Hira-Exide-Pipe Rack Member, Angle, Sagrod Lifting by Rope Pully

1. The document is a risk assessment from Interarch Building Products for lifting pipe rack members, angles, and sagrods weighing less than 80kg using rope pulleys. 2. It identifies hazards like incorrect rigging or signaling could lead to permanent disability, property damage, or fatality. 3. Existing control measures include exclusion zones, inspections, training, permits, tag lines, keeping people away from suspended loads, and competent supervision. With these measures, the risk is lowered from medium (3) to low (2).
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views1 page

Hira-Exide-Pipe Rack Member, Angle, Sagrod Lifting by Rope Pully

1. The document is a risk assessment from Interarch Building Products for lifting pipe rack members, angles, and sagrods weighing less than 80kg using rope pulleys. 2. It identifies hazards like incorrect rigging or signaling could lead to permanent disability, property damage, or fatality. 3. Existing control measures include exclusion zones, inspections, training, permits, tag lines, keeping people away from suspended loads, and competent supervision. With these measures, the risk is lowered from medium (3) to low (2).
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

INTERARCH BUILDING PRODUCTS LIMITED REV NO-00

M/S EXIDE ENERGY SOLUTIONS LTD


HIRA FOR PIPE RACK MEMBER/ANGLE/ SAGROD LIFTING Date - 04.01.2024

Sl. Risk Assessment - With out Risk Assessment - With


Activity Hazard Risk Existing Countol measures Action By
No control measures control measures Additional measures
Legal Statutory Compliance needed
1 Pipe Rack Member/Angle/ Incorrect of rigging Permanent Disability 1. Ensure exclusion Zone.
Sagrod Lifting by Rope Incorrect of signaling or Property damage 2. Inspected lifting appliances and gears(TPI)
Pully { Material Below operating lead to failure Fatality 3. Trained or competent person should be use for the task.
Weight-80 Kg ) 4. Ensure the lifting permit and height work permit should be signed and present on
the workplace
5. Ensure trail lift
6. Tag line to be used on both side
7. Ensure none is standing underneath of the boom.
8. Ensure none is standing below suspended load HSE and
4 3 12 M 9. Deploy trained riggers 2 1 3 L Execution
10. Maintain recommended hooking angle engg./Sup
11. Ensure recommended lifting method & wrapping
12. Competent lifting supervisor to be deployed
13. Prior to & During Works" hazard control checks must be made in accordance
with the Hazard Analysis to ensure that existing controls are full effective in
mitigating ALL risks.
14. Life line should be provide and ensure to hook locking
15. Ensure appropriate signages.
S - Severity P - Probability Risk level (RL) = S X P
S - Significant ( Risk > 2) NS - Non-Significant ( Risk =< 2) LC - Legal Concem NA - Not Applicable

This ratings for severity and probability in the during HIRA assessment shall be taken from the following table
Severity of Hazard (S) / Severity of Environmental impact Probability of Occurrence
Rating severity Injury / Consequence Rating Probability Occurrence
No injury, No Damage/ Near miss / Momentary Incident / accident observed at 1
1 1 Rare / Short-term
Insignificant Discomfort workplace or Negligible usage,
Minor Injury, Slight First Aid or Damage cost Incident / accident observed at 1
2 2 Unlikely / Medium-term
Damage/Minor impact (property) worth > 10000 / Does workplace or Low usage / Normal
Moderate / Medium degree Minor Accident OR Damage cost Incident / accident observed at 1
3 injury, Moderate to property/ (property) worth > Rs.50,000 & < 3 Likely / Long-term workplace may happen / Moderate
Moderate impact Rs. 75,000 / May require control usage / frequent Operation
Minor Accident OR Damage cost Incident / accident observed at 2
Serious, Major injury, Major
4 (property) worth > Rs.75,000 & < 4 Possible / Multiyear workplace may happen / high usage /
property damage/High impact
Rs. 1,00,000 / Control / Emergency Conditions
Major Accident OR Damage cost
(property) worth > Rs. 1,00,000 /
Permanent disabling injury, Sever ecological destruction, Incident / accident observed at 3
5 fatality, severe damage / loss of Severe Public health exposure / 5 Almost certain / Permanent workplace may happen / Very high
property/ significant fatalities due to industrial usage / Emergency Conditions
activity, Irreversible despite
control

Prepared by Name Review by Name : Approved by Name :