0% found this document useful (0 votes)
34 views

QynetiQ Advanced - Installation Manual (Ver 1.2)

This document is the installation manual for the QynetiQ Advanced system. It provides instructions on installing the various components of the system including the wall mount bracket, front-end bracket, monitor, front-end unit, power unit and cabling. The manual includes a parts list, technical specifications, diagrams and step-by-step instructions for mounting and connecting all hardware. It also provides contact information for the manufacturer and instructions for recycling in accordance with WEEE regulations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views

QynetiQ Advanced - Installation Manual (Ver 1.2)

This document is the installation manual for the QynetiQ Advanced system. It provides instructions on installing the various components of the system including the wall mount bracket, front-end bracket, monitor, front-end unit, power unit and cabling. The manual includes a parts list, technical specifications, diagrams and step-by-step instructions for mounting and connecting all hardware. It also provides contact information for the manufacturer and instructions for recycling in accordance with WEEE regulations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 29

QynetiQ™ Advanced

Installation Manual
Version 1.2
2 QynetiQ™ Advanced Installation Manual (Ver. 1.2)
Copyright notice
Copyright © 2013 Fysicon Medical Technology B.V. and/or one of its subsidiaries.
All Rights Reserved.
Use of this documentation and related software is governed by a license agreement. This
documentation and related software contain confidential, proprietary and trade secret information
of Fysicon medical technology and are protected under Dutch and international copyright and other
intellectual property laws. Use, disclosure, reproduction, modification, distribution, or storage in a
retrieval system in any form or by any means is prohibited without the prior express written
permission of Fysicon medical technology. This documentation and related software are subject to
change without notice.

Publication date
November 2011

Product and version


QynetiQ™ Advanced Version 1.2

Corporate addresses

Fysicon BV
Hoogheuvelstraat 114
5349 BA Oss
The Netherlands
Tel: +31 412 653333
Fax: +31 412 653330
email: [email protected]

0044
Fysicon BV
Hoogheuvelstraat 114
5349 BA Oss
The Netherlands

QynetiQ™ Advanced Installation Manual (Ver. 1.2) 3


Reader comments
Any comments or suggestions regarding this publication are welcomed and should be forwarded to:
Fysicon BV
att. Quality Management
Hoogheuvelstraat 114
5349 BA Oss
The Netherlands

4 QynetiQ™ Advanced Installation Manual (Ver. 1.2)


Table of contents
Table of contents ............................................................................................................................ 5
1. Technical specifications ............................................................................................................... 8
1.1 QynetiQ™ Front-end ..................................................................................................................... 8

1.2 QynetiQ™ Power Unit ................................................................................................................... 8

2. Part list QynetiQ™ Advanced ....................................................................................................... 9


2.1 Main Parts QynetiQ™ Advanced ................................................................................................... 9

2.2 Modules ........................................................................................................................................ 9

2.3 Cable kits and Accessories ............................................................................................................ 9

2.4 QynetiQ™ Cable kits .................................................................................................................... 10

2.4.1 K1 - Control room to Generator room (25 meter) - OPTIONAL ........................................... 10

2.4.2 K2 - QynetiQ™ Front-End to Generator room (15 meter) ................................................... 10

2.4.3 K3 - In Room Monitor to Generator room (25 meter) ......................................................... 10

2.4.4 K4 - Hospital Mains to QynetiQ™ Power Unit (5 meter)...................................................... 10

3. Installing the QynetiQ™ Wall Mount Bracket ............................................................................ 11


3.1 Components ................................................................................................................................ 11

3.1.1 QynetiQ™ Wall Mount Bracket – Wall Mount (Box 1/2) ..................................................... 11

3.1.2 QynetiQ™ Wall Mount Bracket – Shelf (Box 2/2) ................................................................ 11

3.2 Required Tools ............................................................................................................................ 11

3.3 Mounting Instructions................................................................................................................. 11

3.3.1 Fixing the QynetiQ™ Wall Mount Bracket Back Plate to a wall ........................................... 11

3.3.2 Mounting the Shelf to the QynetiQ™ Wall Mount Bracket ................................................. 12

4. Installing the QynetiQ™ Front-End Bracket ................................................................................ 13


4.1 Components ................................................................................................................................ 13

4.2 Required Tools ............................................................................................................................ 13

4.3 Mounting Instructions................................................................................................................. 13

4.3.1 Preparation of the Mounting Strip ...................................................................................... 13

4.3.2 Mounting of the Mounting Strip to the QynetiQ™ Front-End Bracket ................................ 13

4.3.3 Mounting of the QynetiQ™ Front-End Bracket to the X-Ray table ...................................... 13

QynetiQ™ Advanced Installation Manual (Ver. 1.2) 5


4.3.4 Mounting of the QynetiQ™ Front-End to the QynetiQ™ Front-End bracket ....................... 14

5. Installing the Monitor in the Monitor Suspension of the X-Ray System ..................................... 15
5.1 Components ................................................................................................................................ 15

5.2 Required Tools ............................................................................................................................ 15

5.3 Mounting Instructions................................................................................................................. 16

5.3.1 Placement of the Monitor.................................................................................................... 16

5.3.2 Connecting the Earth Reference cable ................................................................................ 16

5.3.3 Connecting the Mains cable................................................................................................. 16

5.3.4 Connecting the VGA cable and UTP VGA receiver ............................................................... 16

5.3.5 Connecting the RS232 signal cable and the UTP converter ................................................. 16

6. Connecting the QynetiQ™ Front end. ........................................................................................ 17


6.1 Components ................................................................................................................................ 17

6.2 Required Tools ............................................................................................................................ 17

6.3 Connection Instructions .............................................................................................................. 17

6.3.1 Connecting the VGA Cable for the Video distributor ........................................................... 17

6.3.2 Connecting the SSTP cables to the QynetiQ™ Front-End .................................................... 18

6.3.3 Connecting the QynetiQ™ Front-End to the QynetiQ™ Power Unit .................................... 18

7. Connecting the QynetiQ™ Power Unit ....................................................................................... 19


7.1 Placement of the QynetiQ™ Power Unit..................................................................................... 19

7.2 Components ................................................................................................................................ 19

7.3 Required Tools ............................................................................................................................ 19

7.4 Connection Instructions .............................................................................................................. 19

7.4.1 Connecting the QynetiQ™ Power Unit to the Hospital Mains ............................................. 19

7.4.2 Connecting the QynetiQ™ CPU and the Peripherals to the QynetiQ™ Power Unit............. 19

7.4.3 Connecting the Earth Reference cables to the QynetiQ™ Power Unit ................................ 20

7.4.4 Connecting the QynetiQ™ Front-end (20V) to the QynetiQ™ Power Unit .......................... 20

8. Patching the SSTP Cables ........................................................................................................... 21


8.1 Mounting of the UTP Patch brackets .......................................................................................... 21

6 QynetiQ™ Advanced Installation Manual (Ver. 1.2)


8.2 Connection Instructions .............................................................................................................. 22

9. QynetiQ™ Advanced Wiring Diagram ........................................................................................ 23


10. QynetiQ™ Connector Wiring Diagram...................................................................................... 24
10.1 QynetiQ™ IBP Connector .......................................................................................................... 25

10.2 RS232 to UTP Converter............................................................................................................ 25

11. Recycling information, WEEE ................................................................................................... 25


12. Authorized service .................................................................................................................. 27
13. Reader Comment Form ........................................................................................................... 28
14. Contact information ................................................................................................................ 29

QynetiQ™ Advanced Installation Manual (Ver. 1.2) 7


1. Technical specifications

1.1 QynetiQ™ Front-end


 Dimensions: 365 x 145 x 280 mm
 Weight: 5.7 Kg
 Power supply: 20 V
 Power consumption: < 45 VA
 Operating Temperature: 10 o – 40o C / 50 o - 104 o F
 Relative Humidity: < 85 % Non-condensing
 Safety Class: II, CF
 Safety requirements: MDD 93/42/EEC, EN 60601-1

1.2 QynetiQ™ Power Unit


 Dimensions: 365 x 145 x 280 mm
 Weight: 11.2 Kg
 Power supply: 240 V ± 10% 50/60 Hz
 Power consumption: < 1100 VA
 Safety Class: I
 Operating Temperature: 10 o – 40o C / 50 o - 104 o F
 Relative Humidity: < 85 % Non-condensing

8 QynetiQ™ Advanced Installation Manual (Ver. 1.2)


2. Part list QynetiQ™ Advanced

The QynetiQ™ Advanced system consists of the following parts:

2.1 Main Parts QynetiQ™ Advanced

 1 x 19” LCD Touch Screen Monitor


 1x QynetiQ™ Modular Front-End (20V) with isolated analogue outputs
 1x QynetiQ™ Power Unit incl. Isolation transformer max.1000VA
(will be installed in the Generator room)
 1x QynetiQ™ Wall mount Bracket
(will be installed in the Generator room)
 1x QynetiQ™ Wall mount Bracket Shelf for Power unit
(will be installed in the Generator room)
 1x Mounting Bracket or Floor Stand for modular Front end (Optional)

2.2 Modules

The QynetiQ™ Advanced system is a modular system; Modules shipped with the system may vary:

 ECG module (12 Leads) - Standard


 NIBP module - Standard
 SPO2 module - Standard
 IBP Module (2 Channels input, 2 isolated outputs) - Standard
 IBP Module (2 Channels input, no isolated outputs) - Optional
 Temp module - Optional
 Cardiac Output module - Optional
 Dummy module

2.3 Cable kits and Accessories

 1 x Cable Kit 1 (Front-End to Generator room)


 1 x Cable Kit 2 (Control room to Generator room) - Optional for future upgrades
 1 x Cable Kit 3 (In-Room Monitor to Generator room)

QynetiQ™ Advanced Installation Manual (Ver. 1.2) 9


2.4 QynetiQ™ Cable kits

2.4.1 K1 - Control room to Generator room (25 meter) - OPTIONAL


1. SSTP (Black) VGA Reporting system
2. SSTP (Black) VGA Live
3. SSTP (Black) USB extender 1.1 Keyboard and Mouse
4. SSTP (Black) Spare
5. Power 230V Monitor Reporting system
6. Ground Monitor Reporting system
7. Power 230V Live Monitor
8. Ground Live Monitor

2.4.2 K2 - QynetiQ™ Front-End to Generator room (15 meter)


1. SSTP (Yellow) VGA extension
2. SSTP (Yellow) VGA extension
3. SSTP (Yellow) RS232
4. SSTP (Yellow) Lan
5. Power 20V AC Front-end
6. Ground Front-end

2.4.3 K3 - In Room Monitor to Generator room (25 meter)


1. SSTP (Blue) VGA extension
2. SSTP (Blue) VGA extension
3. SSTP (Blue) RS232
4. SSTP (Blue) Spare
5. Power 230V In Room Monitor
6. Ground In Room monitor

2.4.4 K4 - Hospital Mains to QynetiQ™ Power Unit (5 meter)


1. Mains 230V QynetiQ™ Power Unit
2. Ground QynetiQ™ Power Unit

10 QynetiQ™ Advanced Installation Manual (Ver. 1.2)


3. Installing the QynetiQ™ Wall Mount Bracket

The QynetiQ™ Wall Mount Bracket and the (optional) QynetiQ™ Front-End Bracket need to be
installed first in order to start with the installing of the QynetiQ™ Enterprise system. The CPU rail is
already assembled before shipping.

Make sure there is enough room to fit the mounting plate to the wall and that all pre requirements
as described in the “site requirements” description are met. Due to the weight of this Wall Mount
Bracket it is advised to carry the work with 2 people.

CAUTION!
Make sure the existing construction (wall) can carry the weight up to ~54 kg and use appropriate
mounting hardware for different surfaces! A mounting kit for a concrete structure is included with
the QynetiQ™ Wall Mount.

3.1 Components
3.1.1 QynetiQ™ Wall Mount Bracket – Wall Mount (Box 1/2)
1x Polycarbonate Back Plate with rails
6x M8 x 80mm screw
6x M8 rivet
6x 10 mm Nylon Plug

3.1.2 QynetiQ™ Wall Mount Bracket – Shelf (Box 2/2)


1x Shelf
4x M6 screw
4x M6 rivet (black)
2x Patch strips
4x M4x12mm screw
3x UTP Keystone couplers

3.2 Required Tools

 Power Drill/Hammer with 8mm drill


 Philips Head screwdriver
 Open-Ended spanner 13 mm

3.3 Mounting Instructions


3.3.1 Fixing the QynetiQ™ Wall Mount Bracket Back Plate to a wall
Set the back plate into the required position. Make sure that the back plate is leveled.

QynetiQ™ Advanced Installation Manual (Ver. 1.2) 11


Alternative
Measure the location to the holes of the back plate and draw dots on the wall using the dimensions
as measured (see Figure 1.).

Fig. 1 Fig. 2

Draw dots on the wall with a marker and drill six (6) holes for M8 plug using the 8mm Power Drill
into the wall. Fixate the QynetiQ™ Wall Mount bracket back plate to the wall with the 8mm screws,
plugs and rivets provided.

3.3.2 Mounting the Shelf to the QynetiQ™ Wall Mount Bracket


After you mount the back plate to the wall you can start to mount the shelf for the QynetiQ™ power
unit to the rails. The shelf will be mounted to the last two (2) cage nuts (see Figure 2.) with the four
(4) 6mm bolts and rivets provided.

12 QynetiQ™ Advanced Installation Manual (Ver. 1.2)


4. Installing the QynetiQ™ Front-End Bracket

The QynetiQ™ Front-End Bracket has a unique design to fit with specific brand, and or type of x-ray
vendor. Make sure the QynetiQ™ Front-End bracket model fits the x-ray model as installed in the
room. If there is no possibility to attach a QynetiQ™ Front-End Bracket to a specific X-ray table than
the QynetiQ™ Floor Stand needs to be ordered.

4.1 Components

 QynetiQ™ Front-End Bracket


 QynetiQ™ Front-End Bracket Mounting Strip (Specific for X-Ray table)
 4 x M6 bolt
 4 x M6 rivet
 4 x M3 x 12 mm
 4 x Nylon bushes
 4 x M8 Allen
 4 x M8 nut

4.2 Required Tools

 Philips Head screwdriver


 Open-ended spanner 13 mm

4.3 Mounting Instructions


4.3.1 Preparation of the Mounting Strip
Insert the Nylon bushes in the designate holes of the metal Mounting Strip as shown in Figure 3
(mark 3).

WARNING!
The nylon bushes are essential for the electrical isolation between the QynetiQ™ Front-End and the
X-Ray system.

4.3.2 Mounting of the Mounting Strip to the QynetiQ™ Front-End Bracket


Attach the Front-End Bracket to the Mounting Strip with the M8 Allen bolts and M8 nuts.

4.3.3 Mounting of the QynetiQ™ Front-End Bracket to the X-Ray table


Attach the Front-End Bracket with the Mounting Strip to the X-Ray table (see Figure 3, mark 1) by
using the M8 Allen bolts. Make sure that the position of the Front-End itself is correct. The cable
cover of the QynetiQ™ Front-End Bracket is located on the side of control room. The cables for the
accessories (ECG, IBP, etc.) are generally routed in the opposite direction of the X-Ray table control.

QynetiQ™ Advanced Installation Manual (Ver. 1.2) 13


4.3.4 Mounting of the QynetiQ™ Front-End to the QynetiQ™ Front-End bracket
Remove the rubberized feet from the bottom side of the QynetiQ™ Front-End by removing the four
(4) screws inside the rubberized feet. Place the QynetiQ™ Front-End in a vertical position, with the
bottom side to the mounting plate (see Figure 3, mark 2) into the QynetiQ™ Front-End Bracket and
Secure the QynetiQ™ Front-End by using the M3x14 bolts which are included.

3
3
2 2
1

2 2

Fig.3

14 QynetiQ™ Advanced Installation Manual (Ver. 1.2)


5. Installing the Monitor in the Monitor Suspension of the X-Ray
System

The procedure described below is the most common way to perform the installation.

There is one (1) 19” Touch Screen LCD monitor to be mounted in the Monitor Suspension of the X-
Ray system in the (Cardiac) Catheterization Lab. This monitor is the “live” as well as the “control”
monitor and which will display the vital signs of the patient during the examination. Besides the
Mains connection (230V), the Video signal and the RS232 signal, the monitor needs also to be
connected to the central earth reference point of the system.

The central point is situated on the back side of the QynetiQ™ Power Unit, which is situated in the
Generator Room.

Fig. 4 Fig. 5

5.1 Components

 19” Touch Screen LCD Monitor (IIYAMA is provided as standard)


 1x VGA Receiver
 1x RS232 to UTP Cat.5 Converter
 Cable kit 3
 4x Nylon bolt M4x12
 1x M4x12 bolt

5.2 Required Tools

 Philips Head screwdriver

QynetiQ™ Advanced Installation Manual (Ver. 1.2) 15


5.3 Mounting Instructions
Unpack the LCD Touch Screen monitors and don’t fit the desktop stand. Remove the arm, so the
VESA mount is free.

5.3.1 Placement of the Monitor


Fit the monitor in the monitor suspension to the VESA mount and secure the monitor by using the
Nylon screws provided.

CAUTION!
The monitors used for the QynetiQ™ monitoring systems are all equipped with a VESA mount. Due
to electrical safety, nylon screws are required for the electrical isolation.

5.3.2 Connecting the Earth Reference cable


Connect cable K3-5 to the earth reference point of one of the monitors, as mentioned on figure 5,
mark 3.

5.3.3 Connecting the Mains cable


Connect cable K3-4 to the Mains input of one of the monitors, as mentioned on figure 4, mark 1.

5.3.4 Connecting the VGA cable and UTP VGA receiver


Connect cable K3-1 (SSTP Blue) to the UTP VGA receiver and connect the VGA cable, which is
supplied with the monitor to the receiver and to the monitor as mentioned on figure 4, mark 2.

5.3.5 Connecting the RS232 signal cable and the UTP converter
Connect cable K3-2 (SSTP Blue) to the RS-232 to UTP converter and connect the converter to the
RS232 port on the backside of the Touch screen LCD monitor.

16 QynetiQ™ Advanced Installation Manual (Ver. 1.2)


6. Connecting the QynetiQ™ Front end.

CAUTION!
Please make sure that all cables which are running from the X-Ray table to the QynetiQ™ Front-End
are run through the hose, which is provided.

If all cables are in place, the hose can be fitted in the cover of the Front-End Mounting Bracket and
secured with a tie-wrap. The tie-wrap can be fitted to the notch as mentioned on figure 6.

Fig.6

6.1 Components

 1x Mounting Bracket for QynetiQ™ Front-End


 1x QynetiQ™ Front-End
 1x Hose (Included in the box of the Mounting Bracket for the QynetiQ™ Front-End)
 1x Cable Kit 2
 1x M6x12 bolt (Included in the box of the Mounting Bracket for the QynetiQ™ Front-End)

6.2 Required Tools

 Philips Head screwdriver


 Open-Ended spanner 13 mm

6.3 Connection Instructions


6.3.1 Connecting the VGA Cable for the Video distributor
Connect the short VGA cable (30 cm) cable between Port eleven (11) and four (4). See figure 7. This
VGA cable is secured with a tie-wrap to the backside of the QynetiQ™ Front-End.

QynetiQ™ Advanced Installation Manual (Ver. 1.2) 17


1. Power button 2. Fuse

3. Power connector (20V) 4. Video in for VGA extender

5. UTP VGA extender out to USB hub 6. UTP VGA extender to Live monitor in the
(control room) Monitor Suspension of the X-Ray system

7. USB (for Firmware upgrades) 8. RS232 for Touch screen (Not used)

9. UTP LAN for Network connection to CPU 10. PS2 Connection (Not used)

11. Video out live data 12. Analog ECG out

13. Analog ECG out 14. ECG Trigger out

15. ECG Trigger out 16. Calibration switch touch screen

17. Reset switch (not used) 18. Earth point

Fig. 7

6.3.2 Connecting the SSTP cables to the QynetiQ™ Front-End


The references of the Ports mentioned below, refer to Figure 7 above.
Connect cable K2-4 (SSTP Yellow) to UTP Port 9 and cable K2-2 (SSTP Yellow) to Port 5. Cable K2-1
(SSTP Yellow) can be connected to Port 6 and cable K2-6 (SSTP Yellow) to Port 18.

6.3.3 Connecting the QynetiQ™ Front-End to the QynetiQ™ Power Unit


Connect cable K2-5 (20V from the QynetiQ™ Power Unit) to Port 3 and the Earth reference cable,
K2-6 to the Earth Reference Point, No. 18.

18 QynetiQ™ Advanced Installation Manual (Ver. 1.2)


7. Connecting the QynetiQ™ Power Unit

Fig. 8

7.1 Placement of the QynetiQ™ Power Unit


Place the QynetiQ™ Power Unit on the shelf (see Figure 8).

After placement of the QynetiQ™ Power Unit on the shelf of the QynetiQ™ Wall Mount Bracket, as
described in paragraph 3.3.2 it is necessary to make the applicable connections.

7.2 Components

 1x QynetiQ™ Power Unit


 1x Cable Kit 4 (Included in the box of the QynetiQ™ Power Unit)

7.3 Required Tools

 Philips Head screwdriver


 Open-Ended spanner 13 mm

7.4 Connection Instructions


The references of the Ports mentioned below, refer to Figure 9 on the next page.

7.4.1 Connecting the QynetiQ™ Power Unit to the Hospital Mains


Connect cable K4-1 to the Central Earth Reference point (3) and the cable labeled K4-2 from
the Hospital Mains to the Mains input (1) of the QynetiQ™ Power Unit.

7.4.2 Connecting the QynetiQ™ CPU and the Peripherals to the QynetiQ™ Power Unit
Connect the Power cables K3-4; K1-6; K1-8 and K5-1 to the mains outputs (2) of the QynetiQ™ Power
Unit.

QynetiQ™ Advanced Installation Manual (Ver. 1.2) 19


4

2
3
1 5

1. Hospital Mains input, 230V 2. Power outlet, 230V 5 x

3. Earth reference point 4. On/Off switch

5. Power outlet to Front-End, 20V

Fig.9

7.4.3 Connecting the Earth Reference cables to the QynetiQ™ Power Unit
Connect the Earth Reference cables K1-5; K1-7; K3-5; K2-6 and K5-2 to the Central Earth Reference
Point of the QynetiQ™ Power Unit (3).

7.4.4 Connecting the QynetiQ™ Front-end (20V) to the QynetiQ™ Power Unit
Connect the cable K2-5 to port five (5) of the power unit.

20 QynetiQ™ Advanced Installation Manual (Ver. 1.2)


8. Patching the SSTP Cables

The QynetiQ™ products are designed to be upgradeable / down gradable on site to any model of the
QynetiQ™ range.

To make this possible, we use a patch panel (bracket) on the QynetiQ™ Wall Mounting Bracket (see
Figure 6). Above the QynetiQ™ Power Unit there is a bracket where all the SSTP cables come
together. By using this patch bracket you are able to connect different SSTP cables to match the
correct wire diagram. All cables are marked with letters and numbers in the wiring diagrams (see
Figure 19).

Example: K1-5 stands for “Cable kit 1, Cable Number Five (5)”.

There is also a legend in the wiring diagram where you can find the cable number and the type of
cable. Please work always according the wiring diagram, to avoid problems due to patching the
wrong SSTP cables.

Fig.10 Fig. 11

8.1 Mounting of the UTP Patch brackets


Mount the two (2) UTP Patch brackets with the provided M4x12 bolts to the back plate according to
figure 5 and 6. The brackets are packed with the shelf of the QynetiQ™ Wall Mount Bracket.

The patch panel is displayed in figure 11. The three (3) UTP key stone couplers (figure 18) need to be
secured in either one of the holes in the patch brackets.

Connect both ends of the two cables in a keystone coupler that you want to connect as mentioned
in the wiring diagram.

QynetiQ™ Advanced Installation Manual (Ver. 1.2) 21


Keystone coupler

Fig.12

8.2 Connection Instructions

 Patch cable K2-1 (SSTP Yellow) to cable K3-1 (SSTP Blue).


 Patch cable K2-3 (SSTP Yellow) to cable K3-2 (SSTP Blue).

22 QynetiQ™ Advanced Installation Manual (Ver. 1.2)


9. QynetiQ™ Advanced Wiring Diagram

Monitor cathlab to Generator


room Cable Kit K3

- K3-1 (STP VGA extention)


- K3-2 (STP RS232)
- K3-3 (STP SPARE)
- K3-4 (Power 230V AC)
- K3-5 (Ground

Procedure room

Front-end to Generator room


Cable Kit K2
K3-2
- K2-1 (STP VGA extention)
- K2-2 (STP VGA extention)
- K2-3 (STP RS232)
- K2-4 (STP Lan)
- K2-5 (STP SPARE)
K3-4
- K2-6 (Power 20V AC)
- K2-7 (Ground)

K3-1

Pa K3-5
tc h

K3-3
-3
K2 -1
K2

Fro
n t-e
n d
K2-7

K2-6

Po
we Power Cable Kit 4
ru
nit - K4-1 (Ground)
- K4-2 (Power 230V AC)

K4
-2
K4
-1

Generator Room
Fig. 13

QynetiQ™ Advanced Installation Manual (Ver. 1.2) 23


QynetiQ Advanced wire scheme
(Double screen)
Control Room Control room to Generator room
Cable Kit K1 Monitor Cathlab
- K1-1 (STP VGA) Monitor cathlab to Generator
- K1-2 (STP VGA) room Cable Kit K3
- K1-3 (STP (USB 1.1 Extention)
(Keyboard / Mouse) - K3-1 (STP VGA extention)
- K1-4 (STP SPARE) - K3-2 (STP RS232)
- K1-5 (Ground) - K3-3 (STP SPARE)
- K1-6 (Power 230V AC) - K3-4 (Power 230V AC)
- K1-7 (Ground) - K3-5 (Ground
- K1-8 (Power 230V AC)

Front-end to Generator room


Cable Kit K2
K3-2
- K2-1 (STP VGA extention)
- K2-2 (STP VGA extention)
- K2-3 (STP RS232)
- K2-4 (STP Lan)
K1-4 - K2-5 (STP SPARE)
K3-4
- K2-6 (Power 20V AC)
- K2-7 (Ground)

K1-2 K3-1

Pa K3-5
tc h

-2 K3-3
K2 2-3
K -1
K2

Fro
n t-e
n d
K2-7

K2-6

K1-8

Po
we Power Cable Kit 4
ru
K1-5 nit - K4-1 (Ground)
- K4-2 (Power 230V AC)

K4
-2
K4
-1

Created by: Description:


JJN QynetiQ Advanced Wire scheme
Double Screen
Version:

Generator Room Final V1.0

Date:
18-5-2011

24 QynetiQ™ Advanced Installation Manual (Ver. 1.2)


10. QynetiQ™ Connector Wiring Diagram

10.1 QynetiQ™ IBP Connector

Pin Lay-out

① Excitation -
③ Signal -
⑤ Signal +
⑦ Excitation +

Fig. 14

10.2 RS232 to UTP Converter

Pin Lay-out
RJ 45 Jack DB 9 (M-F) Color

① ⑧ White
② ⑥ Orange
③ ④ Black
④ ③ Red
⑤ ② Green
⑥ ⑤ Yellow
⑦ ① Brown
⑧ ⑦ White
Fig. 15

QynetiQ™ Advanced Installation Manual (Ver. 1.2) 25


11. Recycling information, WEEE

The system should be recycled at the end of its useful life.

Recycling should be made in accordance with the national and local regulations. Contact the Fysicon
local representative for assistance.

The system should be cleaned and not contaminated before it is recycled.

The battery of the system (CPU Main board) should be disposed in accordance to local regulations
concerning dangerous materials after they are exploited. Batteries should be discharged before its
disposing.

All disposable accessories of the monitor should be utilized in accordance with local hospital
regulations.

The package of the system should be recycled in accordance with the local regulations.

26 QynetiQ™ Advanced Installation Manual (Ver. 1.2)


12. Authorized service

Manufacturer’s service:

Fysicon B.V.
Hoogheuvelstraat 114
5349 BA Oss
The Netherlands

Tel: + 31 412 65 33 32
Fax: + 31 412 65 33 30
www: www.fysicon.com
@: [email protected]

QynetiQ™ Advanced Installation Manual (Ver. 1.2) 27


13. Reader Comment Form

We value your suggestions for improving our documentation. Please use this form to evaluate this
QynetiQ™ Advanced Installation Manual.

Topic Poor Fair Good Excellent


Organization of information
Accuracy of information
Completeness of information
Clarity of descriptions
Quantity of illustrations
Quality of illustrations

How would you change this document to make it more helpful to you?

Other comments:

Thanks for your help in improving this documentation.

Your name
Company name
Street address
City, State, Postal code
Telephone number
May we contact you? (circle one)  Yes  No

Please Fax this form to;

Fysicon Quality Assurance Department - Fax: +31 412 653330

28 QynetiQ™ Advanced Installation Manual (Ver. 1.2)


14. Contact information

For more information, please contact:

Fysicon B.V.
Hoogheuvelstraat 114
5349 BA Oss
The Netherlands

Tel: +31 412 653333


Fax: +31 412 653330
www: www.fysicon.com
@: [email protected]

QynetiQ™ Advanced Installation Manual (Ver. 1.2) 29

You might also like