Rmu Format

The document summarizes test results for a power transformer at the Al-Rashid Tower site. [1] Mechanical checks and visual inspections were performed and found no issues. [2] Electrical tests including continuity, insulation resistance before and after high potential (Hi-Pot) testing, and the Hi-Pot test itself were completed successfully. [3] Contact resistance tests between phases were within acceptable limits.

Uploaded by

sales.honestco
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views

Rmu Format

The document summarizes test results for a power transformer at the Al-Rashid Tower site. [1] Mechanical checks and visual inspections were performed and found no issues. [2] Electrical tests including continuity, insulation resistance before and after high potential (Hi-Pot) testing, and the Hi-Pot test itself were completed successfully. [3] Contact resistance tests between phases were within acceptable limits.

Uploaded by

sales.honestco
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

AL-RASHID TOWER

Site MV ELECTRICAL ROOM


Site Test Report Power Transformer-
NAMEPLATE DETAIL:

Manufactured by: Rated voltage:

1. MECHANICAL CHECK AND VISUAL INSPECTION

ITEM DESCRIPTION DONE REMARKS


1 Inspect for physical damage/defects (cracks, chips, etc., of the cast resin)  OK
4 Check that all groundings are securely connected.  OK
5 Perform all specific checks per manufacturer instructions.  OK
6 Perform Functional Check and Mechanical Interlock.  OK

2. ELECTRICAL TESTS.

ITEM DESCRIPTION DONE REMARKS


1 Check Continuity & Contact Resistance Test  OK
2 Insulation resistance Test (Before and After Hi pot)  OK
3 Hi Pot Test  OK

3. CONTACT RESISITANCE TEST:

Phase Resistance(µΩ) Remarks

L1 L2 L3

Bay1-Bay2 OK
Bay2-Bay3
OK
Bay3-Bay1
OK

Testing Engineer Contractor Consultant

Name: Name: Name:


Sign. Sign. Sign.

Date: Date: Date:


1
AL-RASHID TOWER

Site MV ELECTRICAL ROOM


Site Test Report Power Transformer-

4. INSULATION RESISTANCE:

i) Insulation Resistance Test

IR value
Applied points
Applied voltage Remarks
between
Before After

L1 & Earth 5kv OK

L2 & Earth 5kv OK

L3 & Earth 5kv OK

L1 & L2 5kv OK

L2 & L3 5kv OK

L3 & L1 5kv OK

ii) Hi-Pot TEST:

Phase Leakage
Applied Voltage(v) Time Duration Remarks
Current(mA)
L1 60 Sec OK

L2 60 Sec OK

L3 60 Sec OK

Testing Engineer Contractor Consultant

Name: Name: Name:


Sign. Sign. Sign.

Date: Date: Date: