To lock off live electrical equipments and make sure that only the competent
electrical person has _______________
To allow the competent electrical person to lock off electrical systems when they
need to be ______________________
Isolation
Switch
Site Main
Distribution
Board
Site Sub
Distribution
Boards
ANSWERS
LOCK AND TAG SYSTEMS
To lock off live electrical equipments and make sure that only the competent
electrical person has access
To allow the competent electrical person to lock off electrical systems when they
need to be maintained / repaired / modified
To allow the competent electrical system to energise a system for the first time in
a safe, controlled manner..
LOCK AND TAG SYSTEMS
Fill in the missing blanks to identify the five steps needed to ENERGISE A SYSTEM FOR THE FIRST
TIME
Isolation
Switch
Site Main
Distribution
Board
Site Sub
Distribution
Boards