0% found this document useful (0 votes)
28 views

Attachment - 3 - Cell Sizing Sheet For Battery Capacity (Unit - Common, Cooling Water System)

The document contains worksheets for sizing the UPS and cooling water system sections of a power plant project. It lists load levels over time periods and calculates the required section size for each period based on factors like temperature, duration and minimum discharge rate.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views

Attachment - 3 - Cell Sizing Sheet For Battery Capacity (Unit - Common, Cooling Water System)

The document contains worksheets for sizing the UPS and cooling water system sections of a power plant project. It lists load levels over time periods and calculates the required section size for each period based on factors like temperature, duration and minimum discharge rate.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project : MD1 CFPP CELL SIZING WORK SHEET FOR UPS & COMMON

Lowest Expected
Electrolyte Temp : 25 ℃
(1) (2) (3) (4) (5) (6) (7)
Change in Duration Time to End Capacity At Required Section Size
Load Load of Period of Section T Min. Rate (3) × (6) = Rated Amp Hrs
Period (amperes) (amperes) (minutes) (minutes) (KT) Pos Values Neg Values
Section 1 - First Period Only - If A2 is greater than A1, go to Section 2.
1 A1= 2396 A1-0= 2396 M1= 1 T=M1= 1 0.80 1916.80
Sec 1 Total 1916.80
Section 2 - First Two Period Only - If A3 is greater than A2, go to Section 3.
1 A1= 2396 A1-0= 2396 M1= 1 T=M1+M2= 60 1.93 4624.28
2 A2= 1304 A2-A1= -1092 M2= 59 T=M2= 59 1.93 -2107.56
Sec 2 Sub Total 4624.28 -2107.56
Total 2516.72
Section 3 - First Three Period Only - If A4 is greater than A3, go to Section 4.
1 A1= 2396 A1-0= 2396 M1= 1 T=M1+M2+M3= 90 2.27 5438.92
2 A2= 1304 A2-A1= -1092 M2= 59 T=M2+M3= 89 2.27 -2478.84
3 A2= 908 A2-A1= -396 M3= 30 T=M3= 30 1.39 -550.44
Sec 3 Sub Total 5438.92 -3029.28
Total 2409.64
Maximum Section Size 2516.7 + Random Section Size = Uncorrected Size(US) 2516.7
US 2517 × Temp. Corr. 1 × Design Margin 1 × Aging Factor 1.25 = 3145.9

* Kt Factor: CP1600 / End voltage 1.87V

Project : MD1 CFPP CELL SIZING WORK SHEET FOR COOLING WATER SYSTEM
Lowest Expected
Electrolyte Temp : 20 ℃
(1) (2) (3) (4) (5) (6) (7)
Change in Duration Time to End Capacity At Required Section Size
Load Load of Period of Section T Min. Rate (3) × (6) = Rated Amp Hrs
Period (amperes) (amperes) (minutes) (minutes) (KT) Pos Values Neg Values
Section 1 - First Period Only - If A2 is greater than A1, go to Section 2.
1 A1= 10 A1-0= 10 M1= 1 T=M1= 1 0.29 2.90
Sec 1 Total 2.90
Section 2 - First Two Period Only - If A3 is greater than A2, go to Section 3.
1 A1= 10 A1-0= 10 M1= 1 T=M1+M2= 90 2.24 22.40
2 A2= 2 A2-A1= -8 M2= 89 T=M2= 89 2.24 -17.92
Sec 2 Sub Total 22.40 -17.92
Total 4.48
Maximum Section Size 4.5 + Random Section Size = Uncorrected Size(US) 4.48
US 4.48 × Temp. Corr. 1 × Design Margin 1 × Aging Factor 1.25 = 5.6

* Kt Factor: 12V30F / End voltage 1.8V