How To Calculate Engineering Working Hours
How To Calculate Engineering Working Hours
Working hours create realistic project schedules. It enables accurate resource allocation,
cost estimation, and critical path analysis. Project managers can assess resource productivity
and adhere to project constraints, such as night shifts or specific time windows. Working
hours aid in effective communication, ensuring stakeholders understand when activities are
scheduled. It's important for managing projects in multiple time zones.
In this article, we will explain how to calculate the working hours for Engineering work
From a practical Point of view, the P6 Schedule will not contain 100% of all project shop
drawings, We will have a summary level of the Shop Drawings. Therefore we need to do an
intermediate step to calculate the working hours accurately
Usually, the total number of the shop drawings is not inserted in the Time schedule but we
insert a summary for it to reduce the number of activities in Primavera, and to track the
Shop drawing process we create the Shop Drawings log
This is the Summary of Shop Drawings in the Time Schedule
We need to link the Shop Drawings log to the Shop Drawings in the P6 Schedule to calculate
the number of the sheets ( shop Drawings ) for each activity in the schedule
Now we need to create an Excel sheet to link the summary activities to the detailed one
This means every activity in your schedule may contain one or more shop drawings in the
Log
Create a Pivot table to count the detailed drawings to the summary one
From the Insert menu choose Pivot table
Choose the wanted range for the sheet and Select the new worksheet
Once you put the Activity name and ID in the Rown This table will show up but we need to
see the Activity name beside the Activity ID, Click on the inverted triangle beside the Activity
ID
Then Go to “Layout & Print“ then choose “Show items labels in tabular form” then press ok
This is the shape of the Pivot table, But we need to count the detailed drawings in every
summary one
Once you add the shop drawings Title in “ Values “ the Column of “ Count of ShopDrawings
Title” will show up
This is the Pivot table layout, Once you add new shop drawings in the main Table and
refresh it, It will be here and counted
If you want to calculate the weight for the activities, This Article is for you:
How to calculate Planned % and Actual % using Weight
---------------
Useful links:
Join our email Newsletter, we send useful free content regularly:
https://planningengineer.net/newsletter/
Our Services https://planningengineer.net/our-services/
Our Courses: https://planningengineer.net/lp-courses/
Support Forums: https://planningengineer.net/forums/