0% found this document useful (0 votes)
25 views

Time and Work Premium Class With Anno

Uploaded by

Aman Pathak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
25 views

Time and Work Premium Class With Anno

Uploaded by

Aman Pathak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 69
Time and Work - Premium Class Revolution 2023 : Complete Course of Quant for All Bank Exams 2023 Aashish Arora + Lesson 4 SMC a TRU RCC m OC Bacal A and B can complete a piece of work in 35 days and 45 days respectively. If they work together then in how many days can they finish the work? A site B Ua ore ot barel: 35 feat site 45 cS ewes elses wed e cl a la wi febciat feoil A eI we ea e? A. 17(13/16) days B. 19(11/16) days Cc. 21(7/16) days D. 23(5/16) days E. None of these rr SCM a TRU RCC mC OE Bacal If P can do a piece of work in 28 days whereas P and Q together can complete the same work in 14 days, then find the time taken by Q alone to finish the work? afe p ves ore wt 28 fail a yer we Apel 2 rales P site Q fatesepe Saft ore wt 14 feat Aree iG ecicei nel men atresia . 21days . 42days . 28 days . 35 days None of these are MoOODD T Cee ke ecco ara al X, Y and Z can do a piece of work in 15 days, 18 days and 24 days respectively. In approximately how many days will they complete the same work together? X,Y afte z Ue ore wl wael: 15 feat, en O22 a weed art Bar wen Brel esoTaTaT fevered feait A Yer eT? . Idays 8days . Sdays . 6days None of these aur MOOD SMC aT Ut RCC mC OC Bal P can do a piece of work in 25 days and Q can complete the same work in 30 days. If they work together for 9 days, then what fraction of the work is left? PUq Die hi 25 fait A He aepal € site Q Tell wre Ht 30 faci a Ye He Awa el afed 9 fait & fae ves ae wrat wed &, A ra ar fescton feeent Ta 2? . 9/25 . 26/75 . 17/50 . 39/100 None of these Cure MoOQODD Lie hie Rocca cl A,B and C can complete a work in ‘8x’ days, ‘6x’ days and ‘5x’ days respectively. In how many day they can complete the work together? A, B site c ten pref col spare: ‘8x’ felt, ‘6x’ facil site '5x' fail A Yer we aed 21a eS are wre wt fesaet feat A Yer we Aenea EP . 120/59 days . 150/69 days . 180/79 days . 210/89 days None of these rs MOODD bi Pea RN CRO l Bacal A and B together can do a work in 20 days, A alone can do the same work in 30 days, in how many days B alone can complete 3/5'" of the work? A3ie B fatescne Ue corel cht 20 fect A He aaa ze, A eS Tet wre HI 30 eat we Aba e, B Hees corel Hr 3/5 aT festa feet A Yel he Aaa e? . 32days 36 days - 40 days . 45 days None of these rs moOOmD TCM ee Ril YRC moi Bacal P can complete 40% of work in 12 days, Q can complete 30% of work in 6 days. In how many days they can do 60% of work together? P12 fecit Ht 40% eee ae Q6 facil a 30% wre Yel we awe ga eH are 60% wore fesctet werd e? . 7.2days . 9.6 days . 12days . 14.4 days None of these rsa MOOD TCM ae Riel: RC Oil Eas Acan complete 80% of the work in 32 days, B can complete 75% of work in 18 days, C can complete 72% of work in 27 days and D can complete 60% work in 33 days. Which one of them is the least efficient? A 80% wre cht 32 feel A Yel whe Hee z, B 75% cre G1 18 feat A Yer whe apa e, C 72% wre Hi 27 feat A Yet He Aas 33 feel A cow wre Wel we aaa el Jaa ate an ara eres 8 . = A.A B. B cc D. D E. N jone of these ars LiL he aA oC eacat cil Time taken by P alone to do the work is 9 hours more than that taken by Q alone. If both of them together can finish the work in 20 hours then find the time taken by P alone to do 60% of the work. P Gel sebes Gre cheat A fesAl WA AAA, Q Fel Hehe cre wl eat H fse Te Aaa Ag ve after 21 ale ag cto fatesene wre HI 20 ve A Aaa He Aaa € a P Gel AHA 60% Hie seat H fse WM Aaa se Hiferel . 24 hours . 27 hours - 30 hours . 36 hours None of these rsa mMoOOmD SCM a TRU RCC mO CE Beats Working together P and Q will complete a work in ‘xy’ days. If Q alone completes the the work in ‘y’ days. How long will P alone take to complete the work? afte Umea wre weet A tes HT ‘xy’ feait ae Wess Bra Bt y Pata agi asa Sip MAS Ove wh yor eA ase eee ? il yi ne . x/(I-y) days . xy/(I-x) days None of these QasaD MoOODD Me RC RE AGC P work 3/8' of the work in 12 days. The Q joined him and they together finish the remaining work in 5 days. Find the time taken by Q alone to finish the complete work? P12 fect A ores wr 3/8 aor wre Heal Vl Q Jae Ae eltfates ITA sie a Usp areal a ee ee aan eee ee aes Stes One ee aia 2 - 10(2/3) days : ems . 13(3/4) days . 14(1/2) days None of these Qua MoOODD by PR RN CaO Brae cl P and Q together can complete a work in 20 days, Q and R together can complete the same work in 30 days, and P and R together can complete the same work in 24 days. Find the time taken by Q alone to finish the work? P aitz Q fatesene ten corel wt 20 feail A yer ce area &, Q site R fates Saft wore wT ao fast aigeecaed aha p she e Roress sal wrest 20 ead a gl wsr eset wrat Hl Ul Heat A Q qrer fesar sen erate strat chiferate . 40 days 45 days - 48 days . 50 days None of these rsa moOOmD by Pea RN eC mci Eras X and Y can do a work in 28 days and 21 days respectively. They begin working together but X leaves after 4 days. Now Y completes the remaining work. Find the total number of days needed to complete the work? x aie y ven corel wl mater: 28 feat site 21 feat A we Bea Bia Ue ael HrA Heat ae Hea # faba x 4 fail & ale Hla Bis Sar zl 3a Y AT HLS HI Yel Heal el Heel Upl Heat & foe sraeas feo ht po den ara Hide . 15 days . 18 days . 21idays . 24days None of these Casas MoOODD SMC a TRU RCO a OC Earl P and Qcan doa piece of work in 36 days and 45 days respectively. They begin working together but P left after some days and Q finish the remaining work in 18 days. Find P left after how many days. P3ie qua mre a marel: 36 feail site 45 fea A we ema 1 a Ue ae HT Heal 2[s Hed ¢ Atel P Hw feel & ale Hra Bis Ac e site Q AN Hra cH 18 feel A Yet thee al P fesctat fait a are Test Trea? A. 8days B. 10days Cc. 12days D. 15days E. None of these Cra SCM a RUC RCC mo Bal Two person can build a wall in 12 hours and 16 hours but if they work together they use 75 less bricks per hour and build a wall in 8 hours. Find the number of bricks in the wall? Sranfes 12 82 site 16 de A Ue dare aon awa 2 fever ale a ve ael HTa Hea Fat Aufe He 75 Hat Sel Hl TTA Hea é sie 8 ue Bl Us clare aera el dare a sel St area stra ehifora? . 2400 bricks . 3000 bricks - 3600 bricks . 4800 bricks None of these Qusy moomUp SCM a RUC RCC mo Bal Two candles of the same height burns completely in 6 hours and 8 hours. If they start burning at the same rate at their respective constant speed, then find after how much time ratio of their heights become 3:4. Pe Ae Tee ol cisterns Meena ae a vies onielt Zi ale a seat aaftla fete wfa A aarret ae A ceva aT &, all site Sifora fas fescret Hera & are sacht HUSA oor srqpTTa 3: 4 SAAT el : 2taln) hours . 3(3/7) hours . 4(2/7) hours . 5(1/7) hours None of these Casa MoOODD SCM a RUC RCC mo Bal P, Qand R can doa piece of work in 15 days, 18 days and 24 days respectively. P work for only ‘x’ days, Q work for only ‘x+1’ days and R work for ‘x+3’ only days. If they complete the whole work, then find ‘x’? P, Qe RUS wre al marel: 15 fear, ee oe x! feat & foe wrt Hellz, Q aes 'x +1 fail eB eee Ne x+3' als fou wre meen tafe 2 yer ard gt wed e, atx Ta A. 2days B. 3days Cc. 4days D. Sdays E. None of these rss CO eR RCM Oil Bae cl Aand B can complete a piece of work in 20 days and 30 days respectively. They work together and after a certain time A left the work then total work is completed in 15 days then find after how many days A left the work? Asie B Um wre wl warel: 20 feail site 30 fea A Yel we Aaa 218 UH el wre wed t ae Ue feta Aaa & ale A Hr Blsche Tes ila e at Hes re 15 feat A Ue et ora 2 at stra Hira fe a faseret feail & are corel wigene Sra? . 8days . Idays . 10days . 12days None of these Casa mMoOQOmD LiL hi eR occa cl Aman and Riya can finish a work in 15 days and 20 days respectively. They started working together and Aman quits after 2 days. After 3 more days Aman is called back for the work. After one more day Riya quits the work and remaining work is done by Aman. What is the ratio of work done by Aman and Riya? stare site Rar ven wre HI wHaeI: 15 fail site 20 feat A yet He awa Bi eel Ve Bel Dra Teall ee che fea site stata at 2 feel ale chrei Big fea 3 site feat Ole Sarat Hl Ha & fe ara Foo viral EI Ue site feat & are fea ara wis echt & pelle dill satel site fen qrer fase sre epee wr sreqara eM A. 7:3 B. 4:1 Cc. 9:4 D. 5:2 E. None of these Qassay i work and Re Raa eara Cal A and B together can complete a piece of work in 10 days. They started working together but A left after X days and B finished the remaining work in next ‘3X/4' days. Had A left after 3X/4 days, then the time taken by B to complete the remaining work would be ‘3X/2’ days. Find the ratio of efficiencies of A and B? A 3ite B fatesene Uap corel ant 10 feait at Yet coe Arend El Soglat Ue Ae ra eek eps fren Afra a a x facil & are cera Big fear site B at Ate Gra TCS '3x/ 4" fail A Yer we fami ate a 3x/4 feel & ala Bigar @, at ate ore HI Yel eal F B gler fsa sat Bare '3x/2' fear BT A site B cht efaten HT sfeyUTA SAT 2 2:1 3:4 5:6 8:9 None of these QZ mOODD SCC a TRU RCO mC OE Ea cl P and Q together can complete a piece of work in 9.6 days. If P alone completed half the work and then Q alone completed the remaining half of the work, then the total time taken by them is 20 days. If P is more efficient than Q, how much time will Q alone take to complete the work? p site q Um are Ue corel wt 9.6 fail: Aes een eae fesan site fee Q at steed ate sid Bret Rene a sae gel fe asa ere Qa aifde pers? atQ wore et Yel cheat Ht ferctonl arr . 16 days . 20 days . 24days . 30 days None of these QIrsea mMoOODD SCM a TRU ROR OC Bae cl Time taken by P to do a work is 16 days more than that time taken by P andQ together and time taken by Q to do the work is 9 days more than that time taken by P and Q together. Find the time taken by Q alone to do the work. P glel es corel wel cheot A fsa Tre Bara, P a Q Flel UHenel wre wt Heat A fs Te are Ht Fever H 16 fear sifelen 2 ae Q Fler wre Ht Heat A far TAM Asa, PAQ gel vparel wre wl peat A fede ae arate cht qesert A 9 fear sifeles 81 Q Glel sess wort meet & far aren aera ara thera . 20 days . 21days . 24days . 25 days None of these Qa MOODD SCM a TRU RUA OC Bae cl ‘ime taken by A to do a work is 12x days more than that time taken by A and B together and time taken by B to do the work is 3x days more than that time taken by A and B together. Find the time taken by B alone to do the work? Agr Us ore wl Heat A fsa IN Aaa, AaB glel UHpanel Brel wl Heat A fese Te Uae ‘Bl Heol A fsa WM AAA, ATB wea A foe we Aad cht goon H 3x fat sifles 21 B GLE AS Sa Darra rae . 6x days . 8x days . 9x days . 12x days None of these | Ques. 23 | MOQODD SCM aT Ut RCC mo Brae cl Qcan complete a work in 11 more days than P while P does the same work in 25 more days than R. If P and Q together can complete the whole work in same time in which R alone completes the work. In how many days P alone completes the work? gona STS Hae SalLeeT oO RS 2c fae seeee glafe p ate ep woh seh aa geo ed & forerat R cigs ttn ghost gl a oma Yel pean 8? . 40 days 45 days - 50days . 55 days None of these CQreezy MOOD LiL hee Rocca cl P and Q can complete a piece of work in 25 days and 15 days respectively. P begins working and they work on alternate days one at a time. The whole work will be completed in how many days? P site Q Ua core at patel: 25 feeil site 15 feait at Yet be Aca El P TA weal é sie a Ua-Ue Hes weal eI Sestetin Bat eve ea Hye ard aa ak Se stares? A. 17 days B. 19days Cc. 21days D. 23days E. None of these oC ee Re RCM Oil Bae cil Aalone can complete a work on 25 days, B alone in 30 days and C alone in15 days. A started working and assisted by only B on first day, by C on second day, again by B on third days and so on. Find the time taken to complete the work? oes eee pode 8 BeCIO RM On eee ntLAR er cosas fever she wees fee sracsw art aeraar MIA feat dacs c grel, foe dha fect bac B gre site seft azel ref wet Yet Heat ‘ares aera sta cBtfotale . 11.25 days . 12.50 days . 13.75 days . 14.00 days None of these QE MOOD De he RCC ACO I crcl When working alone P, Qand R can compete a piece of work in 20 days, 24 days and 30 days respectively. At the most only two person can work on each day and nobody work for more than two consecutive days. What is the minimum number of days that they will take to finish the work? Hees Bia Hed AA P, Q ste R Ves Ia Hi Heel: 20 fear, 24 feat site 30 feat aA Wel me Aone Zl sifdles a siftles chacs at cated wedes feat are che acne € site wis aft woaTTale ah feat B siftlen ora oral Heat 21 corel eat Yer eet A Soe axforcrat feserat feat . 10 days . 12days . 1S days . 16 days None of these Gaz MoOQODD Li hee RA occa cl Acan build a wall in 40 days and B can demolish the same wall in 50 days. If they work alternate days with A start working on first day, then in how many days will the wall be built for the first time? Ava dare wt 40 feel f aon tee 2 site B seft clare wt 50 feail Ht eaea He apa ee eae eee ee ee eee ataect are dar fact feet & sens orestte A. 323 days B. 356 days Cc. 391days D. 400 days E. None of these Careers SCM a RUC RCC mo Bal P can paint a wall blue in 15 hours and Q can whitewash the wall completely in 20 hours. If P and Q work for alternate hours starting from P. How many hours it will take to completely paint the wall Blue? P Um clare wt 15 te A often eal Hepa é site Q 20 tie A dtare wt Ut ae A ata HE wera Brae p ate 9, Pal ope Ba a Wel fae are hea el ctare wt Gt cee a oe eat ae oatst> . 113 days . 125 days . 137 days . 149 days None of these rs) MOOD ime, work and wages/ Hata, Bret Bal Amonkey climbs a tree 65 meters tall. The monkey climbs 5 meters in 15 minutes and in next 15 minutes slips 3 meters. In how much time the monkey will reach the top of tree? Ue daz 65 ofice Hu Us Ue Ue oe el dae 15 fetote H 5 alee Use sike S191 15 fatete A 3 afte ftsates ore Bl dae Og cht uel We fede aera A age? A. 12.50 hours B. 15.25 hours C. 13.00 hours D. 16.75 hours E. None of these | Ques. 30 | SCM a RUC RCC mo Bal Starting from P, P and Q work on alternate days and the work gets completed in 27(1/2) days. If P alone can finish the work in 32 days, then find the time taken by Q alone to finish the work? ad plead alll ed ot elles lac al feat lal ale P 3fcbed BIA chl 32 feat A Yel he Aca e, Al Q glel Sched Hla cht Yel heat F WaT aaa SATA 1 A. 18 days B. 24days Cc. 27days D. 32days E. None of these QISskn LiL hi a occa cl P can complete a work in 15 days. If Q is 25% more efficient than P, then in how many days Q can complete the same work? Pup are ats feel A yet we Aaa 21 ale Q, PA2S% afd Heres z, at Q sat core cot facet feait af yet coe arena 2? . 12days . 16 days . 18 days . 20 days None of these Qs MOOD i Cee ke eae ara Cal Acan finish a work in ‘8x’ days and he is 25% more efficient than B. in how many days A and B together can finish 90% of the work? ave wre at sx feail a yer me aepal é site ae BA 25% sifdles Heres 2] A site B ior sore tor et feel feed gpl ee mee aed 8? 7 A. 3x days B. 4xdays Cc. 5x days D. 6x days E. None of these Crk SCM a RUC RCC mo Bal P alone can work 6/7 as fast as Q and R together. P and Q together can work 10/3 as fast as R. If all three of them work together can complete a work in 9(3/13), then in how many days P will be complete the same work ? P Heo Q BER H 6/7 AH A HA He Aca el P Bile Q UH Met R cht Govan A 10/3 Pet ares wre Fina ole) eieeea ee eres) meee P3eft ref mt fara fait a yer mest? . 15 days . 18 days . 20 days . 24 days None of these akg MOQODD i work and Ae Race oc ara Cal Aman has three daughters. The man can do twice the work of his three daughters. The first and the third daughter can do the work in 20 days and 30 days respectively. The man completes the same work in 24/5 days. Then find the time taken by second daughter to complete the work? Ue seat ht tet afeai ei staat siceft ta feat a ayer Hla He Awa BI TEs site dterdt act ore cat watel: 20 fart site 30 feen A we cect 21 staat Saft pra Ht pe ee ee ee eee een . 25 days . 32days . 36 days . 48 days None of these | Ques. 35 | MoOODD bi work and Re Raa oc ara al Ais 20% more efficient than B who is 25% more efficient than C. If A at his 75% efficiency can complete a work in 10 days, then in how many days will they together can complete the work? A, B ct qesenl H 20% sifle Heres evil c cht Gesell A 25% sifdles Heres sale a weft 75% aera Te Uap corel wt 10 feat A Yet che cepa 2, ait a fatesene ref at fescret foil A yer wee crepe EP A. 2days B. 3days Cc. 4days D. Sdays E. None of these QaSks SCC a TRU RCC aC OC Earl Aman works 25% as fast as a women. A women works twice as fast as a child. If 16 men can complete a work in 20 days, then in how many days 10 women and 20 children together can complete the same work? Wee Yee Aeon cht Gesell H 25% deft A Ha Hel el Usp Hfees Uap Tea cht Goro ei god orale a6 yon em ol 20 fal ge meme a0 U site 20 aed fatoscne Saft corel cht fesctet fail A Yer we eran EP . 20 days . 24days . 25 days . 30 days None of these Qa MoOODD i work and Re cacao cara al 3 men and 5 women together can complete a work in 4 days. 6 women and 3 children together can complete the same work in 5 days. 2 men, 2 women and 2 children can complete the same work in 6 days. Find the time taken by 4 men and 2 children to complete the same work? aes a il cay lige ce al fatesene sett rat a1 5 feat at YeI He aed FI 2 site a dg ae Boat lye ala go see ger TM Hara iret . 2days 3days . 4days . Sdays None of these | Ques. 38 | moOOmD SCM a TRU RCC mC OG Bae cl P is 25% less efficient than Q. P started the work and then after (x+5) days is replaced by Q who completed the remaining work in ‘x’ days. Ratio of work done by P and Qis 4:5. Approximately in how many days P and Q working together can complete the work? QA 25% WA Heres el P aA are ope feven site fhe (x+5) fail a ara rc eoniaet ett Fe Set at feat Eine aetineart ore or eet ee fo fect : Zoe days . 66(1/6) days . 77(1/7) days . 81(1/8) days None of these QaSsky MoOODD LiL hee RR Ceara cil 40 people can complete a work in 25 days. They start working and 15 people left the work after ‘x’ days. If the whole work is completed in 34 days, then what is the value of ‘x’? 40 cites Ue pre wi 25 feat A Yel be Aca Ela SIA Heol ope ced e site 15 GPT pee ame AS CUR pS ae a Ane eee ee are eT A. 10 days B. 12days Cc. 15 days D. 20 days E. None of these SCM an Rt RCO a OG Ey There is sufficient food fi how many days will the rest 32 feel far co os Fes iri 82 eas re 20 Sei archt Gaul & fete ele aitetat fesaet feait aes aes? e xa a A. 10 days B. 12days Cc. 15 days D. 16 days E. None of these | Ques. 41 | SCM a TRU RUA OC Bae cl There is sufficient grains for eee day 75 days and each one takes 900 gm grains ma it after 55 da 0 people leave the place and now each person takd grain every For how many days will the rest of the food last for re) étage people? 75 FRY eZ Se oe TEL ec OUST LeU Fa We ene TE oh Se a faa SH aa Ta aT aN & fae ete aitera fectat fea aes TAIT? (Qvox1Q0x15) — (Arex 10x 55 . 18 days 24 days 27 dys . 30 days None of these QIEZy mOOmD Te Guhl eC ACO cart} 18 men working 15 hours a day for'20 Hays can completé of the wo! women working 9 hours a day for 24 days can complete 60% of the work. ~ What is the ratio between the efficiency of a men and a women? 18 You 20 feail & fore wider 15 te wre wed EU 75% Hie ht Yel he aeba £125 Sere ES Oe care meeneey eaene Y site ait oot caren & dhe apr separa FATS? a / MBH ——> tous Midiw - MDH We OSS JZ B ee Mx a0 x45" A fess s =e ; ee aa 4 praia “T4 ES settee SMC a TRU RCC mC OC Bl Prateek and Rahul can complete a piece of work i (30) jaysarR(24)days respectively. They contracted to complete the work for R: ind the amount earned by Prateek? ‘aay a4 dies site ages Uap corel aot ater: 30 feait site 24 feait a Yel we Aeoe El Soelet 4500 BUa H Gra Yel heal c& fede seqaer foam wtp grat sifeta erfel sta cifrada? . 1800 R: 2oooke . 2500Rs . 2700Rs None of these MOOD SCM aT RU RCC aC Bal Aalone can complete a work ii (40) days, B alone i Hays, C alone i “60 7 days. They undertake a contract to c: lete a worl four Rs sz 200: With the help of D they completed the work i jays. Find th it received by D? ae V2 y goatee comet est ieee cranes 1412500 Un wr wo eer ip st aerran Peat Seer recto A 4o ise (2 Ee ¢ & co A. 2500Rs Be D. 3750R: Ie E. jaan ay | Ques. 45 | neki Csi occa cl The question consists of two statements numbered “I and II” given below it. You have to decide whether the data provided in the statements are sufficient to answer the question. fatsafedfata usa & at aperet 1 site u feu sre glaimaent ae cal chee & feb caeret AH AL ars crrorepTal ys oI sete BA fee vata é a1 adiiaelt wera ant ue site sete a] 8 Pand Q together can complete a piece of wolk jnriStalys. Find the ratio of efficiencies & |. They started working together but P left after [5X/4) days and Q finished the remaining work in next "x’ days. 71 rking together but Q left offer sx/a"dayland P finished the remaining work in next 3x’ days, — site g fate ve ori ats feel a ea ei P sitz Q cht arava coifta? |e wee oro went sea nar x ol ee we Oe he gO OT we mm ‘Wes lel wat eaeaT eps woe fear Seat Qat'3x/a" feat a yer ane fesam A. Only lis sufficient ' B. Only Ilis sufficient © Both! and il together are necessary D. Either of them is sufficient E. Neither of themis sufficient ke Acacia cl The question consists of two statements numbered “Iand It” given below it. You have to decide whether the data provided in the statements are sufficient to answer the question. fetscifedtata wea a at ameret 1 site ui feu ae else ae tal con & fos aperet A At a1s crores west wT see BAT feu vata é a1 adiizelt aera at ue site sete a] A, B, Cand D undertake a contract to complete a work for Rs 5100. Find the amount earned by C? |. and B together can complete the same work in 30 days. Total time taken by them to complete the rk is 18 days. < Stic between the efficiencies of A and Bis 4:5, and that of A and Dis 8:7, and that of ¢ and Dis 9:7. een ABs cae DESERT TSH Ee BLE] dered Bi c Grer sifeta afel ara cifrada? abe a eae eee ‘Wel he eee €. corel wet er eat A Sores Grer fsa sre Ges Bara 18 feat 1 UL A site B Et ererersit & ata oor sequal 4: 5 @, site a site D ar staquTa 8: 7%, site c site D wT saa 9: 721 A. Only lis sufficient B. Only Ilis suffi C. Both I and Il together are necessary D. Either of them is sufficient E. Neither of themis sufficient rz Tachi Casi occa Cl In the question, two Quantities | and Il are given. You have to solve both the Quantity to establish the correct relation between Quantity-1 and Quantity-Il and choose the correct option. wear a, at arrare 1 site u at o1s 1 seret aara-1 site atraT-it @ aha eret eieiel eet ect & fede cheat ararsit wt Fe wees ae fase wr Tae Bee eh Quantity-I: If X can do a piece of work in 6 days whereas X and Y together can complete the same work in 3(3/7) days, then find the time taken by Y alone to finish the work? Quantity-1I: P can complete a work in 18 days and Q can complete the same work in 24 days. If Qis 25% more efficient than R, then in how many days they together can complete the work? wrar-1: afe x ve wore at 6 fait A yee apa 2 rales x site v fee seft Ore wi 3(3/7) Rol Aga He awa ay gaara yi wed a. fea Te Bara aire eatfere? ‘FTAI-Ui: P Wen ware cot 18 feait A Yel ee eevee site Q Tet wre wr 24 eal a yer we Bear 21 ale Q, RAZS% sifttes Heres &, ata fatesane corel oot feerat fail a yer aoe Hepa BP A. Quantity-1 > Quantity-1! B. Quantity-1 < Quantity-I C. Quantity-I < Quantity- D. Quantity-1 2 Quantity-I E. Quantity-1= Quantity-II or No Relation i Ques. 48 | Tek Cascio ical Cl In the question, two Quantities | and Il are given. You have to solve both the Quantity to establish the eoeeets satin ogee vl SEs aa etna oe Corea wea a, a ea site arate dha eet eae anita weet & fose ate ararsil wt J a omar ‘weer el Quaritity-I: 64 people can complete a work in 45 days. They start working and 24 people left the work after ‘x’ days. if the whole work is completed in 57 days, then what is the value of ‘x’? ‘Quantity-II: There is sufficient food for ‘x’ people for 40 days. After 16 days “x/4’ men left. For how many days will the rest of the food last for rest of the men? Er as eee ieee x feat & are wre vi coeoT ewe tx! GBT TST ET BP feait as fee vata aitorar 21 16 featt & are x/4' sireaft Ts Tel ATA YoU & fe are A. Quantity-1 > Quantity! B. Quantity-1 < Quantity-1I C. Quantity-I < Quantity- D. Quantity-12 Quantity-I1 E. Quantity-1= Quantity-II or No Relation CQrezy TO Leu kite Cacia Cl Which of the pairs of the followings values can satisfy the blanks in the following question. fatsatatad are a a wre at Sees St wl AGS we Adal e? Palone can complete a workin _ days. Pean complete a work inners days the Rlwhile Qdoes the same work in _ more days than R. fcc aero plete the whole work in same time in which R alone completes the work. TE. Psd UH wre ot pases at yp we Heal ¢ Hates Q set Bret Ease _ag et Agerar art steam ye ard sahara Gear ea ate IS Te Wea ely, (F cae Peg) = (RD) . Tine liesaat — A. 30, 24,18°- G) 36, 16,25 C. 24,16, 12 D. 40, 30,20 E. None of these OE Per cea o Ge ea cal Which of the pairs of followings values can satisfy the blanks in the following question. ‘ra sistant ira ebaerfsfeia wear i ee ear oot Cl qh whe Aca 8? Ratio between the efficiencies of P, Qand Ris _. If time taken by Qalone to complete the workis _ days, then the time taken by and gene to. complete the work is _ days. eS site Rcht ererensit & dta ar srequra _ _ gi afe sas ‘core pt yer eet H fesen ren ear __ e yap ahem grey arel al yor eer at ‘Babes fede TT aaa “gal ie 3) ea s, 12 days None of these TO chee Cascio cael Cl Which of the pairs of the followings values can satisfy the blanks in the following question. (ea Water oe eee aes ere wl aqe we Aaa e? Two candles of the same height burns completely in 16 hours and 24 hours. If they start burning at the same rate at their respective constant speed, then after _ hours ratio of their heights becomes _ oa ead ee aos gh eA A 8 wa Aaa cea asa Hag, Ht _ els ae Torch Sasa oI key __ eA! A. Ghours) 910%, ® 3) ln squmeg = © &) Gre Oui A. OnlyA WS-Ie =36 y-IQz a = te eg ee E. None of these = | Ques. 52 | Pen RNC RCAC OE Barca Which of the pars; a thet folewsn is values can ary the blanks in the following question. fasafataa arent a fees eeret Hl qe we Awan e? Aman and Bhanu can complete a piece of work in 28 days and 35 days respecti work together and after _days Bhanu left the work then total work is complet. a satel site arrey Cen worel wat arer: 2.20 fell she 35 feat get ea Suara srakcice faedearg an aar otg tan aoe feat a yeret orev 21 Gses “Ta BP Anys (J a! to pays, 20 Days fe as dnys (47 —— B.1 15 Days, 16 Days only A T ey eq 5 Days , 24 Days A. B. OnlyB oe Cc. BothAandc D. Allofthess- E. None of these CIE Men RNC RCAC OE Barca A, Band C undertake a contract of completing a piece of work for Rs 18000. a aa Za A wr SHIT 4:5:3 31 ate a 45:48: 40 3 Sore 18: 212:10 4 eae ae Fler wie efel & ata cor siae ara Sifra Time 45°: 48: 40 Tine. Is pte slo ac raf ¥ . . : : . 3 64 4: 553 A. 600Rs ef Aa z B. 750R - ween Cae 180 3 240 7 120 D. 900Rs Gifsia) E. None of these ‘e SCM a RN RCAC OCS Barca A,B and C alone can complete a work in 4a’ days, ‘a-8’ days and ‘40’ days respectively. If they work together ther 92%ot the work will be completed in 7.2 days. Find the time taken by A and B together to complete the work? A, B site C Heo Ue wre ol HaeI: ‘a’ feail, ‘a-8' feait site '40' feat A Yer He apa Zl ale a wen ener ara wea 2 at 93% wera 7.2 feat A oer al TCT aera a YET we aA site B gel Ue arel fesar Te aara stra Stata? ArBtC = Tao. 93 db en & Se ( "3 ) Bp N= 1a G 40 '8 93 We Ta rs OR hs oo) AAG day: . 10.2. days ay =» 46 ne G22) . 12.5 P za ee 1g s None of these =a) moon PO cu kets Cascio caer Cl “x men and ‘2x’ women together can complete a work in 15 days by working 8 hours a day. If men and ‘0.5x’ women together can complete the same work in 24 days by working 13 hours a day, then find the ratio of efficiencies of amen and a women? aite'2x' ees STAY Es (0e1 8 Ne cele cee ne IPAS LEN aie af '0.6x' Feu site '0.5x' afer’ tes ettel Seft corel et 13 He wheter corel ee Siqgear sy agen at I HEMT CN + 2ynl) sx = SM + aN ra A. 3:2 ae (40) 9p Gye a a oe of these Mr W) ao y* _ PO acu kite: Ge kai cake Cl P is 33.33% more efficient than Q. Ratio betweenthe time taken by P and Q together tocemplete a work to time taken b¥R and Stogether to complete the work i€15:]4)Ratiow of time taken by R alone to S alone to complete the same work i¢ 1:2)If S alone can complete the work i am ore days than Q, then find time taken by Rand R together to complete the work? eH P, Q&A Aaa A 33.33% sles Hers 21 P site Q Frei UH Mea UH wre wi Yel Sea A fese sre aera site R site s grat ore owt Yer Heat a de We aera & eta cor soya 15:14 213s orf Yel Heal & fae Rglel s Hi Se We Aaa HT HTT 1:2 21 CIS FRCS IE AGRIC CGI EE Se ea A Ree an trl Pe a a days 7 atl c. 7(1/2) di Fae D. ae @ © E. None of these Qa Bs [:€ O-&D a sy kk PDO TO eu kere kai cake Cl Jyoti is 50% more efficient than Rahul. Jyoti started the work and then after (a+8) days is replaced by Rahul who completed the remaining work in ‘a+4’ days. Ratio of work done by Jyoti and Rahul is 15:8. Approximately in how many days Jyoti and Rahul working together can complete the work? waite erges ft ago oi ce tag fog a+8) feat & ata eres gre ufdteentta fase onan ¢, foreret ete corel wt 'a+4 serena Sec gerae weerton quate See re apa 7 = Z (at) - ea Gye pS) HY A. 16.8 days B._17.6 days 18.4days al 2 184 (a=) D. 19.2days ea Ea E. None of these het aac eer cy ‘N-3' boys and ‘N+5' girls together can complete a work in.16 days working 7,6-hours a day. Whereas if efficiency of a boys is decreased by(20%) then.18 boys and Ie girls together can complete the same work in |N-5‘ days working ‘N-3’ hours a day. Efficiency of a boys is more than a girl and the efficiencies are the roots of the equation (x?+15= 8x)) Find the time taken by (N+9) girls to complete-the same work working (N-7) hours a day? — 'N-3' Osh sie 'N+5' sfeal uch ener Ce fea A 7.5 ue ra Hees Ue Te wr 16 ail A yet wean orale oe Ree metal aeiaiat 20n ) eliatTeL a cll orate IG wgfbat set orf at'n-5' feat at'N-3' ue wfafeat corel coeds Yel he Aad 1 vas wages cht cara ten ech A sifeles 2 site cteit afetan aaltepet ie Toes) Same CES . 25 days . None of these | Ques. 59 | moOOmD o o Q a < 3 MeO RN RCAC OTE Barca Asnake climbs a tree 19 m tall. The snake climbs 3 m in the day and slips 2m during the night each time. However there a groves in the tree at 5m, 10m and 15 m from the bottom that would not let the snake slip further. If the snake climbs only during the daytime and slips only during the night, on which day from the start will it reach the top? Ue ain ig sfee Ha Us Ue Ue Ten al aig fear A 3 alee Tear é site ee ae TA dietet 2 aftee flbetes viel 2 dresifes Us A afta A 5 aftez, 10 sftee site 15 after Ge ve Wael Soil aig eH Ht Metesel ol AIT Ale aia aac feat & Alerel Usa z site dacs ea & cheat ftberesa z, at ae ee a foba fear eft ae aga? A. 10‘ day . 11th day c. 12 day D. 13*hday E. None of these OE 46. Cc 55. A 47. B 56. C 48. A 57. B 49. B 58. C 50. B 59. D 51. D 60. B 52. Cc 53. D 54. C 1. 6B 10. A 19. A 28. Cc 37. A 2. C ll. A 20. A 29. A 38. D 3. D 12. C 21. C 30. B 39. C 4. Cc 13. B 22. B 31. B 40. A 5. A 14. B 23. C 32. A 41. B 6. B 15. C 24. D 33. B 42. Cc 7. A 16. B 25. B 34. Cc 43. B 8. D 17. D 26. A 35. D 44. B 9. B 18. C 27. B 36. B 45. Cc

You might also like