3.2 Đà kiềng tầng 1 nhà B.01 / 1st beam, building B.01 B.01.X3-B.01.X5/B01.Y1-B01.Y4 8/7/2023 MDG-B.01-ITP-C-BEAM-REBAR-002
3.3 Đà kiềng tầng 1 nhà B.01 / 1st beam, building B.01 B.01.X5-B.01.X9/B01.Y1-B01.Y4 8/12/2023 MDG-B.01-ITP-C-BEAM-REBAR-003
4 VAN KHUON/ FORMWORK
4.1 Đà kiềng tầng 1 nhà B.01 / 1st beam, building B.01 B.01.X1-B.01.X3/B01.Y1-B01.Y4 8/4/2023 MDG-B.01-ITP-C-BEAM-FORMW-001
4.2 Đà kiềng tầng 1 nhà B.01 / 1st beam, building B.01 B.01.X3-B.01.X5/B01.Y1-B01.Y4 8/8/2023 MDG-B.01-ITP-C-BEAM-FORMW-002
4.3 Đà kiềng tầng 1 nhà B.01 / 1st beam, building B.01 B.01.X5-B.01.X9/B01.Y1-B01.Y4 8/13/2023 MDG-B.01-ITP-C-BEAM-FORMW-003
5 BE TONG/ CONCRETE
5.1 Đà kiềng tầng 1 nhà B.01 / 1st beam, building B.01 B.01.X1-B.01.X3/B01.Y1-B01.Y4 8/4/2023 MDG-B.01-ITP-C-BEAM-CONC-001
5.2 Đà kiềng tầng 1 nhà B.01 / 1st beam, building B.01 B.01.X3-B.01.X5/B01.Y1-B01.Y4 8/8/2023 MDG-B.01-ITP-C-BEAM-CONC-002
5.3 Đà kiềng tầng 1 nhà B.01 / 1st beam, building B.01 B.01.X5-B.01.X9/B01.Y1-B01.Y4 8/13/2023 MDG-B.01-ITP-C-BEAM-CONC-003
LAP DAT MONG/ FOUNDATION
D
BACKFILLING
Móng F3, F4A, F5B, F5C / Foundation F3, F4A, F5B, (B.01X1-B.01-X2/B.01.Y1- MDG-B.01-ITP-C-FOUNDATION-
1 22/07/2023
F5C, B.01.Y4) BACKFIL-001
(B.01X3-B.01-X4/B.01.Y1- MDG-B.01-ITP-C-FOUNDATION-
2 Móng F5B, F4A, FLT1/ Foundation F5B, F4A, FLT1 24/07/2023
B.01.Y4) BACKFIL-002
(B.01X5-B.01-X6/B.01.Y1- MDG-B.01-ITP-C-FOUNDATION-
3 Móng F5B, F4A/ Foundation F5B, F4A 27/07/2023
B.01.Y4) BACKFIL-003
Móng F4A, F4B, F5A, F5B, F5D, F6, F7, F7B, FLT2/ (B.01X7-B.01-X9/B.01.Y1- MDG-B.01-ITP-C-FOUNDATION-
4 29/07/2023
Foundation F4A, F4B, F5A, F5B, F5D, F6, F7, F7B, FLT2 B.01.Y4) BACKFIL-004
E SAN LAP/ BACKFILLING
Thi công san lấp đầm chặt nền đất tầng 1/ Construction of (B.01X1-B.01-X3/B.01.Y1- MDG-B.01-ITP-C-GROUND 1ST
1 24/07/2023
leveling and compacting the ground 1st floor B.01.Y4) FLOOR-BACKFIL-001
Thi công san lấp đầm chặt nền đất tầng 1/ Construction of (B.01X3-B.01-X5/B.01.Y1- MDG-B.01-ITP-C-GROUND 1ST
2 27/07/2023
leveling and compacting the ground 1st floor B.01.Y4) FLOOR-BACKFIL-002
Thi công san lấp đầm chặt nền đất tầng 1/ Construction of (B.01X5-B.01-X7/B.01.Y1- MDG-B.01-ITP-C-GROUND 1ST
3 30/07/2023
leveling and compacting the ground 1st floor B.01.Y4) FLOOR-BACKFIL-003
Thi công san lấp đầm chặt nền đất tầng 1/ Construction of (B.01X7-B.01-X9/B.01.Y1- MDG-B.01-ITP-C-GROUND 1ST
4 04/08/2023
leveling and compacting the ground 1st floor B.01.Y4) FLOOR-BACKFIL-004
F COT/COLUMN
COT TANG 1/ 1ST FLOOR COLUMNS
1 COT THEP/ REBAR
Cột C1, C2 (600x800), C7 (350x600) / C1, C2 (600x800), MDG-B.01-ITP-C-COLUMN-REBAR-
1.1 B01.X1/-B.01.X2/B01.Y1-B01.Y4 8/12/2023
C7 (350x600) column 001
MDG-B.01-ITP-C-COLUMN-REBAR-
1.2 Cột C1, C2 (600x800) / C1, C2 (600x800) column B01.X3-B.01.X4/B01.Y1-B01.Y4 8/14/2023
002
Cột C1, C2 (600x800), C5 (350x600) / C1, C2 (600x800), MDG-B.01-ITP-C-COLUMN-REBAR-
1.3 B01.X4-B.01.X5/B01.Y1-B01.Y4 8/16/2023
C7 (300x500) column 003
ĐỐI TƯỢNG NGHIỆM THU NGÀY NGHIỆM
ITEM INSPECTION VỊ TRÍ NGHIỆM THU THU SỐ BIÊN BẢN ACW
STT
CÔNG VIỆC NGHIỆM THU LOCATION ACCEPTANCE OF REP NO.
INSPECTION OF WORK WORK DATE
MDG-B.01-ITP-C-COLUMN-REBAR-
1.4 Cột C1, C2 (600x800) / C1, C2 (600x800) column B01.X6-B.01.X7/B01.Y1-B01.Y4 8/30/2023
004'
2 VAN KHUON/ FORMWORK
Cột C1, C2 (600x800), C7 (350x600) / C1, C2 (600x800), MDG-B.01-ITP-C-COLUMN-FORMW-
2.1 B01.X1/-B.01.X2/B01.Y1-B01.Y4 8/13/2023
C7 (350x600) column 001
MDG-B.01-ITP-C-COLUMN-FORMW-
2.2 Cột C1, C2 (600x800) / C1, C2 (600x800) column B01.X3-B.01.X4/B01.Y1-B01.Y4 8/15/2023
002
Cột C1, C2 (600x800), C5 (350x600) / C1, C2 (600x800), MDG-B.01-ITP-C-COLUMN-FORMW-
2.3 B01.X4-B.01.X5/B01.Y1-B01.Y4 8/17/2023
C7 (300x500) column 003
MDG-B.01-ITP-C-COLUMN-FORMW-
2.4 Cột C1, C2 (600x800) / C1, C2 (600x800) column B01.X6-B.01.X7/B01.Y1-B01.Y4 8/31/2023
004'
3 BE TONG/ CONCRETE
Cột C1, C2 (600x800), C7 (350x600) / C1, C2 (600x800), MDG-B.01-ITP-C-COLUMN-CONC-
3.1 B01.X1/-B.01.X2/B01.Y1-B01.Y4 13/08/2023
C7 (350x600) column 001
MDG-B.01-ITP-C-COLUMN-CONC-
3.2 Cột C1, C2 (600x800) / C1, C2 (600x800) column B01.X3-B.01.X4/B01.Y1-B01.Y4 15/08/2023
002
Cột C1, C2 (600x800), C5 (350x600) / C1, C2 (600x800), MDG-B.01-ITP-C-COLUMN-CONC-
3.3 B01.X4-B.01.X5/B01.Y1-B01.Y4 17/08/2023
C7 (300x500) column 003
MDG-B.01-ITP-C-COLUMN-CONC-
3.4 Cột C1, C2 (600x800) / C1, C2 (600x800) column B01.X6-B.01.X7/B01.Y1-B01.Y4 31/08/2023
004'
Nghiệm thu công tác lắp đặt cốt thép bổ trụ, giằng tường
MDG-B.01-ITP-C-PIL WALLBRAC-
1.2 zone 2 - B.01/ Inspection of the installation of reinforcing B01.X5-B01.X9/B01.Y1-B01.Y4 25/11/2023
steel for pillars and wall bracing in zone 2 - B.01 REBAR-002
NHÀ B.02
III
B.02 BUILDING
A Công tác san lấp
(B.02.Y1-B.02.Y5/B.02.X5-
1 Công tác thi công san lấp lớp 1 3/29/2023 MDG-B02-ITP-C-BACK FILLING-001
B.02.X6)
Layer 1
(B.02.Y1-B.02.Y3/B.01.X9-
2 Công tác thi công san lấp lớp 1 và lớp 2 4/11/2023 MDG-B02-ITP-C-BACK FILLING-002
B.02.X6); Layer 2 (B.02.Y1-
B.02.Y3/B.02.X4-B.02.X6)
ĐỐI TƯỢNG NGHIỆM THU NGÀY NGHIỆM
ITEM INSPECTION VỊ TRÍ NGHIỆM THU THU SỐ BIÊN BẢN ACW
STT
CÔNG VIỆC NGHIỆM THU LOCATION ACCEPTANCE OF REP NO.
INSPECTION OF WORK WORK DATE
Layer 2
(B.02.Y1-B.02.Y3/B.01.X9-
3 Công tác thi công san lấp lớp 2 và lớp 3 4/18/2023 MDG-B02-ITP-C-BACK FILLING-003
B.02.X4’); Layer 3 (B.02.Y1-
B.02.Y4/B.02.X4’-B.02.X6)
B COC/PILE
Thi công ép cọc đại trà D600 nhà B.02
1 B02-71; B02-72 4/19/2023 MDG-MP-ITR-C-PILE-001
Construction of mass pile pressing D600 house B.02
B02-47; B02-46; B02-18; B02-
Thi công ép cọc đại trà D600 nhà B.02
2 17; B02-15; B02-16; B02-22; 4/20/2023 MDG-MP-ITR-C-PILE-002
Construction of mass pile pressing D600 house B.02
B02-21
B02-44; B02-43; B02-45; B02-
Thi công ép cọc đại trà D600 nhà B.02
3 70; B02-68; B02-69; B02-94; 4/21/2023 MDG-MP-ITR-C-PILE-003
Construction of mass pile pressing D600 house B.02
B02-93; B02-95; B02-110
Thi công ép cọc đại trà D600 nhà B.02
4 B02-1; B02-2 4/27/2023 MDG-MP-ITR-C-PILE-004
Construction of mass pile pressing D600 house B.02
Thi công ép cọc đại trà D600 nhà B.02 B02-73; B02-74; B02-98; B02-
5 4/28/2023 MDG-MP-ITR-C-PILE-005
Construction of mass pile pressing D600 house B.02 99; B02-49; B02-48.
Thi công ép cọc đại trà D600 nhà B.02
6 B02-24; B02-23 5/2/2023 MDG-MP-ITR-C-PILE-006
Construction of mass pile pressing D600 house B.02
B02-3; B02-4; B02-25; B02-27;
Thi công ép cọc đại trà D600 nhà B.02 B02-26; B02-50; B02-52; B02-
7 5/3/2023 MDG-MP-ITR-C-PILE-007
Construction of mass pile pressing D600 house B.02 51; B02-75; B02-76; B02-77;
B02-100; B02-101
C MONG/ FOUNDATION
1 DAO DAT/ EXCAVATION
MDG-B.02-ITP-C-FOUNDATION-
1.1 Móng F2, F1E, F1D/ Foundation F2, F1E, F1D B02.Y8/B02.X2-B02.X5 23/06/2023
EXCAVATION-001
Móng F2, F1A, F1C, F1D, F1E/ Foundation F2, F1A, F1C, B02.Y7/B02.X2-B02.X5; MDG-B.02-ITP-C-FOUNDATION-
1.2 25/06/2023
F1D, F1E B02.Y9/B02.X2-B02.X5 EXCAVATION-002
MDG-B.02-ITP-C-FOUNDATION-
1.3 Móng F2, F1B/ Foundation F2, F1B B02.Y6/B02.X2-B02.X5 26/06/2023
EXCAVATION-003
MDG-B.02-ITP-C-FOUNDATION-
1.4 Móng F2, F1B/ Foundation F2, F1B B02.Y5/B02.X2-B02.X5 29/06/2023
EXCAVATION-004
MDG-B.02-ITP-C-FOUNDATION-
1.5 Móng F2, F1B/ Foundation F2, F1B B02.Y4/B02.X2-B02.X5 30/06/2023
EXCAVATION-005
MDG-B.02-ITP-C-FOUNDATION-
1.6 Móng F2, F1B/ Foundation F2, F1B B02.Y3/B02.X2-B02.X5 02/07/2023
EXCAVATION-006
MDG-B.02-ITP-C-FOUNDATION-
1.7 Móng F2, F1B/ Foundation F2, F1B B02.Y2/B02.X2-B02.X5 06/07/2023
EXCAVATION-007
B02.X1/B02.Y1-B02.Y8; MDG-B.02-ITP-C-FOUNDATION-
1.8 Móng F2, F1B, F1F/ Foundation F2, F1B, F1F 12/07/2023
B02.X2/B02.Y1-B02.Y2 EXCAVATION-008
MDG-B.02-ITP-C-FOUNDATION-
1.9 Móng F2, F1B, F1F/ Foundation F2, F1B, F1F B02.Y1/B02.X3-B02.X5 13/08/2023
EXCAVATION-009
2 BE TONG LOT/ LEAN CONCRETE
MDG-B.02-ITP-C-FOUNDATION-
2.1 Móng F2, F1E, F1D/ Foundation F2, F1E, F1D B02.Y8/B02.X2-B02.X5 25/06/2023
LEAN CONC-001
Móng F2, F1A, F1C, F1D, F1E/ Foundation F2, F1A, F1C, B02.Y7/B02.X2-B02.X5; MDG-B.02-ITP-C-FOUNDATION-
2.2 27/06/2023
F1D, F1E B02.Y9/B02.X2-B02.X5 LEAN CONC-002
MDG-B.02-ITP-C-FOUNDATION-
2.3 Móng F2, F1B/ Foundation F2, F1B B02.Y6/B02.X2-B02.X5 28/06/2023
LEAN CONC-003
MDG-B.02-ITP-C-FOUNDATION-
2.4 Móng F2, F1B/ Foundation F2, F1B B02.Y5/B02.X2-B02.X5 30/06/2023
LEAN CONC-004
ĐỐI TƯỢNG NGHIỆM THU NGÀY NGHIỆM
ITEM INSPECTION VỊ TRÍ NGHIỆM THU THU SỐ BIÊN BẢN ACW
STT
CÔNG VIỆC NGHIỆM THU LOCATION ACCEPTANCE OF REP NO.
INSPECTION OF WORK WORK DATE
MDG-B.02-ITP-C-FOUNDATION-
2.5 Móng F2, F1B/ Foundation F2, F1B B02.Y4/B02.X2-B02.X5 01/07/2023
LEAN CONC-005
MDG-B.02-ITP-C-FOUNDATION-
2.6 Móng F2, F1B/ Foundation F2, F1B B02.Y3/B02.X2-B02.X5 03/07/2023
LEAN CONC-006
MDG-B.02-ITP-C-FOUNDATION-
2.7 Móng F2, F1B/ Foundation F2, F1B B02.Y2/B02.X2-B02.X5 07/07/2023
LEAN CONC-007
B02.X1/B02.Y1-B02.Y8; MDG-B.02-ITP-C-FOUNDATION-
2.8 Móng F2, F1B, F1F/ Foundation F2, F1B, F1F 13/07/2023
B02.X2/B02.Y1-B02.Y2 LEAN CONC-008
MDG-B.02-ITP-C-FOUNDATION-
2.9 Móng F2, F1B, F1F/ Foundation F2, F1B, F1F B02.Y1/B02.X3-B02.X5 14/08/2023
LEAN CONC-009
3 COT THEP/ REBAR
MDG-B.02-ITP-C-FOUNDATION-
3.1 Móng F2, F1E, F1D/ Foundation F2, F1E, F1D B02.Y8/B02.X2-B02.X5 25/06/2023
REBAR-001
Móng F2, F1A, F1C, F1D, F1E/ Foundation F2, F1A, F1C, B02.Y7/B02.X2-B02.X5; MDG-B.02-ITP-C-FOUNDATION-
3.2 27/06/2023
F1D, F1E B02.Y9/B02.X2-B02.X5 REBAR-002
MDG-B.02-ITP-C-FOUNDATION-
3.3 Móng F2, F1B/ Foundation F2, F1B B02.Y6/B02.X2-B02.X5 28/06/2023
REBAR-003
MDG-B.02-ITP-C-FOUNDATION-
3.4 Móng F2, F1B/ Foundation F2, F1B B02.Y5/B02.X2-B02.X5 01/07/2023
REBAR-004
MDG-B.02-ITP-C-FOUNDATION-
3.5 Móng F2, F1B/ Foundation F2, F1B B02.Y4/B02.X2-B02.X5 02/07/2023
REBAR-005
MDG-B.02-ITP-C-FOUNDATION-
3.6 Móng F2, F1B/ Foundation F2, F1B B02.Y3/B02.X2-B02.X5 04/07/2023
REBAR-006
MDG-B.02-ITP-C-FOUNDATION-
3.7 Móng F2, F1B/ Foundation F2, F1B B02.Y2/B02.X2-B02.X5 08/07/2023
REBAR-007
B02.X1/B02.Y1-B02.Y8; MDG-B.02-ITP-C-FOUNDATION-
3.8 Móng F2, F1B, F1F/ Foundation F2, F1B, F1F 14/07/2023
B02.X2/B02.Y1-B02.Y2 REBAR-008
MDG-B.02-ITP-C-FOUNDATION-
3.9 Móng F2, F1B, F1F/ Foundation F2, F1B, F1F B02.Y1/B02.X3-B02.X5 15/08/2023
REBAR-009
4 VAN KHUON/ FORMWORK
MDG-B.02-ITP-C-FOUNDATION-
4.1 Móng F2, F1E, F1D/ Foundation F2, F1E, F1D B02.Y8/B02.X2-B02.X5 25/06/2023
REBAR-001
Móng F2, F1A, F1C, F1D, F1E/ Foundation F2, F1A, F1C, B02.Y7/B02.X2-B02.X5; MDG-B.02-ITP-C-FOUNDATION-
4.2 27/06/2023
F1D, F1E B02.Y9/B02.X2-B02.X5 REBAR-002
MDG-B.02-ITP-C-FOUNDATION-
4.3 Móng F2, F1B/ Foundation F2, F1B B02.Y6/B02.X2-B02.X5 29/06/2023
REBAR-003
MDG-B.02-ITP-C-FOUNDATION-
4.4 Móng F2, F1B/ Foundation F2, F1B B02.Y5/B02.X2-B02.X5 02/07/2023
REBAR-004
MDG-B.02-ITP-C-FOUNDATION-
4.5 Móng F2, F1B/ Foundation F2, F1B B02.Y4/B02.X2-B02.X5 03/07/2023
REBAR-005
MDG-B.02-ITP-C-FOUNDATION-
4.6 Móng F2, F1B/ Foundation F2, F1B B02.Y3/B02.X2-B02.X5 05/07/2023
REBAR-006
MDG-B.02-ITP-C-FOUNDATION-
4.7 Móng F2, F1B/ Foundation F2, F1B B02.Y2/B02.X2-B02.X5 09/07/2023
REBAR-007
B02.X1/B02.Y1-B02.Y8; MDG-B.02-ITP-C-FOUNDATION-
4.8 Móng F2, F1B, F1F/ Foundation F2, F1B, F1F 15/07/2023
B02.X2/B02.Y1-B02.Y2 REBAR-008
MDG-B.02-ITP-C-FOUNDATION-
4.9 Móng F2, F1B, F1F/ Foundation F2, F1B, F1F B02.Y1/B02.X3-B02.X5 16/08/2023
REBAR-009
5 BE TONG/ CONCRETE
MDG-B.02-ITP-C-FOUNDATION-
5.1 Móng F2, F1E, F1D/ Foundation F2, F1E, F1D B02.Y8/B02.X2-B02.X5 25/06/2023
CONC-001
Móng F2, F1A, F1C, F1D, F1E/ Foundation F2, F1A, F1C, B02.Y7/B02.X2-B02.X5; MDG-B.02-ITP-C-FOUNDATION-
5.2 27/06/2023
F1D, F1E B02.Y9/B02.X2-B02.X5 CONC-002
MDG-B.02-ITP-C-FOUNDATION-
5.3 Móng F2, F1B/ Foundation F2, F1B B02.Y6/B02.X2-B02.X5 29/06/2023
CONC-003
MDG-B.02-ITP-C-FOUNDATION-
5.4 Móng F2, F1B/ Foundation F2, F1B B02.Y5/B02.X2-B02.X5 02/07/2023
CONC-004
MDG-B.02-ITP-C-FOUNDATION-
5.5 Móng F2, F1B/ Foundation F2, F1B B02.Y4/B02.X2-B02.X5 03/07/2023
CONC-005
MDG-B.02-ITP-C-FOUNDATION-
5.6 Móng F2, F1B/ Foundation F2, F1B B02.Y3/B02.X2-B02.X5 05/07/2023
CONC-006
MDG-B.02-ITP-C-FOUNDATION-
5.7 Móng F2, F1B/ Foundation F2, F1B B02.Y2/B02.X2-B02.X5 09/07/2023
CONC-007
B02.X1/B02.Y1-B02.Y8; MDG-B.02-ITP-C-FOUNDATION-
5.8 Móng F2, F1B, F1F/ Foundation F2, F1B, F1F 15/07/2023
B02.X2/B02.Y1-B02.Y2 CONC-008
MDG-B.02-ITP-C-FOUNDATION-
5.9 Móng F2, F1B, F1F/ Foundation F2, F1B, F1F B02.Y1/B02.X3-B02.X5 16/08/2023
CONC-009
D DA KIENG/ BEAM
1 DAO DAT/ EXCAVATION
(B02.X5/B02.Y5-B02.Y9);
(B02.X1-B02.X2/B02.Y5-B02.Y9) MDG-B.02-ITP-C-BEAM-
1.1 Đà kiềng tầng 1 nhà B.02 / 1st beam, building B.02 8/9/2023
(B.02.Y8'-B.02.Y9/ B.02.X1- EXCAVATION-001
B.02.X5)
2 BE TONG LOT/ LEAN CONCRETE
(B02.X5/B02.Y5-B02.Y9);
(B02.X1-B02.X2/B02.Y5-B02.Y9) MDG-B.02-ITP-C-BEAM-LEAN
2.1 Đà kiềng tầng 1 nhà B.02 / 1st beam, building B.02 8/10/2023
(B.02.Y8'-B.02.Y9/ B.02.X1- CONC-001
B.02.X5)
3 COT THEP/ REBAR
(B02.X5/B02.Y5-B02.Y9);
(B02.X1-B02.X2/B02.Y5-B02.Y9)
3.1 Đà kiềng tầng 1 nhà B.02 / 1st beam, building B.02 (B.02.Y8'-B.02.Y9/ B.02.X1-
8/12/2023 MDG-B.02-ITP-C-BEAM-REBAR-001
B.02.X5)
4 VAN KHUON/ FORMWORK
ĐỐI TƯỢNG NGHIỆM THU NGÀY NGHIỆM
ITEM INSPECTION VỊ TRÍ NGHIỆM THU THU SỐ BIÊN BẢN ACW
STT
CÔNG VIỆC NGHIỆM THU LOCATION ACCEPTANCE OF REP NO.
INSPECTION OF WORK WORK DATE
(B02.X5/B02.Y5-B02.Y9);
(B02.X1-B02.X2/B02.Y5-B02.Y9)
4.1 Đà kiềng tầng 1 nhà B.02 / 1st beam, building B.02 (B.02.Y8'-B.02.Y9/ B.02.X1-
8/13/2023 MDG-B.02-ITP-C-BEAM-FORMW-001
B.02.X5)
5 BE TONG/ CONCRETE
(B02.X5/B02.Y5-B02.Y9);
(B02.X1-B02.X2/B02.Y5-B02.Y9)
5.1 Đà kiềng tầng 1 nhà B.02 / 1st beam, building B.02 (B.02.Y8'-B.02.Y9/ B.02.X1-
8/13/2023 MDG-B.02-ITP-C-BEAM-CONC-001
B.02.X5)
F COT / COLUMN
COT TANG 1/ 1ST FLOOR COLUMNS
1 COT THEP/ REBAR
MDG-B.02-ITP-C-COLUMN-REBAR-
1.1 Cột C2 (600x600) / C2 column (600x600) B02.X2/B02.Y2-B02.Y8 23/07/2023
001
MDG-B.02-ITP-C-COLUMN-REBAR-
1.2 Cột C2 (600x600) / C2 column (600x600) B02.X3/B02.Y2-B02.Y8 25/07/2023
002
MDG-B.02-ITP-C-COLUMN-REBAR-
1.3 Cột C2 (600x600) / C2 column (600x600) B02.X4/B02.Y2-B02.Y6 26/07/2023
003
(B02.X1/B02.Y5-B02.Y9);
MDG-B.02-ITP-C-COLUMN-REBAR-
1.4 Cột C1 (400x600) / C1 column (400x600) (B02.X5/B02.Y5-B02.Y9); 17/08/2023
(B02.Y9/B02.X2-B02.X4) 004
2 VAN KHUON/ FORMWORK
MDG-B.02-ITP-C-COLUMN-FORMW-
2.1 Cột C2 (600x600) / C2 column (600x600) B02.X2/B02.Y2-B02.Y8 24/07/2023
001
MDG-B.02-ITP-C-COLUMN-FORMW-
2.2 Cột C2 (600x600) / C2 column (600x600) B02.X3/B02.Y2-B02.Y8 26/07/2023
002
MDG-B.02-ITP-C-COLUMN-FORMW-
2.3 Cột C2 (600x600) / C2 column (600x600) B02.X4/B02.Y2-B02.Y6 27/07/2023
003
(B02.X1/B02.Y5-B02.Y9);
MDG-B.02-ITP-C-COLUMN-FORMW-
2.4 Cột C1 (400x600) / C1 column (400x600) (B02.X5/B02.Y5-B02.Y9); 18/08/2023
(B02.Y9/B02.X2-B02.X4) 004
3 BE TONG/ CONCRETE
MDG-B.02-ITP-C-COLUMN-CONC-
3.1 Cột C2 (600x600) / C2 column (600x600) B02.X2/B02.Y2-B02.Y8 24/07/2023
001
MDG-B.02-ITP-C-COLUMN-CONC-
3.2 Cột C2 (600x600) / C2 column (600x600) B02.X3/B02.Y2-B02.Y8 26/07/2023
002
MDG-B.02-ITP-C-COLUMN-CONC-
3.3 Cột C2 (600x600) / C2 column (600x600) B02.X4/B02.Y2-B02.Y6 27/07/2023
003
(B02.X1/B02.Y5-B02.Y9);
MDG-B.02-ITP-C-COLUMN-CONC-
3.4 Cột C1 (400x600) / C1 column (400x600) (B02.X5/B02.Y5-B02.Y9); 18/08/2023
(B02.Y9/B02.X2-B02.X4) 004
B THÀNH
COT THEP/ REBAR
Vách bể nước PCCC và bể sinh hoạt/Fire protection water MDG-B.02-ITP-C-TANK WALL-
B05.Y1'-B05.Y6'/B05.X1'-B05.X2' 29/07/2023
tank wall and living tank REBAR-001
Vách bể xử lý nước thải/Walls of wastewater treatment MDG-B.02-ITP-C-TANK WALL-
B05.Y1'-B05.Y6'/B05.X1'-B05.X2' 10/08/2023
tanks REBAR-002
VAN KHUON/ FORMWORK
Vách bể nước PCCC và bể sinh hoạt/Fire protection water MDG-B.02-ITP-C-TANK WALL-
B05.Y1'-B05.Y6'/B05.X1'-B05.X2' 05/08/2023
tank wall and living tank FORMW-001
Vách bể xử lý nước thải/Walls of wastewater treatment MDG-B.02-ITP-C-TANK WALL-
B05.Y1'-B05.Y6'/B05.X1'-B05.X2' 17/08/2023
tanks FORMW-002
BE TONG/ CONCRETE
Vách bể nước PCCC và bể sinh hoạt/Fire protection water MDG-B.02-ITP-C-TANK WALL-
B05.Y1'-B05.Y6'/B05.X1'-B05.X2' 06/08/2023
tank wall and living tank CONC-001
Vách bể xử lý nước thải/Walls of wastewater treatment MDG-B.02-ITP-C-TANK WALL-
B05.Y1'-B05.Y6'/B05.X1'-B05.X2' 18/08/2023
tanks CONC-002
C NẮP
1 VAN KHUON/ FORMWORK
Thi công lắp đặt ván khuôn nắp bể nước PCCC và bể sinh
MDG-B.05-ITP-C-TANK LID-
1.1 hoạt/ Construction and installation of formwork for fire B05.Y1'-B05.Y6'/B05.X1'-B05.X2' 23/08/2023
protection water tank covers and domestic tanks FORMW-004
Thi công lắp đặt ván khuôn nắp bể xử lý nước thải/
MDG-B.05-ITP-C-TANK LID-
1.2 Construction and installation of formwork and cover of B05.Y1'-B05.Y6'/B05.X1'-B05.X2' 03/09/2023
wastewater treatment tank FORMW-005
2 COT THEP/ REBAR
Thi công lắp đặt cốt thép nắp bể nước PCCC và bể sinh
MDG-B.05-ITP-C-TANK LID-REBAR-
2.1 hoạt/ Construction and installation of reinforced concrete B05.Y1'-B05.Y6'/B05.X1'-B05.X2' 30/08/2023
covers for fire protection water tanks and domestic tanks 004
Thi công lắp đặt cốt thép nắp bể xử lý nước thải/
MDG-B.05-ITP-C-TANK LID-REBAR-
2.2 Construction and installation of steel reinforcement for B05.Y1'-B05.Y6'/B05.X1'-B05.X2' 10/09/2023
wastewater treatment tank lids 005
3 BE TONG/ CONCRETE
Thi công đổ bê tông nắp bể nước PCCC và bể sinh hoạt/
MDG-B.05-ITP-C-TANK LID-CONC-
3.1 Construction of concrete pouring of fire protection water B05.Y1'-B05.Y6'/B05.X1'-B05.X2' 31/08/2023
tank cover and living tank 001
NHÀ B.01
II
B.01 BUILDING
A COC/ PILE
B MONG/ FOUNDATION
C DA KIENG/ BEAM