Baseline Processing Report - New
Baseline Processing Report - New
Time zone: Romance Standard Time Global reference datum: WGS 1984
Comment 3:
Processing Summary
Observation From To Solution H. Prec. V. Prec. Geodetic Ellipsoid ΔHeight
Type (Meter) (Meter) Az. Dist. (Meter)
(Meter)
Pcp-3 --- Pcp-1 (B5) Pcp-3 Pcp-1 Fixed 0.0031 0.0197 270°51'04. 8956.1984 -7.5058
0"
Pcp-3 --- Pcp-2 (B1) Pcp-3 Pcp-2 Fixed 0.0008 0.0036 319°25'00. 574.0405 32.1095
1"
Acceptance Summary
Processed Passed Flag Fail
2 2 0 0
1
Pcp-3 - Pcp-1 (09:15:00-13:15:16) (S5)
Baseline observation: Pcp-3 --- Pcp-1 (B5)
RMS: 0.0154 m
To: Pcp-1
Vector
2
Standard Errors
Vector errors:
X 0.0000217419
Y 0.0000648997 0.0002475605
Occupations
From To
3
Tracking Summary
4
5
6
Residuals
7
8
9
10
11
12
13
14
15
Processing style
Elevation mask: 10°00'00.0"
Continuous vectors: No
Force float: No
16
Acceptance Criteria
RMS: 0.0108 m
17
Vector Components (Mark to Mark)
From: Pcp-3
To: Pcp-2
Vector
Standard Errors
Vector errors:
X 0.0000009679
Y 0.0000024526 0.0000086154
18
Occupations
From To
19
Tracking Summary
20
21
22
Residuals
23
24
25
26
27
28
29
30
31
32
33
34
35
Processing style
Elevation mask: 10°00'00.0"
Continuous vectors: No
Force float: No
Acceptance Criteria
36