Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
39 views
IOD Dated 07 - 10 - 2016
IOD dated 07_10_2016
Uploaded by
Pranay Gandhi
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save IOD dated 07_10_2016 For Later
Download
Save
Save IOD dated 07_10_2016 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
39 views
IOD Dated 07 - 10 - 2016
IOD dated 07_10_2016
Uploaded by
Pranay Gandhi
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save IOD dated 07_10_2016 For Later
Carousel Previous
Carousel Next
Save
Save IOD dated 07_10_2016 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 3
Search
Fullscreen
INICIPAL TI No. CHE/WS/1094/K/337(NEW) e 9 oct T 20d! To "Ex. Engineer Bldg. Proposal (W.S.) Shri Atul Si Hand K- Wards ie ee Sse & Associates Municipal Office, R. K. ae 603, Mahalaxmi Tower, Opp. IDBI Bank Bandra (West), Muiibai - 400 Caesar Road, Amboli, Andheri (W) MUMBAI 400 058. Sub:- Proposed Redevelopment of building on Plot No.45 of T.P.S. VI, Vile Parle (W) bearing C.T.S, No.899/B of village Vile Parle at Bajaj Road, Vile Parle (W),Mumbai 400 056 Ref: Your letter dated 29.08.2016 Gentleman, There is no objection to your carrying out the work as per amended plans submitted by you vide your letter under reference for which competent authority has accorded sanction, subject to the following conditions ;- 1) All_ the objections of this office 1.0.D. under even no. dated 23.09.2014 shall be applicable and should be complied with. 2) The changes proposed shall be shown on the canvas mounted plans to be submitted at the time of B.C.C. 3) That every part of the building constructed and more particularly overhead water tank will be provided with proper access for the staff of Insecticide Officer with a provision of temporary but safe and stable ladder, 4) That the infrastructural works, such as; construction of hand holes / panholes, ducts for underground cables, concealed wiring inside the flats/rooms, rooms/space for telecom mstallations etc. required for providing telecom services shall be provided. 5) ‘That the regulation No.45 and 46 of D.C. Reg.1991 shall be complied with, 6] That the letter box shall be provided at the ground floor for all the tenements, 7) That the owner/developer shall not hand over the possession to the prospective buyers before obtaining occupation permission. 8) That no main beam in R.C,C, framed structure shall be less than 230 mm, wide. The size of the columns shall also be governed as per the applicable LS. Codes. 9) That all the cantilevers [projections] shall be designed for five times the load as per LS. code 1893-2002, This also includes the columns projecting beyond the terrace and carrying the overhead water storage tank, etc. 10) That the R.C.C, framed structures, the external walls shall not be less than 230 mm, if in brick masonary or 150 mm autoclaved cellular concrete block excluding plaster thickness as circulated under No.CE/5591 of 15.4.1974. 11) That the revised R.C.C. drawing/designs, calculations shall be submitted ‘through Licensed Structural Engineer. 12) ‘That the authorized Pvt .Pest Control Agency to give anti malaria treatment shall be appointed in consultation with P.C.O.[K/West Ward] 13) That the RUT shall be submitted by the developer to sell the tenements/flats on carpet area basis only and to abide by the provision of MOFA (Act) amended upto date and the 1.B. indemnifying the MCGM and its employees from any legal complications arising due to MORA, will be submitted 14) That the condition of revised bye-law 4[c] shall be complied with 15} That the N.O.C. from Civil Aviation shall be submitted.16) 17) 18) 19) 20) 21) 22) 23) 24) 25) 26) 27) 28} 29) a) b} 3 a e a by i) id ky (CHE/Ws/1094/K/337(NEW) ‘That the Janata Insurance Policy in the name of site under reference shall be submitted. That the NOC from A.A, & C., K/West Ward shall be submitted. ‘That the NOC from E.E. (T&C) shall be submitted. ‘That the Labour Welfare Tax of 1% of construction cost as per ready reckoner shall be paid. ‘That all the payments shall be made. ‘That the P.R. Card showing the F.P. No. shall be submitted. ‘That the Registered Undertaking shall be submitted as stated in the concession report, ‘That the quality control for building work / for structural work / supervision of the work shall be done and certificate to that effect shall be submitted periodically in proforma. ‘That the testing of building material to be used on the subject work shall be done and results of the same shall be submitted periodically. ‘That the C.C. shall be got re-endorsed. ‘That the Registered Undertaking stating that the conditions of E.E. (T & C) NOC shall be complied with and to that effect the mechanized parking equipped with safety measures will be maintained permanently in safe condition to avoid any mishap and an indemnity bond indemnifying MCGM and its officers against any litigation, costs, damages, etc. arising out of failure of mechanized system /nuisance due to mechanized system to any person shall be submitted. ‘That “All Dues Clearance Certificate” related to H.B.'s dept. from the concerned A.E.W.W,|K/West Ward] shall be submitted before applying for Ce. ‘That the work shall be carried out between sunrise and sunset only. That the RU.T. & Indemnity Bond shall be submitted stating that owner/developer and concerned Architect/Lic. Surveyor shall compile and preserve the following documents, Ownership documents. Copies of IOD, CC subsequent amendments, OCC, BCC and corresponding canvas mounted plans. Copies of Soil Investigation Report. RCC details and canvas mounted structural drawings. Structural Stability Certificate from Lic, Structural Engineer. Structural audit reports. All details of repairs carried out in the buildings. Supervision certificate issued by Lic. Site Supervisor. Building Completion Certificate issued by Lic. Surveyor / Architect. NOC and Completion Certificate issued by C.P.O. Bye safety audit carried out as per the requirement of C.F.O. © above documents shall be handed over to the end user/prospective society within a period of 30 days incase of redevelopment of properties and in other cases, within 90 days after granting occupation certificate by the developer, The end user/prospective society shall preserve and maintain the abovesaid documents/plans and subsequent periodical structural audit reports and repair history, Further, the end user/ prospective society shall carry out necessary repairs/structural audit/fire safety audit, etc. at regular intervals as per requirement of C.F.O. A copy of the sampleEx. Engineer Bldg. Proposal (W.S.) Enocr oi, Hood K- Wards CHE/WS/1094/K/357HHEM Me xc Ba...a (West), Mumbai - 400 050 agreement to. be executed with the prospective: buyers. incorporating: the above conditions shall not be submitted to this office. 30) That ail the structural members below the ground shall be designed considering the effect of chlorinated water, sulphur water, seepage water, ete. and any other possible chemical effect and due care while constructing the same shall be taken and completion certificate to that effect shall be submitted from the Licensed Structural Engineer before further C.C. 31) That the R.U.T. shall be submitted by the owner/developer for maintaining the noise levels as per the norms of Pollution Control Board. 32) That the verification of AMSL of completed work shall be done before F.C.C. The AMSL of the topmost part of the building under reference shall also be verified before 0.C.C. 33) That the R.U.T. for not misusing the additional parking proposed for full potential of F.S.1, and will count the same in FSI or will be handed over to M.C.G.M. free of cost, if the building is not constructed for full potential. 34) That the sanitary arrangement shall be carried out as per Municipal specifications and drainage layout approved by Ch.EngJS.P.) will be submitted before C.C. and completion certificate shall be also submitted from Ch.Eng. (S.P.). 35) That the revised N.O.C. from H.E, shall be submitted. 36) That the developer will intimate the prospective buyer and existing tenants regarding concessions availed for deficiency in open space, deficient parking Space, etc. as well as not objecting neighbourhood development. with deficient open spaces etc. and the clause shall be incorporated in sale agreement $0 as to make aware prospective buyer/ members about deficient open space/maneouvering spaces One set of plans in token of approval is enclosed herewith. Yours faithfully, —sa — Executive Engineer Building Proposals (Western Suburbs} ‘K’ Ward Copy to: U/ Mr. Hiten Seth & Others of M/s M.L. Construction C.A. to Nivant C.H.S. Ltd, 2) Assistant Commissioner,K/West Ward 3] A.E.W.W. K/West Ward 4) D.O. K/West Ward Forwarded for information please. feesrons) “Ward D mails 004034 AL. doe Office, R. K. Patkar Marg,
You might also like
Feasibility Report
PDF
100% (1)
Feasibility Report
1 page
WWW - Ghmc.gov - in Downloads CSC Applications TP001
PDF
100% (1)
WWW - Ghmc.gov - in Downloads CSC Applications TP001
9 pages
IOD Dated 12 - 03 - 2015
PDF
No ratings yet
IOD Dated 12 - 03 - 2015
3 pages
2 Building Plan Approval (IOD)
PDF
No ratings yet
2 Building Plan Approval (IOD)
4 pages
IOD AMENDED 07.08.2023
PDF
No ratings yet
IOD AMENDED 07.08.2023
2 pages
1 Building Plan Approval (IOD)
PDF
No ratings yet
1 Building Plan Approval (IOD)
9 pages
Common Affidavit Undertaking
PDF
100% (1)
Common Affidavit Undertaking
4 pages
common_affidavit
PDF
No ratings yet
common_affidavit
5 pages
33(7) Process
PDF
No ratings yet
33(7) Process
25 pages
BRIII BPTP Sec 84
PDF
No ratings yet
BRIII BPTP Sec 84
6 pages
AB Farms NMRDA
PDF
No ratings yet
AB Farms NMRDA
35 pages
CC Dated 09 - 08 - 2017
PDF
No ratings yet
CC Dated 09 - 08 - 2017
2 pages
journal
PDF
No ratings yet
journal
3 pages
Corporation Scrutiny Form
PDF
No ratings yet
Corporation Scrutiny Form
7 pages
Construction of High Rise Apartment
PDF
No ratings yet
Construction of High Rise Apartment
28 pages
2081665741-19-03-2021 08-23-26$ - $I To R Condition
PDF
No ratings yet
2081665741-19-03-2021 08-23-26$ - $I To R Condition
4 pages
HMDA Building Application Form Hyderabad India
PDF
No ratings yet
HMDA Building Application Form Hyderabad India
5 pages
Gunthewari Building Form
PDF
No ratings yet
Gunthewari Building Form
7 pages
BPO1_012411_GHMC_6062_LBN1_2022-BP
PDF
No ratings yet
BPO1_012411_GHMC_6062_LBN1_2022-BP
4 pages
Building Permission Undertakings - Greater Hyderabad Municipal ...
PDF
100% (1)
Building Permission Undertakings - Greater Hyderabad Municipal ...
15 pages
Rule 3 NBCP
PDF
100% (1)
Rule 3 NBCP
40 pages
Building Permission
PDF
100% (1)
Building Permission
5 pages
R8 Common Undertaking
PDF
No ratings yet
R8 Common Undertaking
4 pages
Building 1 Plan Approval
PDF
No ratings yet
Building 1 Plan Approval
5 pages
Agreement For Sale
PDF
No ratings yet
Agreement For Sale
8 pages
EODB -Manual of procedure for Building proposal approval 02.12.2015
PDF
No ratings yet
EODB -Manual of procedure for Building proposal approval 02.12.2015
21 pages
BPO1
PDF
No ratings yet
BPO1
2 pages
Maharashtra Industrial Development Corporation
PDF
No ratings yet
Maharashtra Industrial Development Corporation
9 pages
Building Plan Approval Application
PDF
No ratings yet
Building Plan Approval Application
7 pages
Residental Cum Commercial Shift
PDF
No ratings yet
Residental Cum Commercial Shift
5 pages
MS Balaji Dream Homes
PDF
No ratings yet
MS Balaji Dream Homes
3 pages
203618 for 04.11.2024 order
PDF
No ratings yet
203618 for 04.11.2024 order
9 pages
AB Farms Metro New
PDF
No ratings yet
AB Farms Metro New
17 pages
Proposal by Sumanth
PDF
No ratings yet
Proposal by Sumanth
12 pages
202408311926414
PDF
No ratings yet
202408311926414
4 pages
Sra Eng 1115 Ke ML Loi Bunch 22
PDF
No ratings yet
Sra Eng 1115 Ke ML Loi Bunch 22
417 pages
Area Statement: Site Plan (Scale - 1:100)
PDF
No ratings yet
Area Statement: Site Plan (Scale - 1:100)
1 page
Development Charges
PDF
No ratings yet
Development Charges
5 pages
Final CC upto 10th Floor
PDF
No ratings yet
Final CC upto 10th Floor
4 pages
BP - Application & Checklist
PDF
No ratings yet
BP - Application & Checklist
8 pages
BPO1_004368_GHMC_2123_LBN2_2024-BP
PDF
No ratings yet
BPO1_004368_GHMC_2123_LBN2_2024-BP
4 pages
Legend-CC
PDF
No ratings yet
Legend-CC
5 pages
Sachin Gaikwad of M-S Desing Crest, Society - Varsha-Swapna CHS LTD, Sub - LOI For Proposed S R Scheme Under Regulation 33 010 3
PDF
No ratings yet
Sachin Gaikwad of M-S Desing Crest, Society - Varsha-Swapna CHS LTD, Sub - LOI For Proposed S R Scheme Under Regulation 33 010 3
5 pages
Plan Proceedings PDF - Lic
PDF
No ratings yet
Plan Proceedings PDF - Lic
3 pages
building plan approval shah
PDF
No ratings yet
building plan approval shah
4 pages
List of Document To Be Furnished Along With Building Permission Appication Ownership Aspects (Mandatory) S. No. Document Name
PDF
No ratings yet
List of Document To Be Furnished Along With Building Permission Appication Ownership Aspects (Mandatory) S. No. Document Name
3 pages
Building Permit Order
PDF
No ratings yet
Building Permit Order
4 pages
Form_A
PDF
No ratings yet
Form_A
2 pages
3220 (4)
PDF
No ratings yet
3220 (4)
8 pages
Reference: North: Total No - of Sheets: 9 Sheet No. 4
PDF
No ratings yet
Reference: North: Total No - of Sheets: 9 Sheet No. 4
1 page
Redevelopment Rules
PDF
No ratings yet
Redevelopment Rules
6 pages
Udcpr (Mhada) Appendix
PDF
No ratings yet
Udcpr (Mhada) Appendix
5 pages
Permit-BA 1003 10397 2021
PDF
No ratings yet
Permit-BA 1003 10397 2021
3 pages
Checking Proforma For Compliance of Byelaws: For Industrial Buildings (Other Than Those On Individual Residential Plots)
PDF
No ratings yet
Checking Proforma For Compliance of Byelaws: For Industrial Buildings (Other Than Those On Individual Residential Plots)
18 pages
Ts-Bpass: Office of The Greater Hyderabad Municipal Corporation
PDF
No ratings yet
Ts-Bpass: Office of The Greater Hyderabad Municipal Corporation
4 pages
Form Giving Particulars of Development
PDF
No ratings yet
Form Giving Particulars of Development
6 pages
Offer Letter 3
PDF
No ratings yet
Offer Letter 3
8 pages
Building Plan 2nd Part
PDF
No ratings yet
Building Plan 2nd Part
12 pages
Remark ReportDP34202012111294905
PDF
No ratings yet
Remark ReportDP34202012111294905
2 pages
Compressed - Matheran ZMP 1
PDF
No ratings yet
Compressed - Matheran ZMP 1
15 pages
Title Certificate
PDF
100% (1)
Title Certificate
5 pages
Scan 2
PDF
No ratings yet
Scan 2
6 pages
APPROVAL OF High Rise Board
PDF
No ratings yet
APPROVAL OF High Rise Board
10 pages