Boq 2
Boq 2
00
TOTAL TO SUMMARY 867,042.00
QUANTI
ITEM DESCRIPTION UNIT TY U.PRICE AMOUNT
3. ROOFING & WATER PROOFING
Ega steel Equivalent Roof cover fixed on
A. SUB STRUCTURE
eucalyptus 7x5cm purlin and eucalyptus
1. EXCAVATION & EARTHWORKS
truss.price shall includes all truss member,purlin, 300 920 276,000.00
Clear off site to Removal of top soil to an m² 390 12.17 4,746.30 m²
roof ridge cover & overlap ends Roof cover
average
measure
depth of 20cm.with 50cm work ng space
horizontal projection.
2. CONCRETE WORKS
5cm thick lean concrete in C-7, 180kg 2.1
cement/m³ under foundtion
a) Under footing Pad
m² 128 61.64 7889.92
B. SUPERSTRUCTURE
1. CONCRETE WORKS
Reinforced concrete in C-25, 360kg cement/m³
filled
into formworks and vibrated around rod
reinforcement.
Steel and formworks measured separately.
3. ROOFING & WATER PROOFING c) 34cm x 3 cm thick Thread . m² 128 550 70400
Ega steel Equivalent Roof cover fixed on
m² 54000
eucalyptus 7x5cm purlin and eucalyptus d) 13 x 2 cm thick riser 120 450
truss.price shall includes all truss member,purlin, 300 920 276,000.00 53328
COMPARISON BETWEEN CONVENTIONAL AND NEW
Supply and fix 4 mm thick PVC ceilings as per
G-28 Galvanized flat iron sheet Gutter properly the engineers approval. Price shall include 40 x
fix to concrete gutter unit rate include all other 50 mm Zigba wood battens c/c spacing of 600 444 490 217,560.00
ml 54 260 14,040.00 m²
necessary fittings and accessories to com the mm both ways, middle and corner list, and
work.Dvt. Length=100cm other necessary accessories.
WINDOWS
WINDOWS
w1 No 32 1,800.00 57,600.00
w2 No 28 1,700.00 47,600.00
w3 No 28 1,750.00 49,000.00
w4 No 28 1,200.00 33,600.00
TOTAL TO SUMMARY 187,800.00
COMPARISON BETWEEN CONVENTIONAL AND NEW
TOTAL TO SUMMARY 62,500.00
7. FINISHING
Plastering
finshing work shall includes all surface cleaning
at the end of finshing
work.apply Two coats of plaster in cement
mortar to.
Flooring
Smooth Finsh cement sand screed With 1:3 mix
Ratio to Receive:-
6.5 75.8 240 18192
a) Ceramic floor tile (41mm thick)
m² 54000
d) 13 x 2 cm thick riser 120 450
m² 53328
e) 27 x 2cm thick threshold . 111.1 480
m² 49968
f) 27 x 2cm thick Copping 104.1 480
g) 32 x 3cm thick Window Sill . m² 13 550 7150
d) 13 x 2 cm thick riser m² 120 450 f) 27 x 2cm thick Copping 104.1 480
horizontal projection.
g) 53328
32 x 3cm thick Window Sill . m² 13 550 7150
COMPARISON BETWEEN
e) 27 x 2cm thick threshold .
Supply and fix 110mm 3.2 thickness down pipe
CONVENTIONAL
m²
m²
111.1 480
AND
49968
NEW
f) 27 x 2cm thick Copping m² 104.1 480 h) 60 x 20 x 3cm Marble Floor Tile for landing. m² 27 1,650.00 44550
PVC and secured to wall and column by metal
g)232 x 3cm thick Window Sill . ml m²
240 11013 26,400.00
550 7150
straps given coats of anti-uv water paint, TOTAL TO SUMMARY 778,848.00
strainer andh)mass
60 xx concrete
3cm at
20 xx 3cm base Floor
Marble support Tile for
for landing.
landing. m² 27 1,650.00 44550
h) 60 20 Marble Floor Tile m² 27 1,650.00 44550
8. PAINTING
TOTAL TO
TOTAL TO SUMMARY
SUMMARY 778,848.00
778,848.00
Quartez Pain to External Plastered Area & Price
8. PAINTING
8. PAINTING
Shall Include
Quartez Pain
Quartez Pain to
to External
External Plastered
Plastered Area
Area &
& Price
Price Horizontally Decorative Groove at Avery 45cm
Shall Include
Shall Include c/c , The Groove Siz
Horizontally Decorative Groove at Avery 45cm Not Greater Than 5 x 4cm.
Horizontally Decorative Groove at Avery 45cm
c/c , The Groove Siz 9.1 m² 1,064.00 160 170,240.00
c/c , The Groove Siz
Not Greater Than 5 x 4cm. TOTAL TO SUMMARY 170,240.00
9.1 Not Greater Than 5 x 4cm. m² 1,064.00 160 170,240.00
9.1 m² 1,064.00 160 170,240.00
TOTAL TO SUMMARY 170,240.00
TOTAL TO SUMMARY 170,240.00
9. GLAZING
9. GLAZING supply and fix quality 5mm thick tinted sheet
9. GLAZING
supply and fix quality 5mm thick tinted sheet glass glazed with
supply and fixwith
glass glazed quality 5mm thick tinted sheet
approved type rubber bed and all the
glass glazed
approved with
type rubber bed and all the necessary works.
approved type rubber bed and all the
necessary works. m² 264 550 145,200.00
m² 264 550 145,200.00
necessary works.
m² 264 TOTAL TO SUMMARY
550 145,200.00
145,200.00 145,200.00
TOTAL TO SUMMARY
TOTAL TO SUMMARY 145,200.00
ELECTRICAL WORKS ELECTRICAL WORKS
ELECTRICAL WORKS
Price shall include 6 Pcs of Tumbler Switch in a
similar separate 1 22,000.00 22,000.00
No
box. complete including 25% Reserve Space.
9. GLAZING
supply and fix quality 5mm thick tinted sheet
glass glazed with
approved type rubber bed and all the
necessary works.
m² 264 550 145,200.00
TOTAL TO SUMMARY 145,200.00
ELECTRICAL WORKS