The document contains details of various GIS projects for TOMTOM including project names, resources assigned, tasks and timelines. It lists 27 projects related to tasks like capturing missing/complex features, deleting superfluous geo, updating geo, restrictions, POIs and APTs. The projects are scheduled to start on November 28th and end by December 4th with forecasted hours and volumes provided for each task.

Uploaded by

rajeev0912
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views

Resource Utilisation RMSI Updated

The document contains details of various GIS projects for TOMTOM including project names, resources assigned, tasks and timelines. It lists 27 projects related to tasks like capturing missing/complex features, deleting superfluous geo, updating geo, restrictions, POIs and APTs. The projects are scheduled to start on November 28th and end by December 4th with forecasted hours and volumes provided for each task.

Uploaded by

rajeev0912
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Project Type Project Name PIN Resource Name Role Manager Name EIN

T&M TOMTOM Sanjay Nautiyal Gis engineeLaxman Negi


Fixed Unit TOMTOM KM_Ankita Gis engineeLaxman Negi
TOMTOM Sonam Dobhal Gis engineeLaxman Negi
TOMTOM Seema Negi Gis engineeLaxman Negi
TOMTOM Neelam Bhatt Gis engineeLaxman Negi
TOMTOM Nitin Sharma Gis engineeLaxman Negi
TOMTOM Deepshikha Bhatt Gis engineeLaxman Negi
TOMTOM Shilpi Gis engineeLaxman Negi
TOMTOM Abhishek Tiwari Gis engineeLaxman Negi
TOMTOM Surbhi Kothari Gis engineeLaxman Negi
TOMTOM Priyanka Kukshal Gis engineeLaxman Negi
TOMTOM Arun Arya Gis engineeLaxman Negi
TOMTOM Pankaj Bhandari Gis engineeLaxman Negi
TOMTOM Pankaj Pal Gis engineeLaxman Negi
TOMTOM Sheespal Gis engineeLaxman Negi
TOMTOM Bhupendra singh Gis engineeLaxman Negi
TOMTOM Gaurav Panwar Gis engineeLaxman Negi
TOMTOM Sarita Pal Gis engineeUmed Rawat
TOMTOM Harshwardhan panGis engineeUmed Rawat
TOMTOM Sunil Gautam Gis engineeTajendra Singh
TOMTOM Vivek Panwar Gis engineeTajendra Singh
TOMTOM Surbhi Gis engineeTajendra Singh
TOMTOM Reshma Rawat Gis engineeTajendra Singh
TOMTOM Mamta Rawat Gis engineeTajendra Singh
TOMTOM Mamta Rani Gis engineeTajendra Singh
TOMTOM Rajesh tiwadi Gis engineeTajendra Singh
Deliverable Service Offering High Level Scope/Details Task Start Date
Missing Geo Geometry To capture missing geo, delete sperflous geo 28/11
Missing Geo Geometry To capture missing geo, delete sperflous geo 28/11
Missing Geo Geometry To capture missing geo, delete sperflous geo 28/11
Missing Geo Geometry To capture missing geo, delete sperflous geo 28/11
NDE Geometry To capture complex features 28/11
NDE Geometry To capture complex features 28/11
Superflous Geo Geometry To capture missing geo, delete sperflous geo 28/11
Superflous Geo Geometry To capture missing geo, delete sperflous geo 28/11
Superflous Geo Geometry To capture missing geo, delete sperflous geo 28/11
Wrong geo Geometry to update geo as per source 28/11
Wrong geo Geometry to update geo as per source 28/11
Wrong geo Geometry to update geo as per source 28/11
Task Restriction To capture restriction as per source 28/11
Task Restriction To capture restriction as per source 28/11
Task Restriction To capture restriction as per source 28/11
Task Restriction To capture restriction as per source 28/11
Task Restriction To capture restriction as per source 28/11
Task ACI To update map as per the customer comment 28/11
Task ACI To update map as per the customer comment 28/11
Task POI To updae POI location and attributes 28/11
Task POI To updae POI location and attributes 28/11
Task POI To updae POI location and attributes 28/11
Task POI To updae POI location and attributes 28/11
Task APT To updae APT location and attributes 28/11
Task APT To updae APT location and attributes 28/11
Task APT To updae APT location and attributes 28/11
Task End Date Status ( ComplForecasted Hours Forecasted Volume Actual Hours Actual Volume
4-Dec completed 42 336
4-Dec completed 42 336
4-Dec completed 42 336
4-Dec completed 42 336
4-Dec completed 42 168
4-Dec completed 42 168
4-Dec completed 42 420
4-Dec completed 42 420
4-Dec completed 42 420
4-Dec completed 42 252
4-Dec completed 42 252
4-Dec completed 42 252
4-Dec completed 42 252
4-Dec completed 42 252
4-Dec completed 42 252
4-Dec completed 42 252
4-Dec completed 42 252
4-Dec completed 42 126
4-Dec completed 42 126
4-Dec completed 42 126
4-Dec completed 42 126
4-Dec completed 42 126
4-Dec completed 42 126
4-Dec completed 42 126
4-Dec completed 42 126
4-Dec completed 42 126