0% found this document useful (0 votes)
19 views

IET332 - Project Report

This document is a project report submitted by a student for a course on Computing in Industrial Engineering. It includes information such as the semester, course details, submission date, student name and ID, grading scheme, and important notes. The report covers an engineering project conducted over multiple deliverables. It describes what the overall project was about, the different software used, how the software can benefit future projects, and discusses results from previous deliverables while suggesting improvements. General guidelines for the report format are also provided.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views

IET332 - Project Report

This document is a project report submitted by a student for a course on Computing in Industrial Engineering. It includes information such as the semester, course details, submission date, student name and ID, grading scheme, and important notes. The report covers an engineering project conducted over multiple deliverables. It describes what the overall project was about, the different software used, how the software can benefit future projects, and discusses results from previous deliverables while suggesting improvements. General guidelines for the report format are also provided.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Project Report

Semester : Fall Year : 2023


Course Title : Computing in Industrial Engineering
Course Code : IET 332
Instructor(s) : Imad Amine
(Includes names of all instructors teaching
this course)

Submission Date : Monday December 8, 8:00 am!

To be completed by the student


Student Name :
Student ID : Department : DET
Major : IET Section :
Integrity Statement : “I affirm that I will complete my assessment on
my own. I will not receive any help or use any
unlawful resources.”
Signature :
Grading Scheme
Question Earned Max. Points Question Earned Max. Points
Points Points
1 15 6 10
2 15 7 10
3 15 8 10
4 15
5 10

Total Earned Points Total Available Points Instructor Name


100 Imad Amine

Important Notes:
- Any attempt at plagiarism or cheating will be reported. All ACM handbook academic misconduct rules will be applied.
- It is the responsibility of the student to submit this online assessment paper to the instructed online platform (Moodle,
Turnitin) if applicable.

Copyright © American College of the Middle East 2022.


1. Introduction
In This Deliverable, students will write a properly formatted engineering report showing
their work in all previous deliverables.

2. Objectives:
Present engineering projects in properly written to communicate results with fellow
professionals in the industry.

3. Grading Rubric:

Criteria % Level 1 Level 2 Level 3 Level 4


There is no clear
The introduction states
introduction or The introduction states The introduction is engaging,
1. Introduction the main topic but does
main topic and the main topic and states the main topic and
15% not adequately preview
the structure of previews the structure previews the structure of the
the structure of the
the paper is of the paper paper
paper
missing
2. Literature No evidence of Literature Review not Literature Review has Literature Review has
Review 15% structure or clear lacks supporting sufficient supporting thoughtful supporting detail
organization detail sentences detail sentences sentences
Numerous and
3. Methodology distracting
& Technical Many errors in sentence Methodology shows the The methodology is engaging
errors in
15% structure and word approach for and shows clear details for
Analysis sentence
usage manufacturing manufacturing
structure and
word usage
4. Conclusion There is no clear Engaging, & states the
Vaguely states the Clearly states the
15% purpose of the purpose of project and its
purpose of project purpose of project
Report approach and potential results
5. Organization/ Writer demonstrates logical
Structural Incomplete Paragraph development and subtle sequencing of ideas
Paragraph development
Development 10% and/or present but not through well-developed
not present
of the Idea unfocused perfected paragraphs; transitions are
used to enhance organization
Numerous errors Few errors in Almost no errors in
6. Mechanics in punctuation, punctuation, punctuation, No errors in punctuation,
10%
capitalization capitalization and capitalization and capitalization and spelling
and spelling spelling spelling
7. Usage / Word Numerous errors
Few errors in sentence Almost no errors in
in sentence No errors sentence structure
Choice 10% structure and word sentence structure and
structure and and word usage
usage word usage
word usage
8. Citation / Few cited works are Some cited works are
No cited works
done in the correct done in the correct All cited works are done in the
References 10% are done in the
format. Inconsistencies format. Inconsistencies correct format with no errors
correct format
evident evident

2
Copyright © American College of the Middle East 2023.
4. Deliverable 4:
In this deliverable, you need to write a properly formatted engineering report (Maximum
of 5,000 words) (10 to 15 pages) that states the following:

 Describe what the whole project was about.


 Discuss the different software used in this project
 Show how each software can benefit you in future projects.
 Discuss the results achieved in the previous deliverables and suggest
improvements where applicable.

General Guideline for Fonts: Font must be Times New Roman, Size 12, and Spacing 1.5.

ChatGPT or any other AI tool IS NOT ALLOWED

3
Copyright © American College of the Middle East 2023.
Report

1. Introduction:
Our team has conducted extensive research on a broad variety of engineering-related topics
during the course of this project. Each of these fields is highly crucial in the industry that they
are affiliated with, and our team has conducted this study extensively. The most important goal
of this effort was to significantly increase our knowledge of a wide range of approaches and
procedures that are relevant to situations that occur in the real world. This particular endeavour
was successful in accomplishing this goal. To this point, this has been the most important
objective that we have set for ourselves. Over the course of the project, there are three primary
deliverables, each of which contributes to a more comprehensive understanding of engineering
procedures. Each and every one of these deliverables is automatically included into the project.
Without any exception, each and every one of these deliverables is included within the scope of
the project. During the course of our investigation, our group investigated a wide range of
subjects, such as the processes that are connected to the process of making decisions, the
administration of databases via the utilisation of Microsoft Access, and simulation modelling
through the utilisation of Arena. The inclusion of so many interconnected components in the
design is a manifestation of the diverse nature of the engineering issues that are met in the world
that we live in today. This is a reflection of the fact that the design incorporates all of these
components.

2. Project Deliverable 01:


The way in which we were able to successfully navigate the difficult terrain of decision-making
within the framework of industrial organisations was shown over the course of the first delivery.
In terms of the operations, the primary emphasis was placed on minimising the amount of waste
and losses that occurred to the greatest extent feasible, while also keeping in mind the
responsibility of protecting the environment. We place a large amount of stress on the crucial
importance of climate change, as well as the need for companies to modify their operations in
order to accommodate the ever-changing dynamics of the market. During the time when both of
these topics were being discussed, it was in the same phrase that they were being discussed.
There were also other topics that were brought up for discussion, such as the idea of a "smart
factory" and the increasing dependence on simulation, which is made possible by software that is

4
Copyright © American College of the Middle East 2023.
technologically sophisticated. Both of these topics were brought up for discussion. The concept
of a "smart factory" is a method of thinking about the production process that has been around
for a considerable amount of time. The results of the research were intended to give answers in
order to provide solutions to important difficulties concerning ethical manufacturing and the role
that various majors play in comprehending the effect that manufacturing has on society to
provide solutions to these challenges. We did this in order to offer solutions to the questions. The
study was carried out with the purpose of providing findings throughout the whole of its
execution over the duration of its execution.
As a consequence of the experiment's findings, it was proved that simulation is a significant
method for inventory management that is both scientific and quantitative. This was shown by the
fact that the experiment was achieved with positive results. The results of the experiment led to
the formation of these conclusions, which were derived from the investigation. The Arena
simulation model made it possible to make decisions that were well-informed by providing
critical insights into optimal storage amounts, re-order points, and safety stock. This made it
possible to make decisions that were well-informed. Because of this, it was possible to arrive at
judgements that were founded on information that was both accurate and reliable. Based on the
findings of the research, simulations have the potential to be useful in determining areas that
want improvement, optimising processes, and enhancing overall operational efficiency. This is
because simulations may assist identify areas that need development. Specifically, this is due to
the fact that simulations have the capacity to provide assistance in these areas. Simulations,
specifically those simulations that incorporated Arena, were used in order to attain this objective,
which was one of the ways that it was done.

3. Project Deliverable 02:


In order to successfully accomplish the second deliverable, which consisted of the building of a
database that was modified to cater to the requirements of a car repair workshop, it was
necessary to make use of the Microsoft Access software. The completion of this was essential in
order to achieve the goals that were set for the project. It was anticipated that this particular
deliverable would be finished, making it the second one that was to be completed. For the
purpose of making the administration of the workshop more straightforward, tables are now
being developed for the manufacturer of the vehicle, the model of the vehicle, the categories, and
the clients. This is being done in order to promote more straightforward administration. This

5
Copyright © American College of the Middle East 2023.
action is being taken in order to make the administration more straightforward and easier to
understand. In an effort to streamline the procedure and make it more straightforward to
comprehend, this is being done now. In order to accomplish the objective of guaranteeing that
the data do not include any information that is incorrect, it was absolutely necessary to adhere to
a number of specified criteria in a severe way. For the purpose of improving the overall quality
of the user experience, there were a number of activities that needed to be completed. The
development of tables, the entering of data, and the implementation of lookup functionality were
all activities that were included in this responsibility. Other tasks that needed to be accomplished
concurrently included the fabrication of tables, which was still another duty. The creation of
lookup menus was yet another of the duties that needed to be finished successfully. It was
possible to fit the installation of lookup capabilities within the scope of other projects that were
being completed at the time despite the fact that they were being completed.
The fact that the tasks were effectively finished demonstrates that the database design and
management features of Microsoft Access were used in an efficient manner. This was shown by
the fact that the functions were successfully accomplished. Through the use of these capabilities,
it was shown that this was the case. The adherence to properties and the building of lookup
menus are two examples that highlight the substantial effort that was put forth to ensure that the
data was correct and that it was simple to use. Both of these examples demonstrate the extensive
effort that was put forth. The entirety of the work that was put in is shown by both of these
outcomes. Each of these individual cases demonstrates how extensive the endeavour was in its
entirety. Since both of these occurrences were detailed in the sentence that came before this one,
it may be concluded that they are interchangeable with one another. The creation of a database
not only lays the groundwork for efficient record-keeping, but it also makes it simple to manage
information that is associated with the workshop in a way that is both discrete and uncomplicated
while maintaining confidentiality. The reason for this is because the database is placed in a single
location for organisation.

4. Project Deliverable 03:


With the completion of the third deliverable, which was accomplished via the use of Arena
software, a step was taken into the realm of simulation modelling. Another step was made, and
this was one of them. The procedures for the repair of cars that were carried out at a workshop in
Kuwait that specialised in the service of automobiles were the topic of the project, and the

6
Copyright © American College of the Middle East 2023.
objective of the project was to enhance such procedures. The workshop in question was located
in Kuwait. This particular workshop was situated in Kuwait, which was the nation that was under
consideration. It is important to note that the simulation takes into consideration not only the
probabilities and durations that are associated with each of these activities, but it also takes into
account the patterns of client arrival, operations such as painting and battery replacement, minor
service, major service, quality control, and rework. In addition to that, rework is taken into
account. Not only that, but the simulation also involved revisions in the several components that
were responsible for bringing the whole thing together. At several points over the course of the
research, an effort was made to locate any potential bottlenecks that could have been present.
Additionally, the study centred on the most crucial performance indicators that were being taken
into consideration at the time.
In addition to providing significant insights, the results of the simulation also revealed insights
on a variety of topics. These topics included the typical number of orders, the amount of time
that customers were required to wait, the quantity of resources that were utilised, and the
frequency with which it was necessary to make adjustments to procedures. It is clear that the
simulation has resulted in the development of perceptive understandings when everything is
taken into account. It is one of the most crucial signs that the system has been greatly simplified,
and the fact that there have been no bottlenecks detected is one of the most critical indicators. It
is really vital to show that you have a knowledge of the significance of this subject. The
production of improvements to the processes that are used for the repair of cars is one of the key
objectives of the company that operates the vehicle workshop. This objective, which is one of the
primary objectives of the vehicle workshop, benefits from the data that was gathered and helps to
the achievement of this goal.

5. Conclusion:

In the field of engineering, a comprehensive understanding of decision-making, database


administration, and simulation modelling has been built as a result of the collaborative efforts
that were put forth throughout the numerous deliverables of the project. A comprehension of this
kind has been developed as a consequence of the undertaking. This comprehension has been
attained as a result of the completion of the project, which has taken place after the project has
brought about the completion of the project. Collectively, the effective completion of

7
Copyright © American College of the Middle East 2023.
assignments, the use of Microsoft Access, and the insightful analysis performed using Arena
have contributed to the enhancement of our knowledge and practical abilities in the context of
addressing engineering difficulties that are encountered in the real world.

6. Future Directions:
It is feasible for us to pave the way for future endeavours in engineering by participating in the
process of reflecting on the outcomes of the project and the lessons that we have learned as a
consequence of the experience. This will allow us to prepare the way for future experiences in
engineering. There is the chance for further research to be undertaken on the integration of
decision models, database management, and simulation approaches across a wide range of
various industrial sectors. There is a diverse assortment of various kinds of enterprises that fall
under these categories. It is possible that the scope of simulations could be expanded to cover
more complex scenarios, that advanced optimisation techniques could be utilised, and that new
technologies that continue to have an impact on the landscape of engineering practises could be
investigated as potential areas of focus for future projects. All of these possibilities are possible.
It is conceivable for any one of these scenarios to occur. Additionally, in order to keep a position
of leadership in the area of engineering innovation, it will be necessary to make use of the most
current discoveries in software and methodology, as well as to maintain a continual connection
with industry experts. This will be necessary in order to keep the position of leadership. To
maintain the position of leadership, this will be required in order to ensure continued success.
The adoption of this action is going to be necessary in order to keep a position of leadership.

8
Copyright © American College of the Middle East 2023.