G 0 Haileab
G 0 Haileab
Item no
Description Unit QTY Rate Amount
SUMMARY
OF
BILL OF QUANTITIES
FOR
G+0 RESIDENCE BUILDING
B. SUPER STRUCTURE
2 Walling...................................................................................Birr 264,352.04
3 Roofing...................................................................................Birr 245,122.70
4 Carpentry and Joinery............................................................. Birr 311,182.31
6 Plastering and Pointing............................................................ Birr 254,035.78
7 Finishing.................................................................................Birr 577,708.18
8 Glazing...................................................................................Birr 162,473.24
9 Painting..................................................................................Birr 131,914.75
Page 1
Project Name:G+0 Residence Building
Item no
Description Unit QTY Rate Amount
Item no
Description Unit QTY Rate Amount
2. 0 BLOCK WORK
2.01 Class B, 200mm thick HCB wall with the designed
compressive strength , bedded in cement mortar (1:3).Price
shall include mortar bed. M2 94.39 1459.70 137,780.12
2.03 Class B, 150mm thick HCB wall with the designed
compressive strength , bedded in cement mortar (1:3).Price
shall include mortar bed. M2 116.72 1084.41 126,571.92
Page 2
Project Name:G+0 Residence Building
Item no
Description Unit QTY Rate Amount
3.0 ROOFING
3.01 EGA roof cover, fixed to wooden purlins,price shall include
ridge cap, washer & bolts,7x5cm Purlins & 10x10 zigba
rafter( roof measured in horizontal projection).
M2 120.00 1943.66 233,239.68
3.02 Supply and fix G-28 galvanized flat metal sheet gutter as per
the detail drawing. Price shall include all necessary
accessories, metal brackets, one coat of antirust paint and two
coat of synthetic enamel paint.
Development. length =670mm Ml 9.00 1320.34 11,883.02
Page 3
Project Name:G+0 Residence Building
Item no
Description Unit QTY Rate Amount
6.0 PLASTERING AND POINTING
6.01 Apply three coats of plastering in cement mortar (1:3). Price
shall include pre-cleaning and preparation of the surface.
7.0 FINISHING
7.01 Imported type best quality Non Slipery flooring stuck down
with approved type adhesive on cement sand screed floor
finish and joints grouted in appropriate colour setting coat
mortar,colour and pattern of tile shall be approved by the
Architect.
a) 10mm thick 40cm x40cm ceramic floor tile. M2 120.00 3821.47 458,576.64
7.02 10x100mm high Ceramic skirting stuck to wall with approved
type adhesive with cement sand mortar backing.
Ml 111.91 384.56 43,036.56
7.05 30mm. Thick Marble door cill on concrete floor. 38.28 1988.11
Ml 76,094.99
8.0 GLAZING
8.01 4mm thick clear glass glazed with beads, rubber gasket and
sealant to PVC profile frames.
M2 88.12 1843.67 162,473.24
TOTAL CARRIED TO SUMMARY ....................... 162,473.24
9.0 PAINTING
a) To all internal wall surface. M2 233.44 132.31 30,886.91
9.02 Aplly Kadisco or equivalent type Quartz paint to all external
wall surface according to complete manufacturers instruction
apllication.
a) To external wall surface M2 188.78 535.16 101,027.83
Page 4
No Length Width Height Sum Remark
a) 200 mm thick HCB wall (One side external)
3) CARPANTARY
chipwood ceiling
0.00 0.00 0.00 0.00 -
0.00 0.00 0.00 0.00 -
0 0.00 0.00 0.00 120.00
Total Sum 120.00
4) FINISHING WORKS
a) Three coats of plastering to internal walls
b) Ceramic skirting
Ground Floor
Door cill
3BASEMENT - 2ND FLOOR
REAR
2 0.80 0.30 1.00 1.60 W1
3 1.00 0.30 1.00 3.00 W2
3 0.85 0.30 1.00 2.55 W3
1 1.00 0.30 1.00 1.00 w4
1 0.75 0.30 1.00 0.75 TW2
1 3.825 0.28 1.00 3.83 W5
1 2.15 0.28 1.00 2.15 TW1
6 3.90 0.28 1.00 23.40 w6
Total Sum 38.28 ml
Item
no Description Unit QTY Rate Amount
GRAND SUMMARY