Unpriced - BOQ For Borehole Drilling - Cassava Processing Factory

This document is a bill of quantities (BoQ) for borehole drilling works. It provides itemized costs for various work items including mobilization, site preparation, drilling 300 meters of borehole, supplying and installing casing and screen pipes, borehole testing, water quality testing, borehole disinfection, supplying and installing a submersible pump, and fencing the borehole area with chain link fencing. The total estimated cost for all the work is not provided.

Uploaded by

Adonis Alabi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
220 views1 page

Unpriced - BOQ For Borehole Drilling - Cassava Processing Factory

This document is a bill of quantities (BoQ) for borehole drilling works. It provides itemized costs for various work items including mobilization, site preparation, drilling 300 meters of borehole, supplying and installing casing and screen pipes, borehole testing, water quality testing, borehole disinfection, supplying and installing a submersible pump, and fencing the borehole area with chain link fencing. The total estimated cost for all the work is not provided.

Uploaded by

Adonis Alabi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

BoQ for Borehole drilling

S. No. Description of work Unit Quantity Unit cost NGN Total Cost (NGN)
1 General Items
Mobilization, Erection of equipment and demobilization after
1.1 completion of drilling Ls 1.00
Site preparation, setting up of the machine and clearing of site
1.2 after completion Site 1.00
2 Borehole drilling, development and construction
Drilling in sedimentary formation to appropriate formation in
appropriate diameter for installation of 5" uPVC 16 bar casings -
2.2 both blind and screen M 300.00
2.3 Supply and pack selected 6-9mm river gravel m3 10.00
2.4 Well Development by air lifting No 1.00
Well head construction and inject cement grout to protect
borehole surface from surface water up to 10m below the ground
2.5 level Ls 1.00
Allow for control of loss of circulation zone beyond 4hrs - if
2.6 applicable Hrs. 1.00
2.7 Backfilling and sealing abortive borehole - if applicable Ls 1.00
2.8 Supply and installation of casing
2.10 5" diameter uPVC 16 bar blind casings m 264.00
2.11 5" diameter uPVC 16 bar screen casing m 36.00
2.12 2" GI observation riser pipe; 1Pc=6m Pcs 50.00
2.13 Backfilling wall, annulus and casings Ls 1.00
3 Borehole testing
3.1 Constant rate test pumping (min. 24hours)* Hrs. 24
3.2 Step-drawdown test (5 hr. including recovery) Hrs. 5
4 Water sample analysis and completion report

4.1 Conduct borehole water sample physical and chemical analysis No 1.00
Borehole drilling detail report - including coordinates of the
location, lithological description, pumping test result, pump size
4.2 recommendation, etc.; with progress photographs in format of No 1.00
5 Borehole disinfection
5.1 Disinfection of borehole with 50mg/l chlorine solution Ls 1.00
6 Supply and installation of pump

Supply and install Grundfos submersible pump as per the drilling


and pump test report. It is estimated the pump is not less than
6.1 5.5Hp. The cost includes 3" GI riser pipe and all accessories No 1.00
7 Fencing the borehole with chain links
Earthwork in excavation in any kind of soil in foundation
7.1 commencing at strip level not exceeding 750mm deep. m3 0.20

Concrete casting for the 4"X4" angle iron posts foundation not less
than 250mm deep. The concrete should be C-21. The cost include
7.2 concrete mixing, blinding, vibrating, casting and curing. m3 0.20
Provision, welding and installing of 4"X4"X2" 2.5 meter angle iron
posts at 1 m c/c interval to be embedded in concrete foundation.
The fencing covers 9m2. Each post must be reinforced with
diagonal 4X4X2 angle iron. Holes should be made on the iron post
7.3 at 0.4m interval to tie mesh wire Pcs 12.00

Provision and installation of galvanized square mesh wire with 4cm


opening. The cost includes 8mm tie wire/strip wire. The fence
7.4 should cover the elevated tank, water source and solar modules. m2 30.00
7.5 Provision and fixing of double door 0.9 m width x 2.5 m height. m2 2.25
GRAND TOTAL -