IHC S70 & S90: Hydro Hammer No. 42127, No. 42128 and Power Pack No. 42129
IHC S70 & S90: Hydro Hammer No. 42127, No. 42128 and Power Pack No. 42129
Hydro hammer no. 42127, no. 42128 and power pack no. 42129
Hydraulic hammer & power pack and Z piles). The legs are not suited for very wide
Standard equipment The IHC hammer is an accelerated hydraulic ham- sheet piles, as the impact plate is too small.
mer
• Sheet legs that it double sheet piles (Larssen 603-607, PU 16-32, AU 16-26, AZ 18-50) When sheet legs are mounted, the sheet piles
• Guides for Hitachi 125, Hitachi 180-4 GLS-K, Banut 650 and Banut 850 The ram block of the hammer can be accelerated must have suficient moment resistance to carry
• Guides from the 9-tons Junttan hammer are to be transferred if the IHC hammer is mounted on to a blow rate corresponding to twice the rate the hammer. Furthermore, it should be noted that
Hitachi 180-3 GLS or Junttan PM 26LC of free drop. The high blow rate is transmitted the legs are about 2 metres below the sheet pile
well through steel, but tends to damage concrete. top. This means that if the sheet pile top is to be
Therefore, the hammer is well suited for driving driven further down than 2 metres above ground
of steel piles, but not suited for driving of concrete level, a trench for the sheet legs must be excavat-
Optional equipment piles. ed on both sides of the sheet piles.
• Pile sleeve The hammer is well suited for inclined driving. Due If a sleeve is mounted, piles can be driven with
to the acceleration, it is possible to carry out driv- free-hanging hammer.
ing with maximum energy.
The hammers are driven by a power pack. How-
The IHC hammer can function both on the leader ever, some of our piling rigs have enough capacity
and as a free-hanging hammer of e.g. a crane. to supply the necessary power and therefore do
not need a power pack.
If the hammer is operated on the leader, driving
caps for tubular piles or sheet piles can be mount-
Aarslef ’s Piling division is one of Europe’s Our extensive leet ranges from mini piling rigs Contact ed under the hammer.
leading piling contractors, and we undertake to large specialised machines and covers fully Per Aarslef A/S
a wide variety of piling, drilling and foundation hydraulic piling and drilling rigs as well as Ground Engineering Sheet legs
projects in Denmark and abroad. We have cranes and vibrators. [email protected] If the hammer is free-hanging, sheet legs can be
ofices in Poland, Sweden, Germany and the UK. Tlf. +45 8744 2222 mounted under the hammer which makes it pos-
sible to redrive double sheet piles (both U piles
05.01.17-M31UK-rev.2
w.aarslef.com w.aarslef.com
IHC S90 IHC S70
DN610 DN610
The following rigs can operate the IHC hammers without power pack
• Hitachi 125 GLS-K, no 5
• All Banut 650 rigs
• All Banut 850 rigs
• Hitachi 180-3 GLS
• Hitachi 180-4 GLS
• Junttan PM 26LC
7880
7130
Piling rig/hammer dimensions
4132
2872
Piling rig Sketch A B C
598
Banut 650 2 990 500 80
598
See table
Banut 850 1 550 580 DN80 See table
Sketch 1 Sketch 2
230
A A
1116
60
150
C C 2458 DN938
All measurements are in mm