Combined Application Form
Combined Application Form
As per MERC (Electricity Supply Code and Other Conditions of Supply) Regulations, 2005
I / We hereby submit application for (PLEASE TICK THE BOX, WHICHEVER IS APPLICABLE).
Affix passport Affix passport
New Connection Changeover size photo & size photo &
sign across sign across
Switchover Extension of Load (Mandatory for (Mandatory for
Reduction of Load Shifting of service name change name change
Lane/Street
Landmark
Suburb/City Pincode
Pan No. (optional)
Mobile / Phone No.
E-mail
Meter No.
Existing Consumer No.
3. Category of Premises Chawl Slum Industry Bungalows Company Residential Society Pagadi Others
Lane/Street
Landmark
Suburb/City
Pincode
10. Applicants Correspondence Address (If other than Power Supply Address)
Lane/Street
Landmark
Suburb/City
Pincode
11. Existing Supply Details (Only for Changeover/Switchover applicants)
A/C Existing Connected
Name of Electricity Distribution company
No. load (kW/kVA)
Supply Voltage Low Voltage (LT) Single Phase Low Voltage Three Phase High Voltage
Existing Category of Supply Residential Commercial Temporary Religious Advertisement & Hoardings Railways
Industrial Public service Group Housing Public service Others Temporary Others
Crematorium & Burial Grounds Street Lights Electrical Vehicle
Others
Point no. 12 & 13 to be filled only for New Connection, Change of Load and Contract Demand
Choice of Meter Tata Power Meter Existing meter Purchase Own meter
Low Voltage Single Phase Low Voltage Three Phase High Voltage
Required Voltage
Nos. Nos. Nos.
No. of Meters
Residential Commercial Temporary Religious Advertisement & Hoardings
Required/Applied Category of Supply
Railways Industrial Public service Group Housing
Public service Others Temporary Others Crematorium & Burial Grounds Street Lights
Electrical Vehicle Others
13 (a) Load Details (*Please attach load details duly certified by Licensed Electrical Contractor on Separate Sheet.)
a) Tubelights/Bulbs
b) Fans
c) Geysers
d) Chillers/Air Conditioners
e) Refrigerator
f) Machineries
g) Miscellaneous
h) Water Pumps
i) Lifts
j) Fire Fighting
k) Common Lighting
Total
(b) Load Details
Particulars Details of Existing load Details of Additional load Details of Reduction in Load Total
(C) The wiring & Load details Certified by the following Licensed Electrical Contractor
Name Email :
Address
2. To be bound by the provisions of MERC order dated 15th Oct.2009 in Case No. 50 of 2009 pertaining to interim arrangement for Mumbai North area
customer changeover by usage of network infrastructure of Existing Distribution License and any further MERC orders/regulations or otherwise
regarding the same.
3. To be bound by the provisions of the Power Supply Agreement (for all sanctioned load of 50 KW/63 Kva and more) &Substation Space Agreement
(where substation is required) to be executed with Tata Power.
4. To pay for the said supply at the prevailing tariff rates and also to pay the charges based on the Schedule of Charges as approved by MERC for Tata
Power from time to time.
5. That change of name/purpose/classification category shall not be permitted at the time or during the changeover process and the changed-over
consumer shall abide by the conditions of Changeover even after the change of name/purpose/classification category
6. Customers availing supply through AEML agree to pay the necessary wheeling losses/wheeling charges as approved by MERC from time to time.
7. There are no arrears pending against the premises for which I/we have applied for power supply. If any arrears are found to be pending against the
said premises, I/we shall be bound to make payment towards such arrears. Also, I/we have been informed and made aware that if any previous
arrears are pending on the premises, I/we shall not receive any new connection for the said premises.
8. I/we am/are the sole occupant/owner of the above premises for which the above mentioned meters are connected and that the electric supply from
the above connection is used exclusively for the above premises. I also state that I am not receiving supply at the above premises through any other
meter/meters
9. In case of any false representation on my/our part or case of any objection from the present registered consumer or in case the documents produced
by me/us are not absolutely correct. The Tata Power Company Limited reserves the right to transfer the connection from the name of the present
registered consumer.
10. I also under take to keep the Tata Power Company Limited indemnified of any consequences at any time in future in case of any dispute on account of
the transfer of the above connection to my/our/name/names.
11. To pay the Charges for Shifting of Meter/Service (as per MERC approved Schedule of Charges)
12. To pay the amount to be incurred towards the shifting of Services as per the cost estimate, which will be given by Tata Power
13. Permissions for carrying out excavation etc. within consumer premises shall be obtained by the Consumer from the Housing Society/Industrial
Estate/Commercial Complex. All excavations (including obtaining necessary MCGM permit) and back filling required for cable laying/diversion etc.
upto the consumer premises will be carried out by Tata Power.
15. To provide suitable weather protection roof for the same in case the Meter panel is mounted on wall outside the building.
16. To undertake removal of excess earth if any and permanent reinstatement of the surface at consumers cost within consumers premises.
17. To uprate the cable and related equipment's after the point of supply to appropriate size to match with the enhanced capacity (for load
extension/reduction/category change/meter shifting)
Important Note: I/We hereby certify that the electricity installation work at premises and the party mentioned above has been carried out by me/us in full conformity with the
prevailing CEA (Measures Relating to Safety and Electric Supply) Regulations, 2010 or any amendments thereof. The particulars of the installation and insulation test result
obtained by me/us are given below.
Applicant's Name:
Signatory Name:
Date : D D M M Y Y Y Y Signature :
Mob. No.: (Stamp of Organization required for non residential consumers)
Email ID :
Documents Attached & Verified (Please underline appropriate box) Officer name:____________________ CRC Name: ____________________
PTO (Annexure Overleaf)
Documents for Changeover / Switchover / New Connection
Documents for LOAD
Documents for
Ownership/Premises Occupation Proof Documents related to power EXTENTION / LOAD REDUCTION
METER SHIFTING PROCESS
(Any one of the following) supply (As applicable) PROCESS
Ration Card (For Changeover/Switchover Location Map & Plot Plan of Application processing charges Application processing charges
Residential Consumers only) site (for new projects)
Copy of latest Electricity bill duly Copy of latest Electricity bill duly paid
Voters ID Card (For Changeover/
Switchover Residential Consumers only) Approved Plan by relevant paid Layout plan showing the existing and
Aadhar Card (For Changeover/Switchover authority (for New Project) proposed location for shifting of service /
Work completion & Test Report
Residential Consumers only)
meter in the premises
Power Supply Agreement duly certified by Licensed
Society Share Certificate / Maintenance bill
or Receipt / Society Letter (Applicable for (for every meter where Electrical Contractor In case the applicants premises is on rent /
Changeover Applicants) sanctioned Load >=50 lease, please attach copy of the ‘NOC’
Power supply agreement (as per
Society Registration Certificate for KW/63 KVA) (Single copy from the owner of premises.
common services like Lift, Staircase, Water approved Tata Power format) for
for LT Consumer Two copy
pump, Etc. sanctioned Load of 50 KW (67
for HT Consumer) Documents for Category change
Owners NOC with leave & license / Lease HP / 63 KVA) and more. For
agreement (If applicant is not premises
Sub-station Space consumers having sanctioned Test Report
owner)
Agreement from Property Load less than 50 KW. this
MCGM / MBMC Property Tax bill / Receipt Application processing charges
Developer (if S/s is created application form shall constitute
MIDC / SEEPZ Order / Letter of Allotment / NOC from the society for change tariff
within the premises as the agreement.
Approval Lease Agreement
category (In Resi & Commercial cases),
Govt. Issued Property card of 7/12 Work completion & Test Substation Agreement (as per NOC from chawl commitee for chawl
Extract/IOD
report (for each meter) approved Tata Power Format) cases.
Purchase / Sale agreement with builder /
Previous owner Electricity Duty exemption N OC fr o m D i r e c to r a te o f Gumasta license / practicing certificate (in
Passport (for Residential Consumers only) eligibility Certificate (if Industries / MCGM permit for case of CA / Dr.) / Common service
applicable) Industrial Load. certificate (Lift, staircase, water pump,
Identity Proof (Any one of the following)
etc.)
Voter’s Identification Card Photocopy of latest paid R-
infra energy bill (front & NOC from Directorate of Industries /
Aadhar Card MCGM permit for Industrial Load. (In case
back side) (for changeover
Passport application) of industrial consumer).
PAN Card
Applicable to Industrial Applications Only : NOC from Directorate of Industries / Municipal corporation Permit for Industrial load, if applicable
NOC from Pollution Control Board for Industry, if applicable
The Application processing charges would be payable as per Schedules of Charges.
(Rupees in words)
Payment details :
Security Deposite : Application Charges :
Distribution Division, The Tata Power Company Limited, Dharavi Receiving Station, Near Shalimar Indl Estate, Matunga, Mumbai 400 019
To know the status of your application, please log on to https://cp.tatapower.com/ or call 1-800-209-5161 (Toll Free).
For more information, visit cp.tatapower.com or call 1-800-209-5161 (Toll Free) or email us at [email protected]
You can now apply for new connection online, please log on to https://cp.tatapower.com/