This pre-feasibility report proposes a sand mining project in Sanghpur Village, Vijapur Taluka, Mahesana District, Gujarat, India. H.M. Granite & Mineral owns 3.4 hectares of land near the Sabarmati River bed where sand is found. The project would extract 273,360 metric tons of sand per year to supply the growing demand from local construction projects. It would directly employ 3 skilled and 10-15 unskilled laborers from the nearby rural area. Water needs would be met by tankers from Sanghpur Village and diesel generators used on site. No waste is expected to be generated since all material is saleable. Required approvals will be

Uploaded by

firozr249
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views

DownloadPfdFile Aspx

This pre-feasibility report proposes a sand mining project in Sanghpur Village, Vijapur Taluka, Mahesana District, Gujarat, India. H.M. Granite & Mineral owns 3.4 hectares of land near the Sabarmati River bed where sand is found. The project would extract 273,360 metric tons of sand per year to supply the growing demand from local construction projects. It would directly employ 3 skilled and 10-15 unskilled laborers from the nearby rural area. Water needs would be met by tankers from Sanghpur Village and diesel generators used on site. No waste is expected to be generated since all material is saleable. Required approvals will be

Uploaded by

firozr249
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

(5)

PREFEASIBILITY REPORT
OF
PROPOSED SAND MINING
PROJECT
OF
H.M. GRANITE & MINERAL
AT VILLAGE:- SANGHPUR,

TALUKA:- VIJAPUR,

DIST.:- MAHESANA

1
CONTENTS

1.0 INTRODUCTION

1.1 PREAMBLE

2.0 EXECUTIVE SUMMARY

3.0 INTRODUCTION OF THE PROJECT /BACKGROUND INFORMATION

4.0 PROJECT DESCRIPTION

4.0 AVAILABLITY OF RAW MATERIAL

5.0 SELECTION OF SITE & LOCATION OF STONE MINE

6.0 PLANNING BRIEF

7.0 PROPOSED INFRASTRUCTURE

8.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN

9.0 PROJECT SCHEDULE & COST ESTIMATES

10.0 ANALYSIS OF PROPSAL (FINAL RECOMMENDATION)

2
1.0 INTRODUCTION

1.1 Preamble

Ordinary Sand is base of all types of Building works, Construction of Road,


Construction of Cement Concrete road, The need of Ordinary Sand is in all
fields are very essential as it is a compulsory material for all types of
construction, and Industries fields, Ordinary Sand Mines are providing
employments to the local Labour in Rural area, as the labour of rural area
have no any work for labour, They are Unemployed, Thus this proposed mine
is providing work to many labours and it is a good employment.

2.0 Executive Summary

H.M. Granite & Mineral is a Proposed mine, as the demand of construction


material in all sectors is highly necessary, and this project is providing and
trying to fulfil major demands of Ordinary Sand in complete around area.
About 03-40-00 hectare of land is under possession of H.M. Granite &
Mineral At, Village : Sanghpur, Taluka : Vijapur, Dist :Mahesana.

As per the statuary obligation this project needs environmental clearance from
department of Environment and forest dept. (GPCB) Gujarat. it is proposed
Block and to start quarrying operations (production) accordingly project
proponent has submitted form 1, pre-feasibility report and copy of Approved
Mining Plan dually approved by department of mines and geology Gujarat, to
the state level environmental assessment authority of Gujarat constituted by
MOEF, GOI for issuing environmental clearance, as per
O.M.,F.No11011/175/2018-IA-II(M).of Moefcc dated 12th December-2018..

3.0 Introduction of the Project / Background information:

3.1 Name of the proposed unit : H.M. Granite & Mineral

Registered Office : H.M. Granite & Mineral

A-917, Siddhi Vinayak Complex,


S.G. Highway, Makarba,

3
Ahmedabad-51

Location of proposed unit : Village: Sanghpur,

On River bed Sabarmati patt

(Block SP-20),

Taluka: Vijapur,

Dist: Mahesana. (Gujarat)

Name of Owner : H.M. Granite & Mineral

3.2 Brief description of nature of the project:

It is an Ordinary Sand Quarrying; it contains Ordinary Sand which is


used in construction of infrastructures and road, railways and building
construction etc.

3.3 Demand - Supply Gap: As sand is used as raw material in construction


of building and infrastructure projects, the demand of sand is increasing
day by day. In past, demand was not too much but now a days due to
rapid industrialization and urbanization its demand increasing with pace
of time. At present, demand of sand is more than the supply.

3.4 Imports vs. Indigenous Production: In Mahesana of Gujarat, a


number of sand mines are there. There is abundance of sand in the
area; it had become a major source of economy in the area/region.

3.5 Export Possibility: There is ban on sand export to other states in the
Gujarat by Govt. so export possibility of river sand from this area is
marginal. Major consumers of sand located almost in nearby areas in
the district.

3.6 Domestic / Export Markets: Sand produced is used locally as well as


circulated in nearby area. So clearly there is a huge market of sand in
the area.

4
3.7 Employment Generation (Direct and Indirect) due to the project:

By this mining project of river sand in the area, peoples get


employment; The project directly generates the employment for the
local people and indirectly for the others. Also the marketing of the
product generates the employment for peoples. By this project,
approximately skilled labours-3 and Unskillled-10 to 15 labours on
project site.

4.0 Project Description:

4.1 Type of project including interlinked and interdependent project if


any : No others material is interlinked with this mining work.

4.2 Location (map showing general location, specific location and


project boundary & project site layout) with co-ordinates : The area
has been marked on Google map including the mining Block location.
This comprises the mining Block near village : Sanghpur, Taluka :
Vijapur, Dist Mahesana of Gujarat location of the mining Block is as
under.

5
6
The geographical location of the project is as follows :

N E

23°30’24.84"N 72°47’44.06"E

4.3 Details of alternate sites, considered and the basis of selecting the
proposed site, particularly the environmental considerations gone
into should be highlighted : No other site is considered for the
Proposed project. The land has been allocated by government for the
mining only. As sand in the river is replenished every year by river so,
site is adequate for sand mining.

4.4 Size or magnitude of operation : B category manual.

The proposed Capacity of Block for 3 years is 2,73,360 MT. Total area
of mining Block is 03-40-00 Ha. The mining operation will be @
2,73,360 MT Tonne Production of River sand per month.

4.5 Project description with process details (a schematic diagram/flow


chart showing the project layout, components of the project etc. is
given below:

Open cast mining



OB removal

Loading 

Transportation to end use 

7
4.6 Raw material required along with estimated quantity, likely source,
marketing area of final products. Mode of transport of raw
materials And finished products :

No raw material is required during the mining process.

4.7 Resource optimization / recycling and reuse envisaged in the

project. If any, should be briefly outlined :

As a result of extraction of mineral, the rate of recharging of ground

water is likely to be increased considerably.

4.8 Availability of water its source, Energy/power requirement and

source should be given :

Total water requirement in the mine will be about 10.0 KLD for drinking

& domestic use, dust suppression and plantation. Drinking water will be

brought by water tanker from nearby village Sanghpur. Diesel will be

used in dumpers and tractors.

Nearby village Sanghpur is well electrified.

4.9 Quantity of wastes to generated (liquid and solid) and scheme for

their Management/disposal :

No waste will be generated. All the material is saleable.

4.10 Schematic representations of the feasibility drawing which give

information of EIA purpose :

According to MOEF mining project containing area ≤5 Ha. are

considered in category B2. Schematic representations of the feasibility is

as under.

8
Project Concept and Site selection

Form 1 pre-feasibility project Detail,Approved
Mining plan and check list
to SEIAA

Scoping by SEAC (site visit by
sub group of SEAC, if necessary

Category B2 - EIA not required

Appraisal and recommended by SEAC

Approval by SEIAA 

Display on the SPCB/UTPCC website
& project proponent website

5.0 Site Analysis :

5.1 Connectivity :

Mine site is well connected with road transport. Nearest railway station
is at Kanbha Railway Station (6.50 km) of mine site. Nearest highway is
a National Highway No. 8 Passes about (8.90 km). Mahesana is the
taluka center and all the primary facilities like education, health centres
including hospitals govt. as well as private, religious places are
available. District centre Mahesana is connected by Gandhinagar
Vijapur road is 4.95 km away from Block area.

9
5.2 Land Form - Land use and land Ownership :
The area of Block is 03-40-00Ha. Land is Govt. land (Sabarmati River
Patt Paiky). The Block area forms part of Sabarmati Nadi Patt Paiky (Block SP-
20), No forest land is involved in Block area. Details are given in below table.

S. Type of Area in Near Tehsil District State

No. Land (Ha.) Village

1 On River 03-40-00 Sanghpur Vijapur Mahesana Gujarat


bed
Sabarmati
River Patt
(Block SP-
20)

5.3 Topography (Google image) :

The Block area is situated of village Sanghpur. Topographically, the


area is almost flat & river bed area.

5.4 Proposed land use pattern (agriculture, non-agriculture, forest,


water bodies including area under CRZ), shortest distances from
the periphery of the project to periphery of the forests, national
park, wild life sanctuary, eco sensitive areas, water bodies
(distance from the HFL of the river), CRZ. In case of notified
industrial area, a copy of the Gazette notification should be given:
Nearest Sensitive Name Distance from
Area the Project
within 10 kms
a) Reserve Forest None None
b) National Park None None.
c) Wild life

10
Sanctuary
d) Eco sensitive None None
areas
e) Water source None None
Ground water Map
The project is
located in seismic
zone-III. There is no
flood. cloudburst and
landslide reported so
far.

f) CRZ N.A. None

5.5 Proposed infrastructure :


Mine office is proposed in Block area. A well equipped first aid facility is
proposed to be available at there. Temporary rest shelter urinal and
latrine are proposed. Water will be purchased from nearby tube well
from nearby villages. A small water tank is also proposed in mine office
premises. This can be used for supply of water to drinking purposes.

5.6 Soil classification :

N.A.

5.7 Climatic data from secondary sources :

N.A.

5.8 Social Infrastructure available : N.A.

6.0 Planning Brief :

6.1 Planning Concept (type of industries, facilities, transportation etc.)


Town and country planning development authority classification :

No industries and town planning programmers in the proposed area.

11
6.2 Population projection :

No Human settlements near project area.

6.3 Land use planning (breakup along with green belt etc) :

Details will be given in land use pattern of quarry plan.

6.4 Assessment of Infrastructure Demand (Physical & Social) :

There is no large infra structure demand near to proposed area.

6.5 Amenities / Facilities :

Not applicable as it is a small project.

7.0 Proposed Infrastructure :

7.1 Industrial Area (processing Area) : --NA--

7.2 Residential Area (Non Processing Area) : --NA--

7.3 Green Belt :

The plant is following the norms and is in process to developing 33%


green belt in Block area.

7.4 Social Infrastructure : N.A..

7.5 Connectivity (Traffic and Transportation Road/Rail/Metro/Water


ways etc) :

Well connected with Road/Rail. No metro and water ways.

7.6 Drinking Water Management (Source & Supply of water) :

Drinking water is procured from tube well proposed nearby.

7.7 Sewage system :

The domestic wastewater treat in the septic tank followed by soak pit.

7.8 Industrial waste management : --NA--

7.9 Solid waste management : --NA--

7.10 Power Requirement & Supply / Source : --N.A.--

8.0 Rehabilitation and Resettlement (R & R) Plan :

12
Policy to be adopted (Central / State) in respect of the project affected
persons including home outstees, land outstees and landless labourers
(a brief outline to be given) : --NA--

9.0 Project Schedule & Cost Estimates :

9.1 Likely date of start of construction and likely date of completion


(Time schedule for the project to be given) :

It is a proposed project.

9.2 Estimated project cost along with analysis in terms of economic


viability of the project :

Project cost

No. Particulars Amounts (Rs.)


1 Excavator No.1 25,00,000/-
2 Tractors N0.2 10,00,000/-
3 JCB 10,00,000/-
4 Tanker based Trolley 2,50,000/-
5 Mining Equipment 2,00,000/-
6 Safety Equipments 50,000/-
Total 50,00,000/-

The proposed cost of the project is Rs. 50,00,000 and it is economically

10.0 Analysis of proposal (Final Recommendation) :

Financial and social benefits with special emphasis on the benefit to the
This project is creating employment potential for approximately about 10
to 15 local people.