Construction of valve chambers


2.4 Construct standard reinforced concrete
valve chambers. Include for hardcore
fill, boxing out for manhole and fixing
of 1No. MS manhole cover and frame
light duty 600x 450mm for water
master meters, air valves and washout. No. 3

Pressure Testing & Disinfection.


2.5 Allow for carrying out pressure testing
on pipeline. M 1,605

Installation of Air Valves, Wash out


and Water Master Meters.
2.6 Install rising air valves wash out and
water master meters and connect to
pipeline as instructed on site. No. 3

SUB-TOTAL
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
NO. KSHS

Balance Brought Forward

2.7 INSTALLATION OF AIR VALVES,


WASH OUT AND WATER
METERS
Provide and install 2” water meters at
inter connection of the 80mm diameter
PVC Pipeline. No. 3

CONSTRUCTION OF
INTERCONNECTION
CHAMBERS.
2.8 Supply all materials, construct
chambers for interconnection of the
gravity main of 80mm diameter and the
extension distribution mains of 50mm No. 5

2.9 Install and connect to pipeline sluice


valve and all other fittings. No. 3

Miscellenious
3.0 Provide concrete class 15 include for
the required formwork and additional
excavation for anchor blocks and
surrounding of pipeline as directed by
the Engineer (Provisional). No. 10

MARK POST
3.1 Provide, lay and fix in place and paint
pre-cast reinforced concrete marker
posts along the pipeline at 200m
interval, the posts to be with letter
100mm, 80mm and 50mm posts be
painted blue. The size to be 75mm
x100mm x 150mm long. No. 18

SUB-TOTAL
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
NO. KSHS

Balance Brought Forward

B. MATERIALS FOR PIPELINE.

1. PVC 80mm Diameter pipes class D No. 155

2. PVC 50mm Diameter pipes class D No. 114

3. PVC 25mm Diameter pipes class D No. 167

4. PVC 20mm Diameter pipes class D No. 650

5. PPR 20mm Diameter pipes class D No. 450

6. 2” PVC Tee No. 20

7. 1” PVC Tee No. 168

8. 3
/4” PVC Tee No. 150

9. 3” x 2” PVC Reducing socket No. 4

10. 2” x 1” PVC Reducing socket No. 100

11. 1” x 3/4” PVC Reducing socket No. 100

12. 2” Gate valve No. 3

13. 1” Gate valve No. 50

14. 3
/4” Gate valve No. 900

15. 3
/4” G.I Elbow No. 884

16. 3
/4” G.I Bend No. 900

SUB-TOTAL
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
NO. KSHS

Balance Brought Forward

17. 3
/4” x 1/2” G.I Reducing Bush No. 1,350

18. 1
/2” Tap (Pegler) No. 221

19. 1
/2” Water Meter (Kent) No. 221

20. 2” PVC Cap No. 4

21. 2” PVC Adaptor No. 10

22. 1” PVC Adaptor No. 200

23. 3
/4” PVC Adaptor No. 1,350

24. Solfix cement LTR. 100

25. Thread Seal/Tape No. 3,000

SUB-TOTAL
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
NO. KSHS

Balance Brought Forward

MATERIALS FOR VALVE


CHAMBERS.

1. Water meter 3” (Kent) Flanged No. 1

2. Water meter 2” Flanged No. 4

3. Air valve 3” Female screwed No. 3

4. Wash out valve 3” Flanged No. 1

5. Air valve 2” Female screwed No. 3

6. Gate valve 2” U.K No. 3

7. G.I Nipple 2” No. 10

8. G.I Plain socket 2” No. 15

9. G.I Tee 2” No. 5

10. G.I Tee Flanged 3” (both sides) No. 3

11. G.I Plain socket 3” No. 6

12. PVC Adaptor 3” No. 22

13. G.I Nipple 3” No. 10

SUB-TOTAL
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
NO. KSHS

Balance Brought Forward

14. G.I Flange 3” No. 12

15. PVC Reducing Socket 3” x 2” No. 3

16. Bolts, Nuts and Washers of 16mm


Diameter of 3” length No. 32

17. Bolts, Nuts and Washers of 10mm


Diameter of 3” length No. 32

18. Gaskets 6mm thickness Kg 8

19. PVC Adaptors 2” No. 12

20. G.I Nipple 2” No. 20

21. Cast iron lockable manhole cover No. 5

22. Solfix cement LTR. 16

23. Coral Blocks 9” x 9” x 16” No. 1,000

24. Portland Cement Bag. 40

25. Building Sand M3 11

26. Ballast No. 22

PIPELINE TOTAL
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
NO. KSHS

C. FABRICATION AND
INSTALLATION OF 50M3 STEEL
ELEVATED TANK.

1.0 Excavation and earthworks.


Excavate for foundation to a depth not
exceeding 1500mm. Item 1

1.2 Tank construction


Construct a 50m3 METRIC COLD
Pressed Steel Sectional Water Storage
Tank of size 5000mm x 5000mm x
2000mm to BS 1564 Part II complete
with 1.5mm thick pitched roof cover,
Internal & External ladders, Water
Level Indicator, Vent Cleats, Stays,
Manhole with lockable cover,
Glasticord joining compound,
galvanized nuts, bolts & washers. Tank
painted with 2 coats Bituprime
internally & Aluminium paint
externally – Plate thickness 4.5mm. No. 1

1.3 Provide 15m high Tank tower to BS


449 complete with walk way, hand rail,
ladder painted with 2 coat of
Aluminium paint. No. 1

1.4 Fabricate and erection of structural steel


work for 27m steel tower. Item 1

1.5 Allow for piping costs and


transportation to site. Item 1

ELEVATED TANK TOTAL


ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
NO. KSHS

E. CONSTRUCTION OF PLANT
HOUSE.

1.0 Clear site of all bushes, scrubs,


undergrowth and trees and remove all Lump
stumps and roots and dispose. Sum 1

1.1 Excavate site commencing from 200mm


below ground level but not exceeding M3 15
1.0m deep.

1.2 Provide, place 50mm thick blinding


1:3:6 concrete mix to the strip M2 2
foundation.

1.3 Provide, place and joint 200mm thick


dressed coral stone house wall in 1:3
cement sand mortar as directed by the M2 108
engineer.

1.4 Provide, place and compact 200mm


thick hardcore for backfilling as shown
on the drawings. M2 50

1.5 Provide, place 50mm thick blinding


1:3:6 concrete mix on top of hardcore
and compact. M2 50

1.6 Provide, mix and place 100mm thick


vibrated reinforced concrete 1:2:4 mix
to floor slab. Allow for curing. M3 6

1.7 Provide, mix and place 1:3 cement sand


screed 20mm thick on top of floor slab.
Allow for curing. M2 50

TOTAL
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
NO. KSHS

Balance Brought Forward

1.8 Provide, prepare and apply 1:3 cement


sand plaster of 20mm thick to internal
sides of wall. Allow for water proof M2 90
cement and curing.

1.9 Provide, prepare and apply 1:3 cement


sand plaster of 20mm thick to external
sides of wall. Allow for curing. M2 95

Reinforcement

2.0 Provide and fix Y10 reinforcement bars


in concrete beam of plant house as
shown on drawings directed by M 255
engineer.

2.1 Provide and fix Y8 reinforcement bars


for links in concrete beams of the house
as shown on the drawing. M 274

Sundries

2.2 Provide, mix and place reinforced


concrete 1:2:4 to beam as shown on the
drawings. Allow for plastering. The
column size to be 200 x 200mm. No. 8

2.3 Allow for roof placement Item 1

TOTAL
SUMMARY OF BILL OF QUANTITIES FOR NDAU PROJECT.

BOQ DESCRIPTION AMOUNT (Kshs)


ITEM.
A Construction of 8.305Km Pipeline
B Materials for 8.305Km Pipeline
C Installation of 15m Elevated Tank
D Construction of Plant House
SUB-TOTAL
Contingencies (5%)
Project Management Fee
Branding & Commissioning
GRAND TOTAL