Name of the Project: English: Light Manufacturing & Warehousing & Storage Facility
Name of the Project: Arabic: مرفق لتصنيع المنتجات الكيميائية الخفيفة وتخزينها
(Attach a copy of Saudi Energy Efficiency Center (SEEC) Certificate complying with
SEEC’s standards and requirements for new facilities including facilities to be
reconstructed, modified or expanded)
Aquachemie Saudi Industrial Co. Ltd received communication from the SEEC via e-
mail which states that the facility does not require a SEEC certificate. Please see
Attachment 2/PA-G1 for reference.
Applicant Address: 118, Building 2550, Support Industrial Area-1 , Jubail, KSA, PO-
35717
E-mail: [email protected]
E-mail: [email protected]
[X] New [ ] Existing In Case of renewal of EPO, attach the expiring EPO and its conditions.
2. OPERATIONAL ACTIVITIES:
a. Describe the proposed operations at the facility including the main chemical
reactions and process units involved
c. Provide mass / material balance calculations indicating inputs and outputs of process
units including air, water and waste releases.
e. Are there are any loading and unloading operations at the port
[ ] Yes [X] No
NA
IBC &
m)
Drum
Road & Sea
hydrotreated light Import IBC & KSA
Drum
Road & Sea
Acetic acid Import IBC & China
Drum
Road & Sea
Polyether amine Import IBC & China
Drum
Road & Sea
Polypropylene
Import IBC & China
glycol
Drum
Road & Sea
UAE/KSA/
Caustic soda lye Import IBC &
Oman
Drum
Road & Sea
Formic acid Import IBC & China
Drum
Road & Sea
Glycerol Import IBC & India
consumed consumed consumed
Drum
based on based on based on
Road & Sea
requirement requirement requirement
Ethylene glycol Import IBC & KSA
Drum
Road & Sea
Cinnamaldehyde Import IBC & China
Drum
Road & Sea
Sodium chloride Import KSA
Bag
Road & Sea Germany/
Potassium chloride Import
Bag China/Jordan
Methyl Road & Sea
Import KSA/China
diethanolamine ISO tank
Road & Sea Germany/
Perchloroethylene Import
ISO tank China
Road & Sea
Diethanolamine Import KSA/China
ISO tank
Road & Sea
Dimethyl disulfide Import France/China
ISO tank
Solvent naphtha 150 Import Road & Sea UAE/India
ISO tank
Road & Sea
Solvent naphtha 200 Import UAE/India
ISO tank
Road & Sea
Sodium Chlorite Import IBC & China/Spain
Drum
Sodium Road & Sea
Import China/KSA
Metabisulfide Bag
Road & Sea
Magnisium Oxide Import India
Bag
Road & Sea
Methanol Import IBC & KSA
Drum
Road & Sea
Calcium Carbonate Import KSA
Bag
Road & Sea
Propionaldehyde Import China
ISO tank
Road & Sea
Perchloro Ethylene Import Germany
ISO tank
Road & Sea
Calcium Stearate Import Singapore
ISO tank
Maximum
Delivery Hourly Annual
Storage Country of
Material Process and Storage Consumption Consumption
Capacity Origin
Method (Unit) (Unit)
(Unit)
Maximum
Delivery Hourly Annual
Storage City of
Material Process and Storage Consumption Consumption
Capacity Origin
Method (Unit) (Unit)
(Unit)
Storage/ Maximum
Hourly Annual End Users
Delivery to Storage
Process Product Production Production Name &
end users Capacity
(Unit) (Unit) Location
Method (Unit)
Maaden
Anticaking
Blending Phosphate,
agent
KSA
Maaden
Coloring
Blending Phosphate,
agent
KSA
Granulating Maaden
Blending aid Phosphate,
Defoamer KSA
Antifoamin
Maaden
g agent for
Blending Phosphate,
Phosphoric
KSA
acid
Curing aid Maaden
Blending for Rock Phosphate,
Phosphate KSA
Since it is Maaden
Flotation batch
Blending Phosphate,
agent process, it is Drums/ KSA
Urea difficult to IBCs/ISO Maaden
1,400 to
Blending anticaking mention the 60 KTA Tanks/Big Phosphate,
1,600 MT
agent hourly Bags/Small KSA
production Bags Maaden
Urea Melt rate of these
Blending Phosphate,
additive chemicals KSA
Dust Maaden
Blending suppression Phosphate,
agent KSA
Corrosion Aramco,
Blending
inhibitor SABIC
Cement Aramco (Up
Blending expanding Stream),
additive KSA
Aramco (Up
Drilling
Blending Stream),
Emulsifier
SLB, KSA
Shale
Blending SBL
inhibitor
Polyacrylam Aramco ((Up
Blending
ide friction Stream),
reducer KSA
Sodium
Blending Maaden
Bisulfite
Caustic
Blending Soda S-Chem
Dilution
DEA
Blending Satorp
Dilution
MSP 40%
Blending Satorp
Soln
Maximum End
Hourly Annual Storage/
Storage Users
Process Product Production Production Delivery to end
Capacity Name &
(Unit) (Unit) users Method
(Unit) Location
2.4 Process Technology Suppliers for Major Process Units e.g. Catalytic Cracking,
Catalytic Reforming, Polymerization, Thermal Cracking, etc.
Average
Type Units Annual Consumption
Consumption
Electricity kVA 597 771
Oil tones/day NA NA
Gas scm NA NA
Other (specify)
Average Maximum
Type of wastewater
Process wastewater (m3/day) 3.6 4.08
Sanitary wastewater (m3/day) 1.2 1.2
Other wastewater (Cooling 0.12 0.12
tower blow down) (m3/day)
3. SITE PLANS:
a. Buildings
Drawing No. Please refer to Attachment 9/PA-G1
d. All sanitary and industrial effluent discharge sources to the wastewater collection
system.
Drawing No. NA
i. All atmospheric emission point sources emitting greater than 10 tons/year of any
hazardous air pollutant (see RCER-2015, Volume I, Table 2C) and all point sources
emitting greater than 100 tons/year of any ambient air standards pollutant (see RCER-
2015, Volume I, Table 2A).
Drawing No. NA
4. LAND USE PLANNING (for new or modified facilities within the boundaries of an
existing site)
NA SQ. M.
The Project site is greenfield in nature. Therefore, there are no known possible
sources of contamination or previous storage of materials.
Drawing No. NA
The Project site is greenfield in nature. Therefore, there are no known possible
sources of contamination or previous storage of materials.
5. CONSTRUCTION ACTIVITIES
e. Describe the type, quantities, and disposal methods of industrial wastes during
construction of the facility.
Please see table above for types of wastes generated. Disposal shall be undertaken
by approved licensed third parties.
f. Provide the details of any temporary construction activities.
NA
Attachment 1/PA-G1
Attachment 2/PA-G1
Attachment 3/PA-G1
(Liquid blending of chemicals Process)
Process Control
Attachment 4/PA-G1
(Solid blending Process)
Attachment 5/PA-G1
(Chemical drumming Process)
Chemical drumming
The material is received in the facility through bulk (road tanker/ iso tanks).
The warehouse supervisor verifies documentation part and initiate for QC check with preparation of
GRN.
The QC chemist checks the material as per company’s standard operating procedures with
verification of COA and third-party report.
Post approval the material will be taken as stock IN and the iso tanks will be offloaded at the iso
tank storage area. In case of rejection, QC chemist inform logistics supervisor to proceed for the
return as per standard operating procedures.
With due diligence of EHS and safety measures and post plant manager clearance, drumming
process
initiated.
Storage tank will feed RM to the drumming line of various drum machines which will be then
ready for filling the drums. Typical drum filling system has been shown below:
Attachment 6/PA-G1
(Repacking Process)
Repacking of salts from big bags to small bags
Jumbo bags from warehouse are brough to the repackaging area via forklift and it is loaded in the
feeder.
Small bags will be placed on the load cell platform which will be ready to receive material.
Then the material is transferred to the small bags through series of conveyors (screw conveyor,
coarse screw conveyor and fine screw conveyor).
Once the small bag is loaded completely, the bag will be automatically moved to stitching stand via
belt conveyor and the bags will be loaded on to pallets and will be shrink wrapped & moved to the
warehouse and delivered to customer as per order.
The process area has dust extraction and collection system where there will be designated ducts at
the
top and at strategic locations which collects the dust coming out while solid handling process and
sent to venturi scrubber through blower as shown in the annexure.
The venturi scrubber outlet emission values to the atmosphere are in the not detectable range.
Attachment 7/PA-G1
(Mass / Material Balance Calculations Indicating
Inputs and Outputs of Process Units Including Air,
Water and Waste Releases)
Attachment 8/PA-G1
(Detailed Process Flow Diagrams (Pfds) With Stream
Summaries)
Attachment 9/PA-G1
(Plant Buildings)
Attachment 10/PA-G1
(Plant facility boundaries)
Attachment 11/PA-G1
(Specific Process Areas)
Attachment 12/PA-G1
(All non-contact cooling water discharge sources)
Attachment 13/PA-G1
(All Air Pollution Control Equipment Locations)
Attachment 14/PA-G1
(Areas Of Hazardous Waste Storage, Treatment or
Disposal)