Page 1 of 14Rev.02/2022
Classification: Internal
Tentatively on 21 Feb 23
crew will painted on crash rail .
Page 2 of 14Rev.02/2022
Classification: Internal
Page 3 of 14Rev.02/2022
Classification: Internal
8- Wheelhouse
11- Galley
Page 4 of 14Rev.02/2022
Classification: Internal
Chiller freezer
Page 5 of 14Rev.02/2022
Classification: Internal
Page 6 of 14Rev.02/2022
Classification: Internal
Page 7 of 14Rev.02/2022
Classification: Internal
Page 8 of 14Rev.02/2022
Classification: Internal
Page 9 of 14Rev.02/2022
Classification: Internal
Page 10 of 14Rev.02/2022
Classification: Internal
Fuel Consumption
- All main engines’ total daily fuel consumption can be
Yes, 2 main engines
recorded and taken from Engine Control Room
- All generators’ total daily fuel consumption can be
3 Yes, 2 AE
recorded and taken from Engine Control Room
- All main engines fuel flow meter available with latest
yes
calibration certificate (not more than 1 year)
- All generators fuel flow meter available with latest
yes
calibration certificate (not more than 1 year)
Fresh Water
- Capacity – Minimum 400 m3 918m3
- Tank cleaning certificate Completed Awaiting Cert.
- Fresh water flow meter with printed ticket and latest
yes
calibration certificate (not more than 1 year)
- Manifold connection 3" dia male camlock coupling Yes
4 - 2 x water flat cargo transfer hose with 3” dia x 40
meters assembly with male and female camlock On board has one unit
connection
- Jacket type hose floater provided for the transfer hose Yes
- Assorted cross-over connection for fresh water Yes
- Piping, connection, and manifold – blue colour coded
Yes
and marked
5 Fuel Oil
- Capacity – Minimum 400 m3 946 m3
- Fuel oil flow meter with printed ticket and latest
Yes
calibration certificate (not more than 1 year)
- Manifold connection 3” dia male camlock connection Midship is Camlock 3”, and stern for loading and discharging is
located at mid-ship and stern for loading/discharging TODO 3” and TODO 4”
- 2 x fuel flat cargo hose with 3” dia x 40 meters
assembly with TODO breakaway coupling with male Onboard has one set
and female camlock connection
- Jacket type hose floater provided for the transfer hose Yes
Page 11 of 14Rev.02/2022
Classification: Internal
Page 13 of 14Rev.02/2022
Classification: Internal
Reefer Socket
14 - Power connections and leads for freezer containers to yes
any point on deck @100 Amp x 415-450V x 50 cycles
– Minimum 6 sets
Fender and Gangway
- Appropriate fenders fitted for STS / port operations yes
15 - Gangway clear from loading manifold and hoses Yes
- Condition of gangway for access in port (specify
4mtrs / 8mtrs & 6 Mtrs Gangway
length of gangway)
Outside Accommodation N
16 - All stairways have anti-slip surface / pad for slip and
yes
fall prevention
- All fire dampers / flaps are easily operable and marked yes
Emergency Escape Hatch / Door
- Each hatch / door is clearly accessible and easily
yes
operatable by single person
17 - Routine maintenance in place and included in the
yes
vessel’s PMS
- Condition of each emergency escape hatch / door on
yes
main deck (provide inside and outside photo)
Page 14 of 14Rev.02/2022