Structural Plans
2. Structural plans should be properly indexed and each drawing should bear
a drawing title and drawing number.
3. The first drawing of the set should contain general notes and material
specification on:
/7. …
-2-
Structural Calculations
/(iii) …
-3-
(c) essential information on the design to resist lateral loads, e.g. wind
load, where applicable, including –
/(e) …
-4-
12. If the structural submission involves the use of any new structural theories,
materials or structural forms, sophisticated designs or unconventional construction
methods, AP/RSE/registered geotechnical engineer (RGE) are advised to consult BD
through the pre-submission enquiry and conference mechanism specified in
PNAP ADM- 19 at an early stage of the design. If the pre-submission enquiry has not
been made prior to the formal submission of structural plans, the structural proposals and
principles involved will be considered in parallel. In such case, one additional set of plans
and relevant supporting documents is required to be submitted for the Technical Services
Unit of BD to examine the structural proposals and principles involved.
14. With the launch of the Electronic Submission Hub (ESH), AP/RSE/RGE
are encouraged to submit plans, forms and documents via the ESH in lieu of the
conventional paper submission or the submission of CD/DVD. Detailed requirements of
submission via the ESH are set out in PNAP ADM-17.
/15 …
-5-
15. Before the full adoption of ESH in structural plans submission, BD will
continue to accept submission of Part II structural calculations and other types of
structural documents listed in Appendix B in CD/DVD. In this connection, the CD/DVD
should be in the form of a non-rewriteable CD-ROM in ISO 9660 format (i.e. CD format)
or non-rewriteable DVD-ROM in ISO/IEC 13346:1995 format (i.e. DVD format) with
the project information, i.e. BD reference number, submission title, name of RSE/RGE
and disc number, printed on the cover. The RSE/RGE should sign on the cover of each
CD/DVD submitted and the electronic files contained in it should:
(b) have a clear index listing the content and purpose of each
document file in the CD/DVD;
(d) have resolution not less than 300 dpi for any image contained in
the document.
16. Once the CD/DVD is submitted, it is not replaceable and will not be
returned. Any supplementary design calculations and/or other information in Part II
structural calculations as well as supplementary structural documents should be presented
in the same format and submitted in a supplementary CD/DVD for BD’s retention.
( YU Po-mei, Clarice )
Building Authority
-1-
PART 3 - ADDITIONAL PLANS AND DESIGN DOCUMENTS FOR REFERRAL
Does the proposal involve or affect the Yes No
following?
Area Number 1, 2 or 4 of the Scheduled Geotechnical Engineering Office
Areas (1 set of plans and 1 set of documents)
Area Number 3 of the Scheduled Areas or (a) Mass Transit Railway Corporation Limited;
Railway Protection Areas and
(b) Railway Division, Highways Department
(2 sets of plans)
Area Number 5 of the Scheduled Areas (a) Geotechnical Engineering Office; and
(b) Drainage Services Department
(2 sets of plans and 1 set of documents)
Designated Area of Northshore Lantau Geotechnical Engineering Office
(1 set of plans and 1 set of documents)
Slopes, retaining structures, deep Geotechnical Engineering Office
excavation, disused tunnel (1 set of plans and 1 set of documents)
Culvert, nullah, stream course (a) Geotechnical Engineering Office;
(b) Drainage Services Department; and
(c) Highways Department
(3 sets of plans)
Proposed railway routes Railway Development Office, Highways
Department
(1 set of plans)
Chek Lap Kok Airport Civil Aviation Department
(1 set of plans)
Structures to be erected in, over, under or (a) Lands Department; and
upon a street (b) Highways Department
(2 sets of plans)
Highway structures Highways Department
(1 set of plans and 1 set of documents)
Sea walls, adjacent to sea front Port Works Division, Civil Engineering and
Development Department
(1 set of plans and 1 set of documents)
Reclamation, piers (a) Marine Department; and
(b) Port Works Division, Civil Engineering and
Development Department
(2 sets of plans and 2 sets of documents)
Public drainage Drainage Services Department
(1 set of plans)
Water mains Water Supplies Department
(1 set of plans)
Monument, proposed monument, graded Antiquities and Monuments Office
building, proposed graded building or site (1 set of plans)
having archaeological interest
Use of any new structural theories, materials Technical Services Unit, Buildings Department
or systems, sophisticated designs and (1 set of plans and 1 set of documents)
unconventional construction methods
A total of set(s) of additional plans and set(s) of documents for referral
Remark : This checklist is not meant to be exhaustive and more information may be required for individual structural
submission.
Date : Signature :
Full name of AP/RSE :
(Rev. 6/2023)
-2-
Appendix B
(PNAP ADM-8)
(Rev. 6/2023)