100% found this document useful (1 vote)
395 views

Steel Structure Estimation

Uploaded by

Honey Zaw
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
395 views

Steel Structure Estimation

Uploaded by

Honey Zaw
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

Steel Structure Building ( Super Structure )

72 M X 24 M X 6M Ht
Details Of Measurement
Measurements Deduc
No Particulars No Contents Units
L B H tion
1 Steel Structure Work
(a) H Beam
400x200x8x13 H (66Kg/m)
C1 2 13 6.00 156.00
156.00 M
10296.00 Kg
10.30 Ton
350x175x7x11 H (49.6 Kg/m)
Rafter 2 13 12.50 325.00
Collar (Rafter To Rafter Connection ) 1 13 2.00 26.00
Knee (Column To Rafter Connection ) 2 2 13 2.00 104.00
455.00 M
22568.00 Kg
22.57 Ton
300x150x6.5x9 H (36.7 Kg/m)
Gable C2 2 2 7.25 29.00
2 1 8.50 17.00
Mazzanine C2 2 3 3.00 18.00
FB1 2 5 6.00 60.00
3 4 6.00 72.00
196.00 M
7193.20 Kg
7.19 Ton
250x125x6x9 H (29.6 Kg/m)
FB2 2 4 6.00 48.00
48.00 M
1420.80 Kg
1.42 Ton
200x100x5.5x8 H (21.3 Kg/m)
TB 2 12 6.00 144.00
2 4 6.00 48.00
RTB 3 12 6.00 216.00
Landing Beam 1 2 1.00 2.00
1 2 3.00 6.00
Landing Column 1 3 1.50 4.50
Stringer 2 2 2.50 10.00
. 430.50 M
9169.65 Kg
9.17 Ton
150x75x5x7 H (14 Kg/m)
Extension Rafter 2 13 1.00 26.00
Extension Rafter Knee 2 13 0.30 7.80
33.80 M
473.20 Kg
0.47 Ton
Steel Structure Building ( Super Structure )
72 M X 24 M X 6M Ht
Details Of Measurement
Measurements Deduc
No Particulars No Contents Units
L B H tion
Total Weight Of H Beam 51.12 Ton
(b) MS Plate
25mm Thk MS Plate (18.23 Kg/Ft²)

Base Plate (Column Base)


C1 (400x200) 2 13 0.50 0.30 3.90
3.90 M²
41.98 FT²
765.36 Kg
0.77 Ton

16mm Thk MS Plate (11.67 Kg/Ft²) Collar Flange 11mm +4mm =15 mm (16mm)
C2 (300x150) 3 4 0.40 0.25 1.20
Collar (350+175) (7x11) 1 2 13 0.80 0.22 4.68
Knee (350+175) (7x11) 2 2 13 0.95 0.22 11.11
Rafter Splice (350+175)(7x11) 2 2 13 0.45 0.22 5.26
Landing Column (200x100) 1 3 0.30 0.20 0.18
22.44 M²
241.57 FT²
2819.07 Kg
2.82 Ton
14mm Thk MS Plate (10.21 Kg/Ft²) FB Flange 9mm +4mm =13 mm (14 mm)
FB1 (300x150)(6.5x9) 2 2 5 0.40 0.20 1.60
2 3 4 0.40 0.20 1.92
FB2 (250x 125) (6x9) 2 2 4 0.35 0.18 0.98
Stringer Base (200x100) (5.5x8) 1 1 2 0.30 0.20 0.12
4.62 M²
49.73 FT²
507.79 Kg
0.51 Ton
12mm Thk MS Plate (8.752 Kg/ft²) TB Flange 8mm +4mm =12 mm (12 mm)
TB (200x100) (5.5x8) 2 2 12 0.15 0.20 1.44
2 2 4 0.15 0.20 0.48
RTB (200x100) (5.5x8) 2 3 12 0.15 0.20 2.16
Gable Column C2 (cap Plate) (300*150)(6.5x9) 1 2 3 0.40 0.20 0.48
Landing Beam ( 200*100) (5.5*8) 2 1 2 0.30 0.15 0.18
2 1 2 0.30 0.15 0.18
For Stringer (200x100) (5.5x8)
Landing To Mazzanine RL 2 1 2 0.15 0.20 0.12
Floor To Landing RL (not Base Plate) 1 1 2 0.15 0.20 0.06
5.10 M²
54.90 FT²
480.50 Kg
0.48 Ton
10mm Thk MS Plate (7.293 Kg/FT²)
Steel Structure Building ( Super Structure )
72 M X 24 M X 6M Ht
Details Of Measurement
Measurements Deduc
No Particulars No Contents Units
L B H tion
Base Plate Stiffneer
C1 (400*200) 6 2 13 0.15 0.15 3.51
C2 (300*150) 6 3 4 0.15 0.15 1.62
LC (200*100) 2 1 3 0.15 0.15 0.13
Extension Rafter Plate (150*75) 1 2 13 0.40 0.13 1.30
6.56 M²
70.67 FT²
515.41 Kg
0.52 Ton
6mm Thk MS Plate (4.376 Kg/Ft²)
Stiffneer
400x200x8x13 H 156 0.40 0.20 12.48
350x175x7x11 H 455 0.35 0.18 27.87
300x150x6.5x9H 196 0.30 0.15 8.82
250x125x6x9H 48 0.25 0.13 1.50
200x100x5.5x8H 431 0.20 0.10 8.61
150x75x5x7H 34 0.15 0.08 0.38
59.66 M²
642.23 FT²
2810.38 Kg
2.81 Ton
Total Weight Of MS Plate 7.90 Ton
(c )Bolt & Nut
M 28 Anchor Bolt Nut & Washer
C1 6 2 13 156.00
156.00 Nos
M 25Anchor Bolt Nut & Washer
C2 6 3 4 72.00
72.00 Nos
M 22 Anchor Bolt Nut & Washer
Landing Column 4 1 3 12.00 Nos

M 18 Anchor Bolt Nut & Washer


For Stringer Base 6 1 2 12.00
12.00 Nos
M 20 Anchor Bolt Nut Plate 16mm Thk +4mm =20mm Bolt & Nut
Collar (350+175) (7x11) 22 1 13 286.00
Knee (350+175) (7x11) 26 2 13 676.00
Rafter Splice (350+175)(7x11) 12 2 13 312.00
1274.00 Nos
M 18 Anchor Bolt Nut Plate 14mm Thk +4mm =18mm Bolt & Nut

FB1 12 2 2 5 240.00
12 2 3 4 288.00
FB2 10 2 2 4 160.00
Steel Structure Building ( Super Structure )
72 M X 24 M X 6M Ht
Details Of Measurement
Measurements Deduc
No Particulars No Contents Units
L B H tion
688.00 Nos

M 16 Anchor Bolt Nut Plate 12mm Thk +4mm =16mm Bolt & Nut
TB (200x100) (5.5x8) 4 2 2 12 192.00
4 2 2 4 64.00
RTB (200x100) (5.5x8) 4 2 3 12 288.00
Gable Column C2 (cap Plate) (300*150)(6.5x 4 1 2 3 24.00
Landing Beam ( 200*100) (5.5*8) 4 2 1 2 16.00
4 2 1 2 16.00
For Stringer (200x100) (5.5x8)
Landing To Mazzanine RL 4 2 1 2 16.00
Floor To Landing RL (not Base Plate) 4 1 1 2 8.00
624.00 Nos
2 Painting Work Roof Member
H Beam
400x200x8x13 H 1 156.00 1.60 249.60
350x175x7x11 H 1 455.00 1.40 637.00
300x150x6.5x9H 1 196.00 1.20 235.20
250x125x6x9H 1 48.00 1.00 48.00
200x100x5.5x8H 1 430.50 0.80 344.40
150x75x5x7H 1 33.80 0.60 20.28

MS Plate
25mm Thk MS Plate 2 3.90 7.80
16mm Thk MS Plate 2 22.44 44.88
14mm Thk MS Plate 2 4.62 9.24
12mm Thk MS Plate 2 5.10 10.20
10mm Thk MS Plate 2 6.56 13.13
6mm Thk MS Plate 2 59.66 119.32
1739.05 M²
18720.78 Ft²
3 Decking Sheet
Mezzanine 1 12.00 24.00 288.00
Landing 1 3.00 1.00 3.00
For Stringer 2 2.50 1.50 7.50
Deduction 0.00
Stair -1 3.00 3.00 -9.00
289.50 M²
3116.46 FT²
Width of Decking =0.9 M 321.67 M
1055.07 RFt

Stud Bolt
Mezzanine 27 3 5 400.00
Steel Structure Building ( Super Structure )
72 M X 24 M X 6M Ht
Details Of Measurement
Measurements Deduc
No Particulars No Contents Units
L B H tion
Landing 3.33 3 2 20.00
For Stringer 2 2.78 3 2 33.33
453.33 Nos

Decking Sheet Stopper


Mezzanine 2 24.00 48.00
2 12.00 24.00
Landing 2 3.00 6.00
2 1.00 2.00
Stair 2 3.00 6.00
For Stringer 2 2 2.50 10.00
96.00 M

4 125x50x1.5 mm GI Lip Channel (5.77/2 =2.885 Kg/m) 1m c/c


Purlin
Roofing 2 14 74.00 2072.00
Wall
Line 1 & 5 2 6 72.00 864.00
Line A & M 2 6 24.00 288.00
2 3 12.00 72.00
3296.00 M
10814.18 Rft
9508.96 Kg
9.51 Ton

Purlin Cleat
Roofing 2 13 14 364.00
Wall
Line 1 & 5 2 6 13 156.00
Line A & M 2 6 5 60.00
2 3 5 30.00
610.00 Nos

M 12 Purlin & Nut


As per Purlin Cleat item 6 Nos 4 610 2440.00 Nos

5 4 Angle Sheet Roofing (0.4mm)


Roofing (0.4mm) 2 74.00 13.50 1998.00
Wall
Line 1 & 5 2 72.00 5.20 748.80
Line A & M 2 24.00 5.20 249.60
2 12.00 2.50 60.00
3056.40 M²
32902.03 Ft²
Steel Structure Building ( Super Structure )
72 M X 24 M X 6M Ht
Details Of Measurement
Measurements Deduc
No Particulars No Contents Units
L B H tion
4158.37 M
Width of Roofing Sheet =0.735 M 13643.60 RFT

Roofing Screw
Roof 2 3 101 14 8457.14
Wall 0.00
Line 1 & 5 2 3 98 6 3526.53
Line A & M 2 3 33 6 1175.51
2 3 16 3 293.88
13453.06 Nos

Ø12 RB Sag Rod


Roof 2 13 12 312.00
Wall
Line 1 & 5 2 5 12 120.00
Line A & M 2 5 4 40.00
2 2 4 16.00
488.00 Nos

Ø18 Bracing 2 2 8 32.00


32.00 Nos

Turn Buckle 32.00 Nos

Gutter 2 74.00 148.00


Gutter Lapping 2 12 0.15 3.70
151.70 M
497.73 Rft

Gutter Hook 2 123 166.00 Nos

Down Take Pipe (100mm) 2 13 8.60 223.60 M


733.63 Rft

Down Take Pipe Cleat (saddle) 14 2 13 372.67 Nos

Elbow 90' 1 2 13 26.00 Nos

Elbow 45' 2 2 13 52.00 Nos

Silicon 86.99 Nos

6 Ridging , Capping
Steel Structure Building ( Super Structure )
72 M X 24 M X 6M Ht
Details Of Measurement
Measurements Deduc
No Particulars No Contents Units
L B H tion
Ridge 1 74.00 74.00
Ridge Lapping 12 0.15 1.85
wall 2 72.00 144.00
2 24.00 48.00
Conner 4 5.15 20.60
Eave board 2 2 13.50 54.00
342.45 M
1123.58 Rft
Steel Structure Building ( Super Structure )
72 M X 24 M X 6M Ht
Builder's Estimate
No Particular Unit Quantity Rate Per Amount

1 Steel Structure Fabrication & Installation Work Ton 61.97

400x200x8x13 H Ton 10.81 670000.00 Ton 7243236.00


350x175x7x11 H Ton 23.70 780000.00 Ton 18483192.00
300x150x6.5x9 H Ton 7.55 690000.00 Ton 5211473.40
250x125x6x9 H Ton 1.49 670000.00 Ton 999532.80
200x100x5.5x8 H Ton 9.63 670000.00 Ton 6450848.77
150x75x5x7 H Ton 0.50 670000.00 Ton 332896.20
25mm Thk MS Plate Ton 0.80 660000.00 Ton 530392.01
16mm Thk MS Plate Ton 2.96 660000.00 Ton 1953616.90
14mm Thk MS Plate Ton 0.53 660000.00 Ton 351895.26
12mm Thk MS Plate Ton 0.50 650000.00 Ton 327938.65
10mm Thk MS Plate Ton 0.54 650000.00 Ton 351767.78
6mm Thk MS Plate Ton 2.95 650000.00 Ton 1918087.43
M 28 Anchor Bolt Nut & Washer Nos 163.80 4500.00 Nos 737100.00
M 25 Anchor Bolt Nut & Washer Nos 75.60 4500.00 Nos 340200.00
M 22 Anchor Bolt Nut & Washer Nos 12.60 4000.00 Nos 50400.00
M 18 Anchor Bolt Nut & Washer Nos 12.60 3000.00 Nos 37800.00
M 20 Anchor Bolt Nos 1337.70 1000.00 Nos 1337700.00
M 18 Anchor Bolt Nos 722.40 300.00 Nos 216720.00
M 16 Anchor Bolt Nos 655.20 200.00 Nos 131040.00
Labour Cost Ton 61.97 300000.00 Ton 18591096.88
Anchor Bolt Setting Nos 163.80 500.00 Nos 81900.00
65678834.08

2 Painting Work of Member FT² 18720.78


Enamale Painting Gal 93.60 12600.00 Gal 1179409.39
Sand Paper No 374.42 200.00 No 74883.14
3" Paint Brush No 187.21 600.00 No 112324.70
Labour Cost ft² 18720.78 90.00 FT² 1684870.55
3051487.78

3 Decking Sheet Work Sud 31.16


Decking Sheet (1.5mm) Rft 1107.82 4500.00 Rft 4985190.00
Stud Bolt Nos 476.00 300.00 Nos 142800.00
Decking Sheet Stopper M 100.80 200.00 M 20160.00
Labour Cost Sud 31.16 10000.00 Sud 311645.62
5459795.62

4 W.I works in Purlin Ton 9.51


Steel Structure Building ( Super Structure )
72 M X 24 M X 6M Ht
Builder's Estimate
No Particular Unit Quantity Rate Per Amount
125x50x1.5 mm GI Lip Channel Rft 11354.88 950 Rft 10787140.56
Purlin Cleat Nos 640.50 600.00 Nos 384300.00
M 12 Purlin & Nut Nos 2562.00 80.00 Nos 204960.00
Labour Cost Ton 9.51 150000.00 Ton 1426344.00
12802744.56

5 4 Angle Sheet Roofing & Walling Work


4 Angle Sheet(0.4mm) Rft 14325.78 950.00 Rft 13609494.26
Roofing Screw No 14125.71 30.00 No 423771.43
Ø12 RB Sag Rod No 512.40 1500.00 No 768600.00
Ø18 Bracing No 33.60 15000.00 No 504000.00
Turn Buckle No 33.60 3000.00 No 100800.00
Gutter Rft 522.61 2100.00 Rft 1097489.58
Gutter Hook No 174.30 1000.00 No 174300.00
Down Take Pipe (100mm) RFt 770.31 2100.00 RFt 1617657.68
Down Take Pipe Cleat (saddle) No 391.30 350.00 No 136955.00
Elbow 90' No 27.30 2300.00 No 62790.00
Elbow 45' No 54.60 2000.00 No 109200.00
Silicon No 91.34 1800.00 No 164418.83
Labour Cost
Roofing & Walling Sud 329.02 8000.00 Sud 2632162.14
21401638.92

6 Ridging & Capping Work RFt 1123.58


Metal Colour Ridging RFt 1179.76 1000.00 RFt 1179757.37
Labour Cost RFt 1123.58 200.00 RFt 224715.69
1404473.06

Total 109798974.02
Steel Structure Building ( Super Structure )
72 M X 24 M X 6M Ht
Bill Of Quantity
No Particulars Unit Quantity Rates Per Amount
Materials
1 400x200x8x13 H Ton 10.8108 670000 Ton 7243236
2 350x175x7x11 H Ton 23.6964 780000 Ton 18483192
3 300x150x6.5x9 H Ton 7.55286 690000 Ton 5211473.4
4 250x125x6x9 H Ton 1.49184 670000 Ton 999532.8
5 200x100x5.5x8 H Ton 9.6281325 670000 Ton 6450848.775
6 150x75x5x7 H Ton 0.49686 670000 Ton 332896.2
7 25mm Thk MS Plate Ton 0.80362425 660000 Ton 530392.00752638
8 16mm Thk MS Plate Ton 2.96002561 660000 Ton 1953616.9021558
9 14mm Thk MS Plate Ton 0.53317463 660000 Ton 351895.25681
10 12mm Thk MS Plate Ton 0.504521 650000 Ton 327938.64778256
11 10mm Thk MS Plate Ton 0.5411812 650000 Ton 351767.78204414
12 6mm Thk MS Plate Ton 2.95090374 650000 Ton 1918087.430202
13 M 28 Anchor Bolt Nut & Washer Nos 163.8 4500 Nos 737100
14 M 25 Anchor Bolt Nut & Washer Nos 75.60 4500.00 Nos 340200.00
15 M 22 Anchor Bolt Nut & Washer Nos 12.60 4000.00 Nos 50400.00
16 M 18 Anchor Bolt Nut & Washer Nos 12.6 3000 Nos 37800
17 M 20 Anchor Bolt Nos 1337.7 1000 Nos 1337700
18 M 18 Anchor Bolt Nos 722.4 300 Nos 216720
19 M 16 Anchor Bolt Nos 655.2 200 Nos 131040
20 Enamale Painting Gal 93.60 12600.00 Gal 1179409.3855191
21 Sand Paper Nos 374.42 200.00 Nos 74883.135588512
22 3" Paint Brush Nos 187.21 600.00 Nos 112324.70338277
23 Decking Sheet (1.5mm) Rft 1107.82 4500 Rft 4985190
24 Stud Bolt Nos 476 300 Nos 142800
25 Decking Sheet Stopper M 100.8 200 M 20160
26 125x50x1.5 mm GI Lip Channel Rft 11354.8848 950 Rft 10787140.56
27 Purlin Cleat Nos 640.5 600 Nos 384300
28 M 12 Purlin & Nut Nos 2562 80 Nos 204960
29 4 Angle Sheet(0.4mm) Rft 14325.7834 950 Rft 13609494.257143
30 Roofing Screw No 14125.7143 30 No 423771.42857143
31 Ø12 RB Sag Rod No 512.4 1500 No 768600
32 Ø18 Bracing No 33.6 15000 No 504000
33 Turn Buckle No 33.6 3000 No 100800
34 Gutter Rft 522.614085 2100 Rft 1097489.5785
35 Gutter Hook No 174.3 1000 No 174300
36 Down Take Pipe (100mm) RFt 770.31318 2100 RFt 1617657.678
37 Down Take Pipe Cleat (saddle) No 391.3 350 No 136955
38 Elbow 90' No 27.3 2300 No 62790
39 Elbow 45' No 54.6 2000 No 109200
40 Silicon No 91.3437961 1800 No 164418.83305714
Steel Structure Building ( Super Structure )
72 M X 24 M X 6M Ht
Bill Of Quantity
No Particulars Unit Quantity Rates Per Amount
41 Metal Colour Ridging RFt 1179.75737 1000 RFt 1179757.3725
84846239.133783
Labour
Steel Structure Fabrication & Installatio Ton 61.9703229 300000 Ton 18591096.879957
1 Anchor Bolt Setting Nos 163.8 500 Nos 81900
2 Painting Work of Member FT² 18720.78 90.00 FT² 1684870.5507415
2 Decking Sheet Work Sud 31.1645621 10000 Sud 311645.62095
3 W.I works in Purlin Ton 9.50896 150000 Ton 1426344
4 Roofing & Walling Sud 329.020268 8000 Sud 2632162.144032
5 Ridging & Capping Work RFt 1123.57845 200 RFt 224715.69
24952734.885681

Total 109798974.02
Steel Structure Building ( Super Structure )
60 M X 30 M X 6M Ht

Steel Structure Building ( Super Structure )


72Mx24Mx6M
Abstart of Cost
No Quantity Unit Particular Rate Per Amount

1 61.97 Ton Steel Structure Fabrication & Installation Work 1059843.34 Ton 65678834.08
2 18720.78 Ft² Painting Work of Member 163 Ft² 3051487.78
3 31.16 Sud Decking Sheet Work 175192.438 Sud 5459795.62
4 9.51 Ton W.I works in Purlin 1346387.47 Ton 12802744.56
5 329.02 Sud 4 Angle Sheet Roofing & Walling Work 65046.567 Sud 21401638.92
6 1123.58 RFt Ridging & Capping Work 1250 Rft 1404473.06

Total 109798974.02
Steel Structure Building ( Super Structure )
72 M X 24 M X 6M Ht
Summary
No Particulars Amount Say

1 Materials Cost 84846239.13

2 Labour Cost 24952734.89


109798974.02
3 Transportation Cost (5% of Mat) 4242311.96

4 Total Cost 114041285.98

5 QC (2%) 2280825.72

6 Commercial Tax (5%) 5702064.30

7 Overhead & Contingency (3%) 3421238.58

8 Company Profits (3%) 3421238.58

9 Grand Total 128866653.15 128990000.00