HCIS-SECSAF Status - Updated 04dec23

This document provides the status of security package submissions for different stages of the RedSea project. It lists 5 areas/zones, with information on the submission date and status of packages for stages 1 through 4 of the security concept approval process. For most areas, the preliminary and detailed design packages were approved with comments and are currently undergoing revision under the oversight of the security controller. The operational readiness packages have not been submitted or approved yet.

Uploaded by

Siva Guru
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
102 views

HCIS-SECSAF Status - Updated 04dec23

This document provides the status of security package submissions for different stages of the RedSea project. It lists 5 areas/zones, with information on the submission date and status of packages for stages 1 through 4 of the security concept approval process. For most areas, the preliminary and detailed design packages were approved with comments and are currently undergoing revision under the oversight of the security controller. The operational readiness packages have not been submitted or approved yet.

Uploaded by

Siva Guru
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

REDSEA PROJECT - HCIS SEC PACKAGES SUBMISSION STATUS Issue Date: 15.

May-2022

Updated Date: 04-Dec-2023

SEC - Stage 1 SEC - Stage 2 SEC -Stage 3 SEC -Stage 4


S.No. AREA Submission Package Name ASSET TYPE ( Security Risk Assessment , Concept of Design , Security Polciy & Procedure) Preliminary Design Detailed Design Operational Readiness Package

TJN/HCIS HCIS/TJN Status Action By TJN/HCIS HCIS/TJN Status Action By TJN/HCIS HCIS/TJN Status Action By TJN/HCIS HCIS/TJN Status Action By

Rev.00 Rev.00 Rev.00 Rev.00


16.Jun.2022 Approved with
1 Zone-1 Desert Rock Desert Rock(STP5) STP5 12.Jan.2022 21.Mar.2022 Approved Closed 01/09/2022 Closed Under ITS revision TJN / Sec.Contr Not ready TJN / Sec.Contr
14-Aug-2022 comments
R13-013B01-MAR-CAA-LTR-0008 ACWA 2022/00185/S R13-013B01-MAR-CAA-LTR-0041 ACWA 2022/00226/S

Rev.00 Rev.00 Rev.00 Rev.00

20.Jun.2022 Approved with


2 Zone-16 Desert Rock Desert Rock(PV &BESS& ICE) PV / BESS / ICE 12.Jan.2022 12.Apr.2022 Approved Closed 11/09/2022 Closed Under ITS revision TJN / Sec.Contr Not ready TJN / Sec.Contr
14-Aug-2022 comments

R13-013B01-MAR-CAA-LTR-0007 ACWA 2022/00184/S R13-013B01-MAR-CAA-LTR-0048 ACWA 2022/00236/S

Rev.00 Rev.00 Rev.00 Rev.00


16.Jun.2022 Approved with Submitted to
3 Zone-2 Airport Airport(STP31 &SS-A, MDA) STP31 & SS-A 12.Jan.2022 20.Mar.2022 Approved Closed 19/09/2022 TJN / Sec.Contr Not ready TJN / Sec.Contr
14-Aug-2022 comments KDOCS

R13-013B01-MAR-CAA-LTR-0009 ACWA 2022/00194/S R13-013B01-MAR-CAA-LTR-0040 ACWA 2022/00225/S

Rev.00 Rev.00

20.Jun.2022 Approved with


4 Zone-5 Southern Dune Southern Dune(STP6) STP6 12.Jan.2022 19/01/2022 Approved Closed 01/09/2022 Closed Under ITS revision TJN / Sec.Contr Not ready TJN / Sec.Contr
14-Aug-2022 comments

R13-013B01-MAR-CAA-LTR-00011 ACWA 2022/00191/S R13-013B01-MAR-CAA-LTR-0047 ACWA 2022/00235/S

Rev.00 Rev.00
HCIS SAT
20.Jun.2022 Approved with Approved with
5 Zone-15 Southern Dune Southern Dune(PV &BESS& ICE) PV / BESS / ICE 12.Jan.2022 Approved Closed 01/09/2022 Closed Closed Inspection TJN / Sec.Contr
14-Aug-2022 comments comments
completed
R13-013B01-MAR-CAA-LTR-00010 ACWA 2022/00190/S R13-013B01-MAR-CAA-LTR-0046 ACWA 2022/00234/S

Rev.00 Rev.00

19-05-2022
PV / BESS /ICE / SS- 12.Jan.2022 14.Apr.2022 17/10/2022
6 Zone-8 SF2 Solar Farm 2 Approved Closed 14-Aug-2022 Approved Closed Under ITS revision TJN / Sec.Contr Not ready TJN / Sec.Contr
SF2

R13-013B01-MAR-CAA-LTR-00014 ACWA 2022/00189/S R13-013B01-MAR-CAA-LTR-0038 ACWA 2022/00250/S

Rev.00 Rev.00 Rev.00 Rev.00

19-05-2022
PV/BESS/ICE & STP 12.Jan.2022 20.Mar.2022 13/10/2022
7 Zone-9 SF1 Solar Farm 1 Approved Closed 14-Aug-2022 Approved Closed Under HCIS review HCIS Not ready TJN / Sec.Contr
/SS-SF1

R13-013B01-MAR-CAA-LTR-00012 ACWA 2022/00188/S R13-013B01-MAR-CAA-LTR-0037 ACWA 2022/00249/S

Rev.00

8 Zone-9 SF1 RO1 RO1 12.Jan.2022 14.Apr.2022 Approved Closed Submitted HCIS Under ITS revision TJN / Sec.Contr Not ready TJN / Sec.Contr

R13-013B01-MAR-CAA-LTR-00013 ACWA 2022/00187/S

Rev.00 Rev.00
16.Jun.2022 Approved with
9 Zone-4 Coastal Village Coastal Village (IWMF& STP4) IWMF &STP4 12.Jan.2022 13.Apr.2022 Approved Closed 30/08/2022 Closed Under ITS revision TJN / Sec.Contr Not ready TJN / Sec.Contr
14-Aug-2022 comments
R13-013B01-MAR-CAA-LTR-00018 ACWA 2022/00183/S R13-013B01-MAR-CAA-LTR-0042 ACWA 2022/00227/S

Rev.00 Rev.00
20.Jun.2022 Approved with
10 Zone-4 Coastal Village Coastal Village(BESS & DCP & SS-1) BESS& DCP & SS-1 12.Jan.2022 27.Mar.2022 Approved Closed 08/09/2022 Closed Under ITS revision TJN / Sec.Contr Not ready TJN / Sec.Contr
14-Aug-2022 comments

R13-013B01-MAR-CAA-LTR-00015 ACWA 2022/00195/S R13-013B01-MAR-CAA-LTR-0043 ACWA 2022/00231 / S

Rev.00 Rev.00

20.Jun.2022 Approved with


11 Zone-4 Coastal Village Coastal Village(DUCC) DUCC 12.Jan.2022 12.Apr.2022 Approved Closed 19/09/2022 Closed Under ITS revision TJN / Sec.Contr Not ready TJN / Sec.Contr
14-Aug-2022 comments

R13-013B01-MAR-CAA-LTR-00016 ACWA 2022/00182/S R13-013B01-MAR-CAA-LTR-0045 ACWA 2022/00232 / S

Rev.00 Rev.00 Rev.00

20.Jun.2022 Approved with Approved with


12 Zone-4 Coastal Village Coastal Village(CCC) Operating Office ( CCC ) 12.Jan.2022 08.Apr.2022 Approved Closed 19/09/2022 Closed Closed Not ready TJN / Sec.Contr
14-Aug-2022 comments comments

R13-013B01-MAR-CAA-LTR-00017 ACWA 2022/00181/S R13-013B01-MAR-CAA-LTR-0044 ACWA 2022/00233 / S

Rev.00
Will be submitted
13 Zone-4 Shurayrah Island Shura Island(DCP &SS 7-10 & ICE) DCP &SS 7-10 & ICE 12.Jan.2022 12.Apr.2022 Approved Closed Submitted HCIS after Stage 2 TJN / Sec.Contr Not ready TJN / Sec.Contr
approval
R13-013B01-MAR-CAA-LTR-00019 ACWA 2022/00186/S

Rev.00
Will be submitted
Ummahat Ready for
14 Zone-6 Ummahat Island(STP2 & RO3) STP2 & RO3 12.Jan.2022 20.Mar.2022 Approved Closed TJN / KDOCS after Stage 2 TJN / Sec.Contr Not ready TJN / Sec.Contr
AlShaykh Island Submission
approval
R13-013B01-MAR-CAA-LTR-00020 ACWA 2022/00192/S

Rev.00 Rev.00
Will be submitted
Ummahat Ready for
15 Zone-6 Ummahat Island(STP3 ) STP3 12.Jan.2022 10.May.2022 Approved Closed 20.Jun.2022 TJN / KDOCS after Stage 2 TJN / Sec.Contr Not ready TJN / Sec.Contr
AlShaykh Island Submission
approval
R13-013B01-MAR-CAA-LTR-00021 ACWA 2022/00193/S R13-013B01-MAR-CAA-LTR-0049

Rev.00
Will be submitted
Sheybarah South Sheybarah Island(PV , BESS ,ICE , STP 1 PV , BESS ,ICE , STP 1 Ready for
16 Zone-7 25.Apr.2022 Approved Closed TJN / KDOCS after Stage 2 TJN / Sec.Contr Not ready TJN / Sec.Contr
Island & RO2 ) & RO2 Submission
approval
R13-013B01-MAR-CAA-LTR-0036
Issue Date: 15.May-2022
REDSEA PROJECT - HCIS SAF PACKAGES SUBMISSION STATUS Updated Date: 04-Dec-2023

SAF Stage-1 SAF Stage-2


S.No. Zone AREA Submission Package Name ASSET TYPE FEED Preliminary Design Detailed Design
TJN/HCIS HCIS/TJN Status Action By Submitted Date TJN/HCIS HCIS/TJN Status Action By Submitted Date
Rev.00

31.Jan.2022 27.Apr.2022 Under Mx


1 Desert Rock Desert Rock(STP5) STP5 Approved Closed TJN / FP.Cont
preparation
R13-013B01-MAR-CAA-LTR-0023 ACWA 2022/00207/S

Rev.00
31.Jan.2022 27.Mar.2022 Approved with Rejected . Need
2 Desert Rock Desert Rock(PV &BESS& ICE) PV / BESS / ICE Closed MARAFIQ / TJN
Comments to resubmit
R13-013B01-MAR-CAA-LTR-0022 ACWA 2022/00209/S
Rev.00
31.Jan.2022 27.Mar.2022 Approved with Rejected . Need
3 Airport Airport(STP31 &SS-A & MDA) STP31 , SS-A & MDA Closed MARAFIQ / TJN
Comments to resubmit
R13-013B01-MAR-CAA-LTR-0024 ACWA 2022/00200/S
Rev.00
31.Jan.2022 24.Apr.2022 Under Mx
4 Southern Dune Southern Dune(STP6) STP6 Approved Closed TJN / FP.Cont
preparation
R13-013B01-MAR-CAA-LTR-0026 ACWA 2022/00201/S

Rev.00

31.Jan.2022 07.Jun.2022 Approved with Under HCIS


5 Southern Dunes Southern Dune(PV &BESS& ICE) PV / BESS / ICE Closed HCIS 2/Jan/23
Comments review
R13-013B01-MAR-CAA-LTR-0025 ACWA 2022/00202/S
Rev.00
31.Jan.2022 24.Apr.2022 Approved with Rejected . Need
6 SF2 Solar Farm 2 PV / BESS /ICE / SS-SF2 Closed TJN / FP.Cont 18/Oct/22
Comments to resubmit
R13-013B01-MAR-CAA-LTR-0028 ACWA 2022/00206/S
Rev.00
PV/BESS/ICE & STP /SS- 31.Jan.2022 24.Apr.2022 Approved with Under MAR
7 SF1 Solar Farm 1 Closed MAR 4/Dec/23
SF1 Comments review
R13-013B01-MAR-CAA-LTR-0027 ACWA 2022/00208/S

Rev.00

27.Feb.2022 Approved with


8 SF1 RO1 RO1 Closed Approved Closed 30/Jul/23
Comments
R13-013B01-MAR-CAA-LTR-0034 ACWA 2022/00214/S

Rev.00
22.Jun.2022 To be submitted
Rejected . Need to
9 Coastal Village Coastal Village IWMF & STP4 IWMF & STP4 14-08-2022 TJN/HCO after FEED TJN / FP.Cont
resubmit
approval
R13-013B01-MAR-CAA-LTR-0051

Rev.00
Coastal Village(BESS & DCP , SS- BESS & DCP , SS-1 & 31.Jan.2022 Approved with Rejected . Need MARAFIQ /
10 Coastal Village Closed 10/Aug/23
1&DUCC) DUCC Comments to resubmit HCIS
R13-013B01-MAR-CAA-LTR-0029 ACWA 2022/00199/S
Rev.00
30.Mar.2022 22.Jun.2022
Under Mx
11 Coastal Village Coastal Village(CCC) Operating Office ( CCC ) Approved Closed TJN / FP.Cont
preparation
R13-013B01-MAR-CAA-LTR-0035 ACWA 2022/00216/S

Rev.00
Shura Island(DCP &SS 7-10 & 31.Jan.2022 28.Apr.2022 Approved with Under MAR
12 Shurayrah Island DCP &SS 7-10 & ICE Closed MAR 3/Dec/23
ICE) Comments review
R13-013B01-MAR-CAA-LTR-0031 ACWA 2022/00198/S

Rev.00
To be submitted
Ummahat AlShaykh ReSubmitted
13 Ummahat Island(STP2 & RO3) STP2 & RO3 MAR/HCIS 10/Aug/23 after FEED TJN / FP.Cont
Island (Under HCIS review)
approval

Rev.00
Ummahat AlShaykh Approved with
14 Ummahat Island(STP3 ) STP3 Closed In progress TJN / FP.Cont
Island Comments

Rev.00

Sheybarah Island(PV ,BESS , ICE , PV ,BESS , ICE , STP1 & Rejected . Need
15 Sheybarah South Island Approved Closed TJN / FP.Cont
STP1 & RO2 ) RO2 to resubmit
REDSEA PROJECT - HCIS SEC/SAF SUBMISSION STATUS Issue Date: 15.May-2022
Summary Sheet Updated Date: 04-Dec-2023

To be
Approved with Under Review
Description Total Package # Submitted Package Approved Rejected Submitted
Comments ( By HCIS)
(By Tiejun)
HCIS SEC Stage 1 Status 17 17 5 12 0 0

SEC HCIS SEC Stage 2 Status 16 16 2 9 2 3

HCIS SEC Stage 3 Status 16 3 0 2 1 13

HCIS SAF FEED Status (Stage1 18 18 4 10 1 1 1


SAF
HCIS SAF DD Status (Stage2) 15 8 1 7 3 11

Total 82 62 12 33 8 7 28