MUK-62-MGT-AIC-09015 Rev 0 110331
MUK-62-MGT-AIC-09015 Rev 0 110331
1. PURPOSE .............................................................................................................................................. 3
2. SCOPE OF WORK ................................................................................................................................. 3
3. REFERENCE TECHNICAL DOCUMENTS............................................................................................ 3
4. DUTIES AND RESPONSIBILITIES ....................................................................................................... 3
5. HEALTH AND SAFETY ENVIRONMENT.............................................................................................. 3
6. METHOD & QUALITY CONTROL ......................................................................................................... 3
6.1 MATERIAL RECEIPT AND SITE STORAGE ................................................................................................. 4
6.2 PRE – INSTALLATION ............................................................................................................................. 4
6.2.1 Procedure .................................................................................................................................. 4
6.2.2 Check Sheets ............................................................................................................................. 4
6.3 INSTALLATION ....................................................................................................................................... 4
6.3.1 Procedure .................................................................................................................................. 4
6.3.2 Check Sheets ............................................................................................................................. 4
6.4 PRE-COMMISSIONING ........................................................................................................................... 4
6.4.1 Procedure .................................................................................................................................. 4
6.4.2 Test Report ................................................................................................................................ 4
6.5 COMMISSIONING ................................................................................................................................... 4
6.5.1 Procedure .................................................................................................................................. 4
6.5.2 Test Report ................................................................................................................................ 4
7. ATTACHMENTS..................................................................................................................................... 5
Page 2 of 31
1. Purpose
The purpose of this document is to define the site procedures for the Medium Voltage Switchgear. This
document has been compiled in compliance with manufacturer recommended specifications and standards
relating to the installation, pre-commissioning and commissioning of the Medium Voltage Switcgear.
2. Scope of Work
As per the contract, OXY appointed installation contractor shall carry out the site activities for the items as
specified in the table below. The relevant tests formats & check sheets applicable to equipment as referred
in subsequent clauses are attached with this document.
Associate cable
Commissioning
Commissioning
termination
Installation
Equipment
Remarks
Quantity
laying &
Supply
Sl No
Pre -
Area
WTP Substation –
1 1 I/C Cable by OXY
6.6kV Switchgear
Page 3 of 31
4.1 Material Receipt and Site Storage
Materials are received and stored at site as per manufacturers recommended procedures. On the receipt
of the material, same shall be physically checked and “Goods Received and Inspection Report” (Doc no –
M/QAF/01/08) shall be duly filled. Refer procedure for receiving inspection storage and issue of materials
(Doc no – M/QAF/01/08).
4.3 Installation
4.3.1 Procedure
Installation of Medium Voltage Switchgear involves foundations, supports, mounting, clamping and
termination of cables. Refer Installation procedure for Medium Voltage Switchgear (Doc No –
QP/EL/MV/IN/P).
4.3.2 Check Sheets
After completion of installation, all equipments shall be identified and check sheets shall be filled based on
the reference documents mentioned above. The check sheets shall be signed and accepted by the
representatives of the main contractor and the client. Refer Installation check sheet for Medium Voltage
Switchgear (Doc no – QP/EL/MV/IN/C).
4.4 Pre-Commissioning
4.4.1 Procedure
Pre-commissioning shall be deemed to be complete when all systems and controls have been checked and
successfully functionally tested and results recorded and acknowledged by Client as ready to start up the
plant. Refer pre-commissioning procedure for Medium Voltage Switchgear (Doc no – QP/EL/MV/PG/P).
4.4.2 Test Report
Pre-commissioning test shall be carried out and confirm compliance of the project documents. The test
results shall be recorded and are to be signed and accepted by the representatives of the contractor and
the client. The test instruments used shall have a valid calibration certificate. Refer pre-commissioning test
report for Medium Voltage Switchgear (Doc no – QP/EL/MV/PG/T).
4.5 Commissioning
4.5.1 Procedure
Commissioning is the final step involved to energize the said equipment. The commissioning period is the
time required to check the performance of equipment in energized condition. Refer commissioning
procedure for Medium Voltage Switchgear (Doc no- QP/EL/MV/CG/P).
4.5.2 Test Report
After energizing the equipment, few major electrical parameter reading shall be periodically recorded as per
commissioning test report for Medium Voltage Switchgear (Doc no- QP/EL/MV/CG/T).
Page 4 of 31
5. Attachments
Applicable
Sl No. Document No. Revision Description
X = Yes
Receiving, inspection, storage and issue of
1 M/QAP/01/07 0 X
materials
2 M/QAF/01/08 0 Goods Received and Inspection Report form X
3 QP/EL/MV/PN/P 0 Procedure for pre-installation of MV Switchgear X
4 QP/EL/MV/PN/C 0 Check sheet for pre-installation of MV Switchgear X
5 QP/EL/MV/IN/P 0 Procedure for installation of MV Switchgear X
6 QP/EL/MV/IN/C 0 Check sheet for installation of MV Switchgear X
7 QP/EL/MV/PG/P 0 Procedure for pre-commissioning of MV Switchgear X
Check sheet for pre-commissioning of MV
8 QP/EL/MV/PG/C 0 X
Switchgear
9 QP/EL/MV/PG/T01 0 Ductor test X
10 QP/EL/MV/PG/T02 0 Hipo test X
11 QP/EL/MV/PG/T03 0 Functional test – No load X
12 QP/EL/MV/PG/T04 0 Protection relay U/V X
13 QP/EL/MV/PG/T05 0 Protection relay 50/50N X
14 QP/EL/MV/PG/T06 0 Protection relay 51/51N X
15 QP/EL/MV/PG/T07 0 Motor protection 51MS NO
16 QP/EL/MV/PG/T08 0 Blocking Rotor 51LR X
17 QP/EL/MV/PG/T09 0 Unbalanced load protection 46 X
18 QP/EL/MV/PG/T10 0 Thermal overload protection 49 X
19 QP/EL/MV/PG/T11 0 IR for CT X
20 QP/EL/MV/PG/T12 0 IR for CBCT X
21 QP/EL/MV/PG/T13 0 Ratio check CT X
22 QP/EL/MV/PG/T14 0 Polarity check CT X
23 QP/EL/MV/PG/T15 0 IR for VT X
24 QP/EL/MV/PG/T16 0 Ratio check for VT X
25 QP/EL/MV/PG/T17 0 Polarity check VT X
26 QP/EL/MV/CG/P 0 Procedure for commissioning of MV Switchgear X
27 QP/EL/MV/CG/C 0 Check sheet for commissioning of MV Switchgear X
28 QP/EL/MV/CG/T 0 Test report for commissioning of MV Switchgear X
Page 5 of 31
QP/EL/MV/PN/P
PROCEDURE FOR
MEDIUM VOLTAGE SWITCHGEAR
PRE-INSTALLATION REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
1. Purpose
The purpose of this document is to define the pre-installation procedure for Medium Voltage Switchgear.
2. Procedure
1. It is assumed that the switchgear factory acceptance test (FAT) has been performed at the
manufacturer’s works. The factory acceptance test shall generally include a functional test, and a
conformity test to ensure that all hardware is in accordance with the project requirement. The
following checking shall be carried out at site.
2. Remove any temporary weatherproofing and silica gel drying agents from switchgear. Inspect the
inner and outer part of the switchgear for cleanliness and mechanical damage.
3. Verify that the equipment certificates meet the area classification and specification requirements,
including weather, dust and vermin proofing.
4. Check the switchgear data with the equipment schedule, paying particular attention to the
equipment rating and project requirement.
6. Check firmly the Internal and external components of the switchgear if all are in good condition and
in accordance with the specification requirements.
7. Any missing components or damage must be reported on the check sheet and must be repaired as
necessary before commissioning.
9. After the physical check, the pre–installation checklist for Medium Voltage Switchgear shall be
completely filled (Doc No – QP/EL/MV/PN/C).
Page 1 of 1
Page 6 of 31
QP/EL/MV/PN/C
CHECKLIST FOR
MEDIUM VOLTAGE SWITCHGEAR
PRE-INSTALLATION REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER/
:
MODEL NO.
5. 5.
4. Vendor manual 4.
3. Single line diagram 3.
2. Equipment layout and installation detail 2.
1. Vendor drawing 1.
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 7 of 31
QP/EL/MV/IN/P
PROCEDURE FOR
MEDIUM VOLTAGE SWITCHGEAR
INSTALLATION REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
1. Purpose
The purpose of this document is to define the installation procedure for Medium Voltage Switchgear.
2. Procedure
1. Verify and identify the exact location of MV Switchgear from the plan layout.
2. Check all material and accessories, safety equipments, etc. are available for the entire work in the
works spot.
5. Complete the installation checklist for Medium Voltage Switchgear (Doc No – QP/EL/MV/IN/C).
Page 1 of 1
Page 8 of 31
QP/EL/MV/IN/C
CHECKLIST FOR
MEDIUM VOLTAGE SWITCHGEAR
INSTALLATION REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER/
:
MODEL NO.
5. Vendor manual 5.
4. Cable schedule 4.
3. Single line diagram 3.
2. Equipment layout and installation detail 2.
1. Vendor drawing 1.
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 9 of 31
QP/EL/MV/PG/P
PROCEDURE FOR
MEDIUM VOLTAGE SWITCHGEAR
PRE-COMMISSIONING REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
1. Purpose
The purpose of this document is to define the pre-commissioning procedure for Medium Voltage
Switchgear.
2. Procedure
1. Check tightness of connections for all power and control components line, fuses, breakers,
overloads and starters.
2. Ensure all external power and control cable is disconnected except control supply cable for pre-
commissioning.
4. Check that all accessories and other components are in correct rating, position and tightness and
totally capable of working for its function.
5. Ensure that the assembly is thoroughly cleaned and free from any metallic powders, loose
fasteners, bits and pieces of wires and any other unwanted components or parts.
6. Ensure that all the tests necessary before operation of the equipment has been done accordingly,
result recorded, approved and signed by the client.
Page 1 of 1
Page 10 of 31
QP/EL/MV/PG/C
CHECKLIST FOR
MEDIUM VOLTAGE SWITCHGEAR
PRE-COMMISSIONING REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER/
:
MODEL NO.
5. 5.
4. Component catalog 4.
3. Cable schedule 3.
2. Single line diagram 2.
1. Vendor drawing 1.
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 11 of 31
QP/EL/MV/PG/T01
MV SWITCHGEAR
PRE-COMMISSIONING TESTS
DUCTOR TEST REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
Test Signed
Panel No.
Date
EC MC EO
b c b c b c b c b c b c b c
Measure
Point
a a a a a a a
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2. Micro ohmmeter
1. Vendor wiring diagram 1. Torque wrench
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 12 of 31
QP/EL/MV/PG/T02
MV SWITCHGEAR
PRE-COMMISSIONING TESTS
HIPO TEST REV DATE
00 03-Jul-07
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
Section
B
* High voltage applied to busbar (RYB bonded together) with breakers outgoing poles bonded together and
connected to earth.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2. HV Test kit
1. Vendor wiring diagram 1. Megger
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 13 of 31
QP/EL/MV/PG/T03
MV SWITCHGEAR
PRE-COMMISSIONING TESTS
FUNCTIONAL TEST – NO LOAD REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2.
1. Vendor wiring diagram 1. Multimeter
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 14 of 31
QP/EL/MV/PG/T04
MV SWITCHGEAR
PRE-COMMISSIONING TESTS
PROTECTION RELAY U/V REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
Test Signed
Phase Pick-up (V) Initiating/Trip time (s) Drop-Off (V)
Date EC MC EO
R
Y
B
Test Signed
Phase Pick-up (V) Initiating/Trip time (s) Drop-Off (V)
Date EC MC EO
R
Y
B
5. 5.
4. Component catalogs 4.
3. Supplier internal test report 3. Digital timer
2. Single line diagram 2. 3 Phase variac
1. Vendor wiring diagram 1. Multimeter
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 15 of 31
QP/EL/MV/PG/T05
MV SWITCHGEAR
PRE-COMMISSIONING TESTS
PROTECTION RELAY 50/50 N REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
Test Signed
Pick-up current (A) Rp Yp Bp
Date EC MC EO
Trip Time Seconds
Injected current
R Y B
Test Signed
Pick-up current (A) Rp Yp Bp
Date EC MC EO
Trip Time Seconds
Injected current
R Y B
5. 5.
4. Component catalogs 4.
3. Supplier internal test report 3.
2. Single line diagram 2. Secondary injection kit
1. Vendor wiring diagram 1. Multimeter
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 16 of 31
QP/EL/MV/PG/T06
MV SWITCHGEAR
PRE-COMMISSIONING TESTS
PROTECTION RELAY 51/51 N REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2. Secondary injection kit
1. Vendor wiring diagram 1. Multimeter
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 17 of 31
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
80%
100%
120%
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2. Secondary injection kit
1. Vendor wiring diagram 1. Multimeter
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 18 of 31
QP/EL/LV/PG/T08
MV SWITCHGEAR
PRE-COMMISSIONING TESTS
BLOCKING ROTOR 51 LR REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2. Secondary injection kit
1. Vendor wiring diagram 1. Multimeter
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 19 of 31
QP/EL/LV/PG/T09
MV SWITCHGEAR
PRE-COMMISSIONING TESTS
UNBALANCED LOAD REV DATE
PROTECTION 46 00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2. Secondary injection kit
1. Vendor wiring diagram 1. Multimeter
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 20 of 31
QP/EL/LV/PG/T10
MV SWITCHGEAR
PRE-COMMISSIONING TESTS
THERMAL OVERLOAD REV DATE
PROTECTION 49 00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2. Secondary injection kit
1. Vendor wiring diagram 1. Multimeter
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 21 of 31
QP/EL/LV/PG/T11
MV SWITCHGEAR
PRE-COMMISSIONING TESTS
IR FOR CT REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2.
1. Vendor wiring diagram 1. Megger
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 22 of 31
QP/EL/LV/PG/T12
MV SWITCHGEAR
PRE-COMMISSIONING TESTS
IR FOR CB CT REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2.
1. Vendor wiring diagram 1. Megger
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 23 of 31
QP/EL/LV/PG/T13
MV SWITCHGEAR
PRE-COMMISSIONING TESTS
RATIO CHECK FOR CT REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2. Primary injection kit
1. Vendor wiring diagram 1. Multimeter
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 24 of 31
QP/EL/LV/PG/T14
MV SWITCHGEAR
PRE-COMMISSIONING TESTS
POLARITY CHECK FOR CT REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2. Polarity check device
1. Vendor wiring diagram 1. 9V Battery
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 25 of 31
QP/EL/LV/PG/T15
MV SWITCHGEAR
PRE-COMMISSIONING TESTS
IR FOR VT REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
sITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2.
1. Vendor wiring diagram 1. Megger
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 26 of 31
QP/EL/LV/PG/T16
MV SWITCHGEAR
PRE-COMMISSIONING TESTS
RATIO CHECK FOR VT REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2. Multimeter
1. Vendor wiring diagram 1. Variac / Auto transformer
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 27 of 31
QP/EL/LV/PG/T17
MV SWITCHGEAR
PRE-COMMISSIONING TESTS
POLARITY CHECK FOR VT REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2. Polarity check device
1. Vendor wiring diagram 1. 9V Battery
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 28 of 31
QP/EL/MV/CG/P
PROCEDURE FOR
MEDIUM VOLTAGE SWITCHGEAR
COMMISSIONING REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
1. Purpose
The purpose of this document is to define the commissioning procedure for Medium Voltage Switchgear.
2. Procedure
1. Ensure that there is no obstruction in closing and opening of the equipment.
4. After energization of panel, check the phase sequence of incomer supply before closing of incomer
breaker.
5. Complete commissioning test report for Medium Voltage Switchgear (Doc No - QP/EL/MV/CG/T).
Reading shall be recorded at every hour interval for eight (8) hours.
Page 1 of 1
Page 29 of 31
QP/EL/MV/CG/C
CHECKLIST FOR
MEDIUM VOLTAGE SWITCHGEAR
COMMISSIONING REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER/
:
MODEL NO.
5. Vendor manual 5.
4. Cable Schedule 4.
3. Single Line Diagram 3.
2. Equipment layout and installation detail 2.
1. Vendor drawing 1.
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 30 of 31
QP/EL/MV/CG/T
MV SWITCHGEAR
COMMISSIONING
TEST REPORT REV DATE
00 Jan 10 11
PROJECT: MUKHAIZNA FACILITIES DEVELOPMENT - WTP
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
EQUIPMENT COMPONENT
Type :
Range :
Serial No. :
Make/ Model :
Voltage Current
Any Signed
(V) (A)
Date Time Abnormality Remarks
R-Y Y-B B-R R Y B Found EC MC EO
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2.
1. Vendor wiring diagram 1. Phase sequence meter
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 1 of 1
Page 31 of 31