This form is issued Free of Cost

Application No. Request no.

As per MERC (Electricity Supply Code and Other Conditions of Supply) Regulations, 2005
I / We hereby submit application for (PLEASE TICK THE BOX, WHICHEVER IS APPLICABLE).
Affix passport Affix passport
New Connection Changeover size photo & size photo &
sign across sign across
Switchover Extension of Load (Mandatory for (Mandatory for
Reduction of Load Shifting of service name change name change

Name change Address Correction


Reduction of Contract Demand Extension of Contract Demand
Tariff Category Change
GST No.:
A : Details of Applicant & Premises Aadhar Card No.:

1 (a) Applicant's Name Mr./Mrs./Ms./M/s.


(IN BLOCK LETTERS) First Name Middle Name Surname

First Name Middle Name Surname


(b) Power Supply Address

Flat No./Building Name

Lane/Street

Landmark

Suburb/City Pincode
Pan No. (optional)
Mobile / Phone No.

E-mail
Meter No.
Existing Consumer No.

2. Type of premises Owned Rented Lease Others (Specify) E-billing: Yes No

3. Category of Premises Chawl Slum Industry Bungalows Company Residential Society Pagadi Others

4. Registered Mobile Number


5. Registered Email ID
6. Alternate Mobile Number
7. Alternate Email ID
8. Preferred Language for Communication English Hindi Marathi

9. In case if the premises is not owned by applicant

Flat No./Building Name

Lane/Street

Landmark

Suburb/City
Pincode
10. Applicants Correspondence Address (If other than Power Supply Address)

Flat No./Building Name

Lane/Street

Landmark

Suburb/City
Pincode
11. Existing Supply Details (Only for Changeover/Switchover applicants)
A/C Existing Connected
Name of Electricity Distribution company
No. load (kW/kVA)
Supply Voltage Low Voltage (LT) Single Phase Low Voltage Three Phase High Voltage

Existing Category of Supply Residential Commercial Temporary Religious Advertisement & Hoardings Railways
Industrial Public service Group Housing Public service Others Temporary Others
Crematorium & Burial Grounds Street Lights Electrical Vehicle
Others
Point no. 12 & 13 to be filled only for New Connection, Change of Load and Contract Demand

12. Power Supply Requirement

Connected Load Contract Demand Supply Requested by


Load Details D D M M Y Y Y Y
(kW) (kVA) Date:

Choice of Meter Tata Power Meter Existing meter Purchase Own meter

Low Voltage Single Phase Low Voltage Three Phase High Voltage
Required Voltage
Nos. Nos. Nos.
No. of Meters
Residential Commercial Temporary Religious Advertisement & Hoardings
Required/Applied Category of Supply
Railways Industrial Public service Group Housing

Public service Others Temporary Others Crematorium & Burial Grounds Street Lights
Electrical Vehicle Others

(FOR OFFICE USE ONLY) Latitude Longitude

Availability of Substation Space and Meter Room


Substation Space Available at Meter Room located at
We agree to pay all applicable taxes, duties & other such
levies like rent, property taxes, etc. for the substation space Indoor Outdoor Ground Floor Other (Please Specify)
as required by various Governmental & local statutory Basement Stilt
authorities like MCGM etc.
Above Flood Level Yes No

13 (a) Load Details (*Please attach load details duly certified by Licensed Electrical Contractor on Separate Sheet.)

Apparatus No. of Points Wattage Per Point Total Wattage

a) Tubelights/Bulbs
b) Fans
c) Geysers
d) Chillers/Air Conditioners
e) Refrigerator
f) Machineries
g) Miscellaneous
h) Water Pumps
i) Lifts
j) Fire Fighting
k) Common Lighting
Total
(b) Load Details

Particulars Details of Existing load Details of Additional load Details of Reduction in Load Total

Motive Power Load (kW)

Connected Load (kW/kVA)

Contract Demand (kVA)

(C) The wiring & Load details Certified by the following Licensed Electrical Contractor
Name Email :

Address

License No. Valid Upto : Phone No (S). LEC Stamp Signature


Declaration :
1. To take supply of electrical energy from the Tata power co. ltd at the aforesaid premises situated within their license area, not exceeding the
sanctioned load of my/our installation as stated above. To be bound by the MERC (Electricity Supply Code and Other conditions of supply)
Regulations, 2005 and as amended from time to time and to provide necessary security deposit as specified therein.

2. To be bound by the provisions of MERC order dated 15th Oct.2009 in Case No. 50 of 2009 pertaining to interim arrangement for Mumbai North area
customer changeover by usage of network infrastructure of Existing Distribution License and any further MERC orders/regulations or otherwise
regarding the same.

3. To be bound by the provisions of the Power Supply Agreement (for all sanctioned load of 50 KW/63 Kva and more) &Substation Space Agreement
(where substation is required) to be executed with Tata Power.

4. To pay for the said supply at the prevailing tariff rates and also to pay the charges based on the Schedule of Charges as approved by MERC for Tata
Power from time to time.

5. That change of name/purpose/classification category shall not be permitted at the time or during the changeover process and the changed-over
consumer shall abide by the conditions of Changeover even after the change of name/purpose/classification category

6. Customers availing supply through AEML agree to pay the necessary wheeling losses/wheeling charges as approved by MERC from time to time.

7. There are no arrears pending against the premises for which I/we have applied for power supply. If any arrears are found to be pending against the
said premises, I/we shall be bound to make payment towards such arrears. Also, I/we have been informed and made aware that if any previous
arrears are pending on the premises, I/we shall not receive any new connection for the said premises.

8. I/we am/are the sole occupant/owner of the above premises for which the above mentioned meters are connected and that the electric supply from
the above connection is used exclusively for the above premises. I also state that I am not receiving supply at the above premises through any other
meter/meters

9. In case of any false representation on my/our part or case of any objection from the present registered consumer or in case the documents produced
by me/us are not absolutely correct. The Tata Power Company Limited reserves the right to transfer the connection from the name of the present
registered consumer.

10. I also under take to keep the Tata Power Company Limited indemnified of any consequences at any time in future in case of any dispute on account of
the transfer of the above connection to my/our/name/names.

11. To pay the Charges for Shifting of Meter/Service (as per MERC approved Schedule of Charges)

12. To pay the amount to be incurred towards the shifting of Services as per the cost estimate, which will be given by Tata Power

13. Permissions for carrying out excavation etc. within consumer premises shall be obtained by the Consumer from the Housing Society/Industrial
Estate/Commercial Complex. All excavations (including obtaining necessary MCGM permit) and back filling required for cable laying/diversion etc.
upto the consumer premises will be carried out by Tata Power.

14. To provide suitable earth pit, in case of shifting or meter panel.

15. To provide suitable weather protection roof for the same in case the Meter panel is mounted on wall outside the building.

16. To undertake removal of excess earth if any and permanent reinstatement of the surface at consumers cost within consumers premises.

17. To uprate the cable and related equipment's after the point of supply to appropriate size to match with the enhanced capacity (for load
extension/reduction/category change/meter shifting)

Important Note: I/We hereby certify that the electricity installation work at premises and the party mentioned above has been carried out by me/us in full conformity with the
prevailing CEA (Measures Relating to Safety and Electric Supply) Regulations, 2010 or any amendments thereof. The particulars of the installation and insulation test result
obtained by me/us are given below.

Applicant's Name:

Signatory Name:

Date : D D M M Y Y Y Y Signature :
Mob. No.: (Stamp of Organization required for non residential consumers)
Email ID :

For OFFICE USE ONLY

Documents Attached & Verified (Please underline appropriate box) Officer name:____________________ CRC Name: ____________________
PTO (Annexure Overleaf)
Documents for Changeover / Switchover / New Connection
Documents for LOAD
Documents for
Ownership/Premises Occupation Proof Documents related to power EXTENTION / LOAD REDUCTION
METER SHIFTING PROCESS
(Any one of the following) supply (As applicable) PROCESS

Ration Card (For Changeover/Switchover Location Map & Plot Plan of Application processing charges Application processing charges
Residential Consumers only) site (for new projects)
Copy of latest Electricity bill duly Copy of latest Electricity bill duly paid
Voters ID Card (For Changeover/
Switchover Residential Consumers only) Approved Plan by relevant paid Layout plan showing the existing and
Aadhar Card (For Changeover/Switchover authority (for New Project) proposed location for shifting of service /
Work completion & Test Report
Residential Consumers only)
meter in the premises
Power Supply Agreement duly certified by Licensed
Society Share Certificate / Maintenance bill
or Receipt / Society Letter (Applicable for (for every meter where Electrical Contractor In case the applicants premises is on rent /
Changeover Applicants) sanctioned Load >=50 lease, please attach copy of the ‘NOC’
Power supply agreement (as per
Society Registration Certificate for KW/63 KVA) (Single copy from the owner of premises.
common services like Lift, Staircase, Water approved Tata Power format) for
for LT Consumer Two copy
pump, Etc. sanctioned Load of 50 KW (67
for HT Consumer) Documents for Category change
Owners NOC with leave & license / Lease HP / 63 KVA) and more. For
agreement (If applicant is not premises
Sub-station Space consumers having sanctioned Test Report
owner)
Agreement from Property Load less than 50 KW. this
MCGM / MBMC Property Tax bill / Receipt Application processing charges
Developer (if S/s is created application form shall constitute
MIDC / SEEPZ Order / Letter of Allotment / NOC from the society for change tariff
within the premises as the agreement.
Approval Lease Agreement
category (In Resi & Commercial cases),
Govt. Issued Property card of 7/12 Work completion & Test Substation Agreement (as per NOC from chawl commitee for chawl
Extract/IOD
report (for each meter) approved Tata Power Format) cases.
Purchase / Sale agreement with builder /
Previous owner Electricity Duty exemption N OC fr o m D i r e c to r a te o f Gumasta license / practicing certificate (in
Passport (for Residential Consumers only) eligibility Certificate (if Industries / MCGM permit for case of CA / Dr.) / Common service
applicable) Industrial Load. certificate (Lift, staircase, water pump,
Identity Proof (Any one of the following)
etc.)
Voter’s Identification Card Photocopy of latest paid R-
infra energy bill (front & NOC from Directorate of Industries /
Aadhar Card MCGM permit for Industrial Load. (In case
back side) (for changeover
Passport application) of industrial consumer).

Photopass (Recognized Organization Written application on Latest paid bill copy


Photo Identity Card) society letter head with sign
Photo ID in Purchase / Sale Agreement and stamp (for society Documents for Contract Demand
Extention / Reduction
common services like Lifts,
Collector / Govt. Authorized Photo ID Application Processing charges
Staircase, Water Pump,
Driving License Etc.) Copy of latest electricity bill duly paid.

PAN Card

Applicable to Industrial Applications Only : NOC from Directorate of Industries / Municipal corporation Permit for Industrial load, if applicable
NOC from Pollution Control Board for Industry, if applicable
The Application processing charges would be payable as per Schedules of Charges.

Cash/Cheque/DD No. Bank Name : Amount : Rs.

(Rupees in words)
Payment details :
Security Deposite : Application Charges :

Mob. No.: Email ID :

Distribution Division, The Tata Power Company Limited, Dharavi Receiving Station, Near Shalimar Indl Estate, Matunga, Mumbai 400 019

To know the status of your application, please log on to https://cp.tatapower.com/ or call 1-800-209-5161 (Toll Free).

For more information, visit cp.tatapower.com or call 1-800-209-5161 (Toll Free) or email us at [email protected]

You can now apply for new connection online, please log on to https://cp.tatapower.com/

You might also like