Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
46 views
62 pages
Imb SH Hse 0038
Uploaded by
01095902062ahmed
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save DOC-IMB-SH-HSE-0038 For Later
Download
Save
Save DOC-IMB-SH-HSE-0038 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
46 views
62 pages
Imb SH Hse 0038
Uploaded by
01095902062ahmed
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save DOC-IMB-SH-HSE-0038 For Later
Carousel Previous
Carousel Next
Download
Save
Save DOC-IMB-SH-HSE-0038 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 62
Search
Fullscreen
For Contractor rom cm use ont OS Spars sxe lesess ia TEING SALMAN ENERGY PARK (SPARK) INFRASTRUCTURE & MAINTENANCE BUILDING poorest cpm ber amare eet SUBMITTAL TRANSMITTAL FORM “Submittal No. Project PRRASTRUCTONE & MAINTENANCE Contractor: |BRANCH OF SINOHYDRO CORP. LTD. JBUILOING. SOc MESES ae er ee are Sama Lone ae — tele Manas COORDINATION ‘ation Beer ARPROVED * oe om 6 aN TREFROVED AS NOTED} —F qyee pyoc war use WSs rae por recn | conacraaesuawiT | —c a ere ee TOR NFORWATON o fess canyon ore oo REIECTED. t from atx recone 0089 COORDINATION. ; Old. Ret. # Dwe./ Spec. Ref. | Rev. Description Type | di Sapa | Aaion un swaseoos Monthly Environmental Report forthe Month Docime-sise-coss | on [Mom Em oc Dabaton 53 > Contractor Representative Signature ti AA, 7 Type "S0- Shop Drawings T= Centfcates SM -sample © Gr-cuarantees 8 Mo - Manufacturer's Data © or-others Remarks is workwth nat foe ToT COTTETTOW of COTES ade TOE To FISTA TNS BUT TEEW GG Tat VE Te Con aS To COMICS TNT Jpecfeavon. This checks oni fr review of general performance with he design concept af the project ané general compliance withthe nor |2ocumens. he Contractors esponsibiefor confirming and cacelating al quantities and dimensions, electing fabrication roceses and techniques of construction, coordination ades, and performing Ne workin 3 safe, tinal, and satisfactory manner. ~ Saudi Aramco Representative Date: TaqaTETS TTS TATE npvenin te covet For Saudi Aramco Use Only Contractor's Signature! Received: Received For: pare Date: 11280M Saud Aramea: Company General Use Non-Business Use> |Z —wemsintcuneaowanraaneesonons — Ne: | SESE | SBA i Date: 0570472023 Environmental Monthly Reports Paget of 19 5 MONTHLY ENVIRONMENTAL REPORT MAR -— 2023. Prepared By | Environmental Coordinator Nagalingam Reviewed By HSE Manager Saad Al Awad ‘Approved By SAPMTREQUISITION Project Name: KING SALMAN ENERGY PARK No, SHYDISECT 2022 INFRASTRUCTURE AND MAINTENANCE BUILDING fer No 00 Date: 05/04/2023 Environmental Monthly Reports Page 2 of 19 Table of Contents. Table of Reports Executive Summary General Purpose ‘Scope Environmental Aspects & Impacts Environmental Aspects Checklist. Environmental Performance Report. Environmental Targets Monitoring for Alll significant Aspects Environmental Summary Report. EC Inspection Checklist. Look Ahead Matrix Plan. ‘Temperature Monitoring Report. Monthly Generator Inspection Report. Diesel Delivery Report. Weekly Toilet Inspection. Waste Monitoring Log Sheet. Monthly Garbage Waste Disposal Monitoring Toilet Inventory Drinking Water Delivery Log Sheet. ‘Chemical Inventory. Medical Waste. Attachments.Project Name: KING SALMAN ENERGY PARK REQUISITION SHYDISECT INFRASTRUCTURE AND MAINTENANCE BUILDING Bev. No oO Date: (05/04/2023 Page 3 of 19 Environmental Monthly Reports Executive Summary. Branch of Sino hydro Corporation Ltd, as primary EPC Contractor of the development project is. inclusive like construction of maintenance building, warehouse room and parking facilities in King. ‘Salman Energy City, Abqaiq, Saudi Arabia with contract no, 6600050462 and B.INo. 25-00040, has. fulfilled its contractual obligations by periodically conducting inspections and monitoring to effectively implement the environmental programs in order to protectthe health of the worker's and to preserve and to protect the environment & it’s surroundings in compliance with the contractual requirements of the project, the government laws and regulations as wellas the stake holders. General. This Monthly Environmental Report has been prepared to comply with the Saudi Aramco. Environmental Health Code (SAEHC), General Authority of Metrology Environmental Protection (GAMEP), Saudi Arabian Government (SAG ) , Saudi Aramco & Branch of Sino hydro Corporation Ltd EPC’s Environmental Management & Protection Policies and Procedures. Purpose. The purpose of this report is to provide information and data for trend analysis to continually improve and thereby achieve the Efficiency and Effectiveness of Environmental Processes, implement of protecting the environment. Scope. This Monthly report shall cover within the scope of work under 8.1 no: 25-00040 with Contract ‘Ro : 6600050462, By Branch of Sino Hydro Corporation Ltd. ‘The Scope of work comprises of three (3) Main Packages + 1. 1. PKG-C -Dry Port Access Roads. 2. PKG-B-Maintenance Plot. 4, Training Center (CTC)Project Name: KING SALMAN ENERGY PARK INFRASTRUCTURE AND MAINTENANCE BUILDING ogee | pene sone ° Environmental Monthly Reports REQUISITION SHYDISECT No. 2022 Rev. No. 00. Date: (05/04/2025 Page 4 of 19 1.Environmental Aspects & Impacts.nana se cer oor aime namespore vom]Lay Tid { af fayREQUISITION Project Name: KING SALMAN ENERGY PARK No. ‘SHYDISEGI 2022 INFRASTRUCTURE AND MAINTENANCE BUILDING Rev. No, 00, Environmental Monthly Reports Date: (0570472023 Page 5 of 19 2.Environmental Aspects Checklist.on sou Aussie -oouery es ‘sn jemiso Avsdurg owe pres sapowen 7 - * - - - a 7 : OF Z 6 * = oe ‘uype} wos yang] * Taran pe beso eo] F - tame T a =n on vara ‘sanosey, ee “use | juoyeUMUEWED | UONMYOY Ay “sypedsy jeyumWuoKAUZ, "a9 NI on ar NOLYNOLEC OwONONS NHN sewvessnva xen vac on cusses | vuurizuamos uouriedaq siefarg wopSuy jroods, Ep etREQUISITION | SHYD/SECT No. 2022 Rev. No, 00 Date: (0570472023 Page 6 of 19 Project Name: KING SALMAN ENERGY PARK INFRASTRUCTURE AND MAINTENANCE BUILDING Environmental Monthly Reports 3.Environmental Performance Report.‘SKPD Env-FO03 Form Q tk Special Kingdom Projects Department vy JRev. 0 Date :07/11/2020 rowencuna | swstyora | _ Division/Unit: KING SALMAN NERGY PARK (SPARK) Page 1 of 2 Project Name: SPARK [Contractor name BRANCH OF SINOAYDRO COPORATION LTD. nformation/Checkist Conformation [Activity indicators lEnvronmental Audis YES [Eneronmental Taming Yes [Reactive Indicators | eae fcroenton v8 [Does it Mest the Air Qualty Standards? INotse Quality [Nowe Montonng Done |ttach Monitorng Report) Does t Meet the Standards? YES [Any Contro! Measures Provisea YES ‘Saudi Aramco: Company General Use ‘Saudi Arameo: Company General UseForm, Env-F003, Jev.0 | bate:07/11/2020 Page 2 of2 Special Kingdom Projects Department Division/Unit: KING SALMAN NERGY PARK (SPARK) Environmental Performance Report for the Month of Mar -2023 Have noise complaints being received from community? INO APPLICABLE IF yes, remeasured and repor ndings and respond {to community [Water Quality ls wastewater being dscharged fo ground, other than that used in normal constructon(ifyes, Atach Analysis INOT APPLICABLE Report) INOT APPLICABLE Is wastewater being discharged to Sea(f yes, Atach [Analysis Report) Cab Testing of Drang Water Samples from Ske done yes attach Analysis Report) Lab Testing of Drinking Water Samples from Camps done( yes, Attach Analysis Report) INOT APPLICABLE INO APPLICABLE INOT APPLICABLE Waste Management Guantiy IType of Waste generated at sites (Ton'sasiskip [Cumulative |Mode of Disposal general waste 7 LAND FILL, ‘Raonmnens Check Ar Monitoring Report Noise Monitoring Reports Water Analysis Reports Logs i Water Consumption Log 4 Waste Water generation Log il Hazardous waste Log iv. Non-Hazardous waste Log vv Fuel Consumption Log Verified by: SRPD ER Cpordindtor Saudi Aramco: Company General Use ‘Saudi Aramco: Company General Use- 7 REQUISITION | SHYDISECT Project Name: KING SALMAN ENERGY PARK No: 2022 4h €> | ZH —wrrastuctuneanowanvrenancesuuomg — LN: —_} 20 oee@ | axe Date: 05/04/2023 RES | Sates i : Environmental Monthly Reports Page of 19 4.Environmental Targets Monitoring for All Significant Aspects.Special Kingdom Projects Department ‘ivsion/Unit KING SLAMAN ENERY PARK, INFRASTRUCTURE & MAINTANENCE. AULOING reese Fee preton Expromcton Lene |tomnenrorons pining | mesa water 1 wee iru, duce tne | econ | vaalMente feof] eee drinking wore sown consumption eg. taps aap ncn emp ups laser, amet native mate dst wet, iret und prevent lemissions from _ |{*2inngs and sprinkling, method for er reve [Seca ats feces fn sabes that ost ine ds, - — a dual threat foontrol dust 2s per eservat ashesive or fumes and mists fotreerwonmereireere ara Ewa out | NN Neca hodeterine pend human health. /fugitive dust and \preerrwn [Horde ond |what particulates |cause Jwind barriers. Jare present in a tron ronment ‘Seusi Aramco: Company Goneral Use Saudi Aramco: Company General UseTeainngs and ‘comparrisafrom and dsp0sa Tocontere _|10m wort | Auarenes i use ening | recordkeeping & 2 | compton rena he pervs earamptont ssttcerewater | pewenasiy [uaterconmton | EEeMaus | SS | erntaion a5 per CEMP & a Tring an Tocontaithe awareness oft | Compa rm | Aecrdgthe iassteaion of 4] Fueiconsumeson | cansimptonst | toreducebySi [entevstonssch| —hepevaus” | tps-Josrney | C=SSe=0 fel sreventon fot] consmptons rangement an “ples 3 per enh ous Cont Pan twantathe agosto Trannes2nd | seceescrcine | a 5 | somware | cinewteton | toscnivoa | THe |iincnepercus | CB | nowt tne once ks by rope: mont | Tontorneot ‘washing off any. poss serene ste Sotothaaraouschentas| 2M romano avarnestnoe [,SotTestreand Jeoiemontore| is into sis esutngin mse sil who ae involved in) “2% O88 oes cats st contamination. coven a Depletion of ‘Trainings and | Soil Testing and | Close monitorig ? rates naturalrecoures [awareness reduce ja Obsenatons| ofthese | Val Montorng ‘hing mou ws moulding | “" anc ancfil | reuse and recycle he activities ‘Saudi Aramco: Company General Use Soudi Arama: Company General Use| Dopostalsewarwaterto | underground | 4. SYS | awareness, As per | measure to conrel [Close Monitoring] Meorsreshe ne. water Le Japproved SACEMP] — this activity * ound contaiatns consenatinat | redvootte | Trringand Moning Eneray consumption secre | Freercensumoton ese | consumptionat |awamessonpoer |, RSESY | onsumpton | evn consumption | ‘eneyeys% | consumstions let instalaione Tanned a awarenesson | Pollution of local Measure | saeasure Monitor . —_ Equipment Protection Act, 1 potion of local | environment ‘Monitor an ‘and control owe at workregs] Putn ole contol me Tneaeny retuetingtove | inductsatton |ejaiapte%on anal 90°80 | 5 atanagement sctcing | Rls tnd | cin | ont [OMRON 2G tees ang | IME lecsigatetunded| area sfeeiothe | Pelt tet Prepared bi NG OLA. Reviewed \ concord by conccured by DipmeFeonaa resonate San conpaghne Project Manager Representa ‘Saudi Aramco: Company Gonera Use Saudi Aramco: Company General Use< pee SG 2aKe REQUISITION Project Name: KING SALMAN ENERGY PARK No. ‘SHYDISEC/ 2022 INFRASTRUCTURE AND MAINTENANCE BUILDING Rev. No. 0 Environmental Monthly Reports Das: (0570472023 Page 8 of 19 5.Environmental Summary Report.Special Kingdom Projects Deparment KING SALMAN ENERGY PARK SPARK DRY PORTREQUISITION | SHYDISECT No. 2022 Rev. No. 00, ; Date: (05/0472023 Environmental Monthly Reports Paged of 19 Project Name: KING SALMAN ENERGY PARK INFRASTRUCTURE AND MAINTENANCE BUILDING 6. EC Weekly Inspection Report.‘Special Kingdom Projects Department KPO nw F006 Form Divsion/Unit: KING SALMAN ENERGY PARK ev. [ates 0771/2020 rags Lof No, DESCRIPTION a ‘Remarks [ro ERS TR EST TERT z [ae the trash bags removed on a ait basis 7 — [irr tor een aL TET [earning Weer paisUe wih Sosepe aA atop at ere tt TAT then mosig ate eased eT ee ET a Sth Tn nora pa tee aa ea 1S OT at wa fosters ots mgood conor? I Te a aaa pO i ea arn et er 11 [atmreson esi 4 5a conta oang cepa ies cones bg mone OTE WOT TTT 35th Sapper ub NUR TTT TT Bf worgecr one a ronan alana aaa TT 1 npc Neng Save Aramco: Company General Use Saudi Aramco: Company Geral Use ow ag 03/7073 ~REQUISITION SHYDISECT Project Name: KING SALMAN ENERGY PARK No. 2022 INFRASTRUCTURE AND MAINTENANCE BUILDING Rev. No 00, Date: (05/04/2023 Environmental Monthly Reports Page 10-of 19 7.Look Ahead Matrix Plan.as smse | sens ‘ACTIVITES ita tin Tia nae rl satay rara a ra wane cere || [Fie Tol nea sin sheet very [Gate Caeion smal [Exton raster Case [F/O Wa Satin Gay Coe Gener, Eugen epion| [ste Wess at Coanng SHestomeg [eur Eaten Perea npn ea) Fenris oOo [Peres Sage rapetoninenn [scares er Fees Wet Caro rape (Sz ‘Saul Arama: Compan)\General Use Special Kingdom Projects Department Divison/tnit Infrastructure & Maintenance Bldg 'SINOHYORO DAYS OF THE MONTH: MARCH 2127 [Se] [aR ss [w [tw lia AE Ee eae Z ‘Veriedy FRE Sipaner Sout romeo: Company General Use 'SKPD EnF007 Form foc] Owes o7napene Fame tert 3[s]uyr 5 [ae | | wh aeTpojetnanesnne sumanenenaream | SEOUBTIONT SHYDISET > | ZS —_wrrastauctuneano wanvrevancesuupnns — L-N8—_ 120 opem | cane . Date: 0570472028 a Environmental Monthly Reports Pap ohe 8.Temperature Monitoring Report.Project Name: KING SALMAN ENERGY PARK INFRASTRUCTURE AND MAINTENANCE BUILDING Environmental Monthly Reports REQUISITION No.: ‘SHYDISEC 2022 Rev. No, 00 Date: 05/0472023 Page 12 of 19 9. Monthly Generator Report.Special wson/ri WDEw Tero] ingdom Projects Department se Inratractre& Mainendree Ss, [cuit no. SVEC/ 007 sm Tans roxcieens aaa enna ao v 2 pretension v 2 etic mnie v «ise Ge v = fei v orator v 7 [ate ion eg v = fereae v >see pone v Feel nrc v 22 fina v 2dr v = [ome 5 [asarat Comar cee fagProject Name: KING SALMAN ENERGY PARK INFRASTRUCTURE AND MAINTENANCE BUILDING Environmental Monthly Reports REQUISITION No: SHYDISEC/ 2022 Rev. No. 00. Date: 05/04/2023 Page 13 of 19 10. Diesel Delivery Report.ceeRERRRR eH ERMA lE< nee T SG sER3 i Project Name: KING SALMAN ENERGY PARK INFRASTRUCTURE AND MAINTENANCE BUILDING Environmental Monthly Reports REQUISITION No. SHYDISEC 2022 Rev. No. 00 Date: 0570472023 Page 14 of 19 Weekly Toilet Inspection.SOO EN FORFa Special Kingdom Projects Department aaa icaeaics Divison: KING SALMAN ENERGY PARE = pate/ Time inspected: ) [gt 992- 2 - serio, SH oo J feectilsston: e.g Teme Daxeition ‘OK [Not ox | Wa emai 1 Watersupply 2 Soap 3 _ Wash basn/ Tops v fader 5 Bear Hand ail window v 7 [Poor / Knob v - 2 om! v 2 [Body Condition v 30. fewage Tonk/ Cover ¥ 11 _purtace v 32 [eshaustfan v 13 _[teaniness/ Application of Detal v 1a fhower sets v 15 other (Other Comments : Inspected by u NAGALINGAM vowstns Lye» ‘Adm Brata n> Charne Enviromental|S OBS2 | -axe Project Name: KING SALMAN ENERGY PARK INFRASTRUCTURE AND MAINTENANCE BUILDING Environmental Monthly Reports REQUISITION No. ‘SHYDISECI 2022 Rev. No, 00 Date 05/04/2023 Page 15 of 19 Waste Monitoring Log Sheet.‘Special Kingdom Projects Department a em HE EES eRe ER RRREQUISITION | SHYD/SECT No. 2022 Rev. No. 00 ous Ineo Mon Repo oa [sa Project Name: KING SALMAN ENERGY PARK INFRASTRUCTURE AND MAINTENANCE BUILDING Monthly Garbage Waste Disposal Monitoring.SPO Ene TODS Form evo [Ome 07/33/2020 Page tof Branch of sino Faro Corpaton a Ey ‘Special Kingdom Projects Department DDyisoUni: inastucure & Mantenece Sige, FOR THE MONTH OF MAR- 2023 Description Driver Name | PlateNo. | Manifest No. [Volume (ma)| Remarks Cambege Dispos Matacear ee ee ee ee Prepared by: Vera by: ace pase Necross See Saud Avance: Company General Ue ‘Seu ramen: Company Gere UseINFRASTRUCTURE AND MAINTENANCE BUILDING Rev. No: 00 Date: 0570472025, Page 17 of 19 Environmental Monthly Reports 14. Toilet Inventory.@ z ‘SKPD Env-F028 Form 3 Special Kingdom Projects Department Rao osescs ean opee | cone Division/Unit: Infrastructure & Maintenece Bids rowercune | Sates Page Loft SINOHYDRO 5-0080-0013 6600050462 MONTH: MAR - 2023 ‘SN: Toilet Facilities LOCATION REMARKS 1 3 Cubicles Tor 2 19 Portable Toilets - Chemical Type Sites 3 19 Water Tanks Sites 4 5 6 7 8 9 10 Saudi Aramco: Company General UsSaudi Aramco: Company General UseREQUISITION | SHYDISECI Project Name: KING SALMAN ENERGY PARK No 22 INFRASTRUCTURE AND MAINTENANCE BUILDING Rev. No. 00 Date: 05/0472023 Page 18 of 19 Environmental Monthly Reports Drinking Water Delivery log Sheet.@ |e Special Kingdom Projects Department 2 opes | seas Dhsor/Un rasta inane StsREQUISITION | SHYDISECI No. 2022 Rev. No, 00 oman | Date: 0510472025 rs Environmental Monthly Reports Page 10 oF 19 Project Name: KING SALMAN ENERGY PARK INFRASTRUCTURE AND MAINTENANCE BUILDING 16. Chemical Inventory.ZS 30 Em Ooo @e\|s Special Kingdom Projet Department lee a ogee | sexe Owes nt ore SS vad | spec Dateot vo] cmmiainane | cae Jitu] tscion [emt] Se Tay, Jonnie, Om ae oo ee patos | ef a = 15 | PRMER ORANGE 785EZWELO [Yes Yves | Ware house 2 Avaliable Ts Aug-24 sees i ‘Saxe Arama: Compary Genel Use ‘Saudi Aramco: Company General Useis 'SKPD internal Warehouse & Laydown Environmental Checklist -35 Question Checklist Seca ne Reha Nan CaS Teron romero [erioentoT ONS Rete onstetrepaanF . E Divieprand consaribe alae heNawd nea canes < 7 kets Oot ess raid Tr ak cramer z Fat ccrnent consiled erham dos TST = [ptesriones abeledconeciv? 13 Wertetanod i afin So TORSO 1 [ipo OWChericas pape SorSTaSST estewats pier Chena ware endows WAIST Troceaustevaratin oviaogP [Ts enero net nd swe cy SETS [1 [Rnmstisicnih sen cry mated eopsed HT ATT TTA t 29 Wolo eA iol atengmeleloctas clad Gwar TenTISR Soconbana NES AGT 2 a noaaeToHeT igh ca Seve wn oa WH Ta SSN STE HTT TT [Ez [emnsos sage avon eeres ool ocaed areal IS RON] anay Rik I naval Sodge Sea ERT 3 Aopapite aria wgripaiedal Rar nae ioa9e soe 25 [Dpenloer ol noc myasaled Yon bawnobe and conse PASE 3E Tet rs vided wihascie cover ard enplod bale OreatGF : [2x Sroueusepradine of he end otoach dy Sct a De waters cole Fie Yah a ron dipved ae Ga SOCIO st 3 Posie comoctorhor a3 Wasie Marogoren! Pen hatha een aamaved SATS 3 wave monn recorst avaiable, ctang Fe wa hal hasbeen renored Tom SOAS t Pes wile menenecorctavaiobie. eiaing Ta wae ta as boon osved FO Core z = [ao aol mason For rane pre oppored Fe! Was STSTEN FSS GWE = reduction woe sevogalen wais"uss Ondo [os [igtenaee Por kw ap nasoo ws eer SIRRTS TO Re AES ST SOS Ton SOSETSS 34 the ew Poo fo Board aha mach oder Gf arf Gnd fe Onna HaSeoarce WINE T (Be Trapentcchecion oT antoy welewale For prcbe bir ara oe eacT T Name: gato sora 2 tmycownrod cane ana Aba ace sor 3S Resetnotve sone Sereem Annes SonaSpecial Kingdom Projects Department Rare Relate el vironmental site inspection was conducted at SINOHYDRO Sites in the month of March 2023, and Jobserved the following items for improvement. All the findings were closed for rectification and implementation further 1 Concrete spill noticed in the site, 2 Oil spill from the equipment on the ground, 3-. Improper housekeeping in site Recommendation: 1. The dangers of spills on construction sites can have drastic consequences for people and the environment. 2. The dangers of spills on construction sites can have drastic consequences for people and the environment. . 3. The Scattred rebars on the site needs to segrgeated and stored in a designated area for recycling 1 2__ [The oil spill contaminated area was removed using the spill Kt 3 __ |The unused rebars cleared and kept in a designated area for recyling pur PHOTO No. BEFORE AFTER ‘Saudi Aramco: Company General Useacid Leone (ec) Rectified By: Vy linspection Conducted By: ‘Saudi Aramco: Company General Use'SKPO Internal Warehouse & Laydown Environmental Checklist - 35 Question Checklist ‘nb cn ar ad be TPO sana che RNS noone pet hee er ‘oop ue nd Wet ene tof ne. wn ‘Mocs Hon tome! ie he wa | 1 Die or anor ever ge? = cae ‘nee aa meee eee ee [a oardou stone tog copes oat (acetate SaecT (a Monaerared ne ui Too SET 2 Split x Ol ChericabSat team ear ainboT 17 enmosie pic iid n cet mate copped RECON aRTa Tea TT "aera redo ost AT [Open a wh reo! wo To Gan CoS RTOS SIS 2 eeetoeea “t BE Formate spe Sarin oh woohoo ea 15m OWT Gray For Ts TOOT Haape ROSE SS SOTO 2 [osoprate wang sgrepoied of formate Seage SES ca 25 “Open tore oolnocesagigatea Ton formate ood census 76 oon bi povaed secs coven aid spi belSe ong? Br wrouvooping dan leaned each Garr cc 3 Se aries cee ei ih rds ih posed oi fe orec GeanaTed aT (Does he conotorhove a Wie Managemarl Man thal hr been appsvaao SAPO reucton west gpagaten ware reise ore ornsycng) - = Fre rage hldig font ri etal good worng eu ORI OOS i he NS RTGS WTSI nt “ = cercaton wih CEC. inte prea a iplereniaton 1 eevonranat Coser ana taosngom SoratSpecial Kingdom Projects Department Er cam ci C ININgS: environmental site inspection was conducted at SINOHYDRO Sites in the month of March 2023, and lobserved the following items for improvement, All the findings were closed for rectification and implementation further 1- Combustible materials stored. 2- Improper housekeeping in site [3-.tmproper housekeeping insite Recommendation: I. The site shall be free from combustable materials and carry out housekeeping before and after the start of acivty. 2. The area shall be free from Slip, Trip, and Fall Hazards, Poor housekeeping results in untidiness, disorder, poor Istorage of items around the site. 8.The area shall be free from Slip, Tip, and Fall Hazards, Poor housekeeping results in untidiness, disorder, poor storage of items around the site. Contractor Corrective Action Taken 1__|Housekeeping carried outin the site to avoid any untoward incident. 2 [Proper housekeeping carried out in the site to avoid any type of hazard Proper housekeeping carried out in the site to avold any type of hazard. PHOTOS BEFORE ‘Saudi Aramco: Company General UseNo. BEFORE reies Inspection Conducted By: Netapt gna? fo! [Rectified By: We ‘Saudi Aramco: Company General Use wr'SKPD Internal Warehouse & Laydown Environmental Checklist -35 Question Cheeklist [eae tana Sm ie Cpe Tea onpted gn Eins ond cbr aT Toe nel SOT Machine Wart taunt 4 Dip parson tear re Goat [Ts avesmen com pated onan SESS [Tz contsren abated cores «SEIT OUGhemics Seip rear SIS (TE Seen wate sip Cheri avons WRC? TH Fonmasie iach forad Geary Moed capped eta SonaeT STS TR 1 [Lermebis fred ou of del Sagi Opan haan wis ees OR Pa Sova athe Peo ORS STS SST eeatwss) (EE Rormebi nape cea mecued on ested a eas BON] ovay Fan Te eG Reape SST She aS a Tr suiatoocng dove ol Te and sToact oyS SOT 2 owes COR fe isn ano Spas Sn eae OPTI SNOT SAE EHR SSIS INT ew et none Fence Sea a aor fe epic lon a Ine wot rogotion ora wane radon ann cocina wih CRC. cri he 12 msamentaion 3 oloysemrerentng Novestongen Annes SgroSpecial Kingdom Projects Department arated cola iar Health Contract Mew eet STesete<) Findings: environmental site inspection was conducted at SINOHYDRO Sites in the month of March 2023, and Observed the following items for improvement, Allthe findings were closed for rectification and implementation further 1- improper housekeeping in the site mixed with combustible wastes, [2 Overflow of general waste skips. 3-. Improper disposal of concrete wastes or leftovers, Recommendation: 1. Proper housekeeping is to be implemented on the site regularly to avoid any fire hazards. 2. the general waste skips needs to be cleared on timely basis to avoid contamination of sols 3. The left overs concrete waste to stored in a designated area for reuse puposes erode KeLek Kolm OX oLK LORIN Koaes CLL Ke 15S) 1_| The general waste were segregated and the waste were disposed to landfils. 2__ |The skips removed immdietely and sent landfills for disposal. ine concrete Teffovers are removed trom the sites and in TUUure a GRSIgNaLEd AEA SWaM BE BTIgHES TOF 3 |reusethe concrete leftovers. No. BEFORE AFTER Saudi Aramco: Company General UsePHOTO No. BEFORE AFTER yo hor Inspection Conducted By: \hrurenbveyryRectiiod By: We We ee ‘Saui Aramco: Company General Use'SKPD Internal Warehouse & Laydown Environmental Checklist - 35 Question Checklist Pree ig interne Fesscton toe Oy ‘et Gist Fa na ri APO art ad BENG na ant Roar epee oe 3 |Feonrounarocare Ger a aoa : Moen / Wk Fovpmens 4 Tipper ontoart even lbpet 2 Hove ae levesbeen nsf and adequate conGE PSST WETS STS STOTT — ay ee Sta Gi Chenicar al cers aearSIDST 1 aye wa od chovar as SEO < 19 oneness ruc doted eer) moved cophed Tela SSVGROT A NTT 7 anata rod oc aket Sangh [Open shar aS Bas PS Sono SST TOET TOSS zesowsd [Sper es oot vacrtagegoled ton lorie and Corban TAT n 1 Tahowetewping dor ow anda ach dori NT Does conroctarhaveo Vote Maragerart Pan hal ha been Sonora by SAPO aBpslo Mae anton Reger version a oor els Wale NOSGETEN TOATE SWOT deter wesiaepagaton wate ‘eun de> teeing {jas ling fon bo Fan good woting ora’ OSS SESH Ra RDS oT RSET WT HOSS SAO a TonnerSpecial Kingdom Projects Department = rela kecuit Peel arene ee] Teena Findings: environmental site inspection was conducted at SINOHYDRO Sites in the month of March 2023, and Jobserved the following items for improvement. All the findings were closed for rectification and implementation further 1. General waste skips mixed with combustable materials [2- Overflow of sewage water to the ground 3-. Improper housekeeping in site IRecommendation: 1. The general waste skips shall be segregated before being dumped into the skips. B. The overfow of sewage water I to be avoided to avoid land contamination ofthe soll B. The Scattred rebars onthe site needs to segrgeated and stored in a designated area for recycling eco aie Leh MLK LeL NASH CL COLA ML Co <=) The general waste were segregated and the waste were disposed to landfills [The contaminated soll ofthe sewage waste is removed on noticing with immediate effect to avoid soll mntamination IThe unused rebars cleared and kept in a designated area for Ldslexreys BEFORE Saudi Aramco: Company General Usene: BEFORE ‘AFTER it . ys inspection ooo Rectified By: ot x Saudi Aramco: Company General Use
You might also like
Environmental Management Plan
PDF
100% (3)
Environmental Management Plan
9 pages
MOS-MV Cable Installation, Testing, Splicing & Termination
PDF
No ratings yet
MOS-MV Cable Installation, Testing, Splicing & Termination
9 pages
Construction Site Safety Program REV-02
PDF
No ratings yet
Construction Site Safety Program REV-02
95 pages
Waste Management Plan
PDF
100% (1)
Waste Management Plan
40 pages
Environmental Awareness Training
PDF
No ratings yet
Environmental Awareness Training
15 pages
03.environmental Aspects and Impacts Register
PDF
No ratings yet
03.environmental Aspects and Impacts Register
2 pages
Ozoudeh Chukwuemeka
PDF
100% (3)
Ozoudeh Chukwuemeka
76 pages
Environmental Management Plan EMP - SAMPLE
PDF
50% (2)
Environmental Management Plan EMP - SAMPLE
48 pages
Imb SH Hse 0036
PDF
No ratings yet
Imb SH Hse 0036
69 pages
Imb SH Hse 0039
PDF
No ratings yet
Imb SH Hse 0039
65 pages
Environmental Management Plan (EMP)
PDF
No ratings yet
Environmental Management Plan (EMP)
51 pages
SH-Waste Management Plan Rev.03
PDF
No ratings yet
SH-Waste Management Plan Rev.03
50 pages
Imb SH Hse 0003 01
PDF
No ratings yet
Imb SH Hse 0003 01
45 pages
Env-F003 Environmental Performance Report
PDF
100% (2)
Env-F003 Environmental Performance Report
2 pages
Imb SH Hse 0004 01
PDF
No ratings yet
Imb SH Hse 0004 01
1 page
5-Monthly Environment Report
PDF
No ratings yet
5-Monthly Environment Report
2 pages
Construction Site Safety Program REV-03
PDF
No ratings yet
Construction Site Safety Program REV-03
97 pages
LLM - EH - STD - 1209 - 00.00 (00) - Environmental Management Plan
PDF
No ratings yet
LLM - EH - STD - 1209 - 00.00 (00) - Environmental Management Plan
35 pages
Env Plan
PDF
No ratings yet
Env Plan
117 pages
MMS COMPANY Environmental Management Program
PDF
No ratings yet
MMS COMPANY Environmental Management Program
50 pages
ENV Montlhy Report No.8
PDF
No ratings yet
ENV Montlhy Report No.8
31 pages
Action Plan and Close Out Report - For Environmental Compliance Q3 July 2020
PDF
No ratings yet
Action Plan and Close Out Report - For Environmental Compliance Q3 July 2020
9 pages
P-LUS-OCEMP-000: Overall Construction Environment Management Plan
PDF
100% (1)
P-LUS-OCEMP-000: Overall Construction Environment Management Plan
158 pages
SHE Manual
PDF
100% (1)
SHE Manual
146 pages
Construction Environmental Management Plan Scope of Work
PDF
No ratings yet
Construction Environmental Management Plan Scope of Work
12 pages
MMS Waste and Waste Water Management Plan
PDF
100% (1)
MMS Waste and Waste Water Management Plan
29 pages
Env-F002 Environmental Aspects Checklist
PDF
No ratings yet
Env-F002 Environmental Aspects Checklist
1 page
Environmental Log
PDF
No ratings yet
Environmental Log
18 pages
Monthly Report Template
PDF
No ratings yet
Monthly Report Template
10 pages
Environmental Management Plan - BU1 - Jan 19
PDF
No ratings yet
Environmental Management Plan - BU1 - Jan 19
19 pages
Env-F004 Environmental Targets Monitoring For All Significant Aspects
PDF
No ratings yet
Env-F004 Environmental Targets Monitoring For All Significant Aspects
3 pages
20220709111538
PDF
No ratings yet
20220709111538
2 pages
Ceshs - Ceec PV Asb 1 0830
PDF
No ratings yet
Ceshs - Ceec PV Asb 1 0830
233 pages
773 Final Emp Existing Engen Fuel Storage Depot Continued Operations in Keetmanshoop
PDF
No ratings yet
773 Final Emp Existing Engen Fuel Storage Depot Continued Operations in Keetmanshoop
29 pages
HBC WMP
PDF
No ratings yet
HBC WMP
7 pages
Annexure IV (A) EMP IJM India
PDF
No ratings yet
Annexure IV (A) EMP IJM India
36 pages
SAU1001-U001-___-&AQB-29013 Water Management Plan-rev-0
PDF
No ratings yet
SAU1001-U001-___-&AQB-29013 Water Management Plan-rev-0
21 pages
Environmental Management Interview Questions and Answers
PDF
No ratings yet
Environmental Management Interview Questions and Answers
13 pages
Appendix 5.3 - EAIR - Survey Works
PDF
No ratings yet
Appendix 5.3 - EAIR - Survey Works
3 pages
5.0 Environmental Management Plan: Proposed Domaine de Grand Baie Residential Development - EIA Report
PDF
No ratings yet
5.0 Environmental Management Plan: Proposed Domaine de Grand Baie Residential Development - EIA Report
9 pages
EMP Template
PDF
No ratings yet
EMP Template
5 pages
Environment Plan
PDF
100% (2)
Environment Plan
13 pages
Environmental Risk Assessment Form
PDF
No ratings yet
Environmental Risk Assessment Form
6 pages
Env-F001 Environmental Aspects and Impacts Register
PDF
No ratings yet
Env-F001 Environmental Aspects and Impacts Register
2 pages
SHE A1.5 Environment Management Plan - Use This
PDF
No ratings yet
SHE A1.5 Environment Management Plan - Use This
25 pages
KEO CV_Abbas Bin Hayat
PDF
No ratings yet
KEO CV_Abbas Bin Hayat
5 pages
TAMEAR Monthly Environmental Report of Feb 2023 for HE04
PDF
No ratings yet
TAMEAR Monthly Environmental Report of Feb 2023 for HE04
108 pages
C1 JK5 CBolegaon
PDF
No ratings yet
C1 JK5 CBolegaon
12 pages
IEE - DMA Package 2.9
PDF
No ratings yet
IEE - DMA Package 2.9
145 pages
Environmental Guidelines RHD
PDF
No ratings yet
Environmental Guidelines RHD
73 pages
Environmental Aspect Impact Catalog Assessment Matrix 2
PDF
No ratings yet
Environmental Aspect Impact Catalog Assessment Matrix 2
8 pages
Environmental Aspect Impact Catalog & Assessment Matrix
PDF
No ratings yet
Environmental Aspect Impact Catalog & Assessment Matrix
8 pages
Sampoong Environmental Responsibility
PDF
No ratings yet
Sampoong Environmental Responsibility
7 pages
Generic Environmental Performance Report and Management Plan
PDF
50% (2)
Generic Environmental Performance Report and Management Plan
9 pages
Imb SH Hse 0008 01
PDF
No ratings yet
Imb SH Hse 0008 01
1 page
self assessment
PDF
No ratings yet
self assessment
6 pages
Environmental Management Plan 2007/2008 E&M Construction
PDF
No ratings yet
Environmental Management Plan 2007/2008 E&M Construction
9 pages
Mitigation Measures
PDF
No ratings yet
Mitigation Measures
7 pages
Wajid CV- Enviromental Engineer-compressed
PDF
No ratings yet
Wajid CV- Enviromental Engineer-compressed
13 pages
Attendance Sheet 002
PDF
No ratings yet
Attendance Sheet 002
1 page
DOC-IMB-SH-MS-0004 - Method Statement For Fill Compaction Using RICDC
PDF
No ratings yet
DOC-IMB-SH-MS-0004 - Method Statement For Fill Compaction Using RICDC
31 pages
Shic A 0005
PDF
No ratings yet
Shic A 0005
2 pages
Shic A 0008
PDF
No ratings yet
Shic A 0008
3 pages
Appendix C1
PDF
No ratings yet
Appendix C1
1 page
RA 2.2 Energy Reduction Strategy PPCO WO 7
PDF
No ratings yet
RA 2.2 Energy Reduction Strategy PPCO WO 7
3 pages
Shitp A 0001 01
PDF
No ratings yet
Shitp A 0001 01
1 page
M. Risk Schedule: Confidential External
PDF
100% (1)
M. Risk Schedule: Confidential External
1 page
Imb SH Hse 0018 01
PDF
100% (1)
Imb SH Hse 0018 01
1 page
Risk Management Plan
PDF
No ratings yet
Risk Management Plan
29 pages
Imb SH MS 0015 01
PDF
No ratings yet
Imb SH MS 0015 01
1 page