Injection Pump: D B 2 8 2 5 S H 3 7 9 9
Injection Pump: D B 2 8 2 5 S H 3 7 9 9
tesT STAND NOTE: ALL SPEEDS ARE IN ENGINE RPM UNLESS OTHERWISE RPM)
NOTED (+ 5 .
1. INJECTION LINES .__..t....
.093” I.D. BY 25” LONG 2 a. SET THROTTLE FOR 17.25 mm31STROKE AT 1250 RPM.
2. NOZZLES: 0.5 mm Orifice Plate (Ref. S.B. 334) b. LOCK THROl-fLE LEVER IN POSITION AND INSTALL THROlTLE
3. NOZZLE OPENING PRESSURE . 1700 f 25 PSI LEVER PROTRACTOR No. 22969 ONTO ISHAFT.
4. CALIBRATING OILSAE J967 (Latest Revision) TEMPERATURI
110.115nF(at inlet) 2. c. ALIGN w ON PROTRACTOR WITH CENTER OF RIB ON ROCKER LEVER
5. LOW PRESSURE PLUMBING SYSTEM PER S.B. 334 22721 UNLOCKTHROlTLE LEVER AND ROTATE 56OTOWARDWOT POSI-
6. CAM MOVEMENT READOUT DEVICE 21734 TION. ADJUST MAX. TRAVEL SCREW TO THIS 56’ SETTING.
7. ALL FUEL READINGS ARE AT loo0 STROKES d. CHECK TOTAL THROSTLE TRAVEL: WITH THROiTLE IN LOW IDLE PoSI-
PUMP OPERATING SPEED HALF ENGINE SPEED TION, ALIGN CPON PROTRACTOR WITH CENTER OF RIB ON ROCKER-
PUMP ACCESSORIES LEVER, MOVE THR~TLE TO WOT, IREADING SHOULD BE BETWEEN
1. ELECTRIC SHUTQFF (12V-ETR)(TEST WITH 8.8 VOLTS MAX.) 700 and 64O
2. MlLL ADVANCE NOTE: ANY CHANGES AFTER THIS PCIINT WILL REQUIRE RETESTIING
3. DELIVERY VALVE OF PUMP STARTING WITH STEP 11
4. TEMPERATURE COMPENSATING LEAF 3. CHECK POINTS
5. MIN.MAX GOVERNOR II a. AT 1500 RPM NOT) DE-ENEiGIZE ELECTRIC SHUTQFF. FUEL SHoiJLD
PUMP SETllNGS BE 4 mm3ISTROKE; MAXIMUM, RE-ENERGIZE E.S.O.
Pmsum IlMd)
1. ROLLER-TO-ROLLER DIMENSION 1.980 t .ooo5”’ TML m&J Yu C.lll
RPN pa sbolu cyl vu. MU-t TRmp HftQ
‘MAXIMUM ECCENTRICITY: ,008” TIR
b. 150 WOT 19 MIN. - 17 MIN.
2. LINKAGE GAP ._..._..._
,135” to .160”
C. 575 L.I. 12-16 6 2.5' MIN.
3. a. USE GAUGE 21914 TO SET THROlTLE AT 41° CCW, A!
d. 1000 ADJ. 9-11 - :2.5'-4.5'
MEASURED BETWEEN THRO’TTLE BALL STUD AND THROlTLl
e. 1000 ADJ. 19-21 - 1.75g-3.750
SHAFT VERTICAL CENTERLINE.
f. 1500 ADJ. 19-21 - 2.75'-4.25"
b. ADJUST LOW IDLE SCREW UNTIL CONTfiCi IS-MADE WITH IDLI
g. 1500 WOT 36-42 6 1.25'-2.75' 40-54
STOP BOSS. THIS WILL INSURE 41” WHEN GAUGE IS REMOVEI
h. 2000 ADJ. 19-21 - 3.50"~5.50'
FROM PUMP.
i. 2000 WOT - - 2.25'-4.50'
4. OPERATE PUMP AT 1WO RPM (WOT) FOR 10 MINUTES TO BRING T(
i. 3000 WOT - - 4.75*-7.25"
OPERATING TEMPERATURE AND CLEAR AIR FROM SYSTEM.
5. SET T. PUMP PRESSURE AT 1500 RPM &JOT) FOR 48.54 P.S:I. (TES ic.
1.
4000
4400
WOT 35-41
WOT 13MAx.
6
- 130 MAX..
STAND BOOST PRESSURE SET AT 4.5-5.5 P.S.I.)
m.WITH THROTTLE LEVER IN LI. POSITION AND ROCKER ARM HELD
6. CHECK FOR MINIMUM LIFT OF 16” HG. AT 400 RPM
AGAINST FACE CAM, CHECK FOR MAXIMUM TRIMMER SCREW EXI’EN-
7. SET RETURN OIL TO 225375 cc/min. AT 2000 RPM (WOT)
SION OF ,775” MEASURED FROM FACE OF ADVANCE HOUSING BOSS
8. CHECK HOUSING PRESSURE AT xxx) (WOT) FOR 6.12 PSI.
TO END OF TRIMMER SCREW
9. WITH GOVERNOR COVER REMOVED AND THROTTLE SHAFT II
4. AIR-TIME PUMP USING GAGE 21916 (PER 58334) SET TO MINUS 2.5”.3.!5@
Low IDLE POSITION (STEP 3b), SET MIN.MAX GOVERNOI
5. NAME PLATE....LEFT ....VIEWING TRANS. PUMP END
ASSEMBLY FOR 12.16 mmYSTROKE AT 575 PRM (FUEL READING
6. THE 7‘ ” ON THE DRIVE SHAFT
WITH COVER INSTALLED)
TANG MUST BE AT 12 O’CLOCK,
10. CHECK E.S.o:FtiR PUii.lti W-ITH 6.80 VOLTS MAX
WITH THROlTLE LEVER IN LOW IDLE POSITION AT 400 RPM. RELATIVE TO THE GOVERNOR
11. ADVANCE SElTlNG PROCEDURE: COVER, WHEN THE MARK ON
a. CONTROL FACE CAM TO THROTTLE SHAFT END PLAY DURlNl THE GOVERNOR CAGE IS VISI-
AND AT THE COMPLETION OF ALL SEl-flNGS TO ,004” - .006 BLE IN THE TIMING WINDOW.
MEASURED BETWEEN SPACER (16166) 8 HOUSING. 7. TIMED TO THIS CYLINDER (FROM T. PUMP END) -.--.-- @
b. WITH THROllLE IN A WOT POSITION, ROTATE FACE CAM TO IT 6. SPECIAL NOTES:
%$ 1
MAXIMUM LIFT POSITION IN CONTACT WITH THE CAM ROLLEf a. TOROUE ALL FASTENERS PER XL764 OR SB106
c. AT 1500 RPM, ADJUST TRIMMER SCREW (No. 22642) FOR b. PUMP TO BE TESTED WITH FITTINGS 22109 B 22619 INSTALLED
DEGREES CAM ADVANCE (range 1.25O.2.75’ ) c. SEAL MAXIMUM TRAVEL ADJUSTING SCREW, ADVANCE TRIMMER
d. SET THROTTLE FOR 1921 mm31STROKE AT 1500 RPM, AN SCREW AND FACE CAM SCREW WITH RETAINING COMPOUND No.,!1915
ROTATE FACE CAM TO OBTAIN 3.5 DEG. CAM ADVANCE (RANG d. OPEN PETCOCK FOR PRESSURE CHECK ONLY
2.75O . 4.25”) e.Pump Model Number becomes DB28252F3979 When Kit 23007
e. AFTER SETTING IS OBTAINED, SCREW No. 22396 IS TORQUE or 23008 is used.
PER XL+ OR S.B. 1 IOTE: PUMP MOUNTING. HORIZONTAL PLJMP ROTATION-COUNTER-(:LDCKWISl
19.SEAL PUMP FASTENERS PER XL874 OR SB365 -
f.CHECK FACE CAMk I TORQUEPER-XL865
I
P 13521 3 WASHER, cover screw
22109 22619 1 ELBOW, return line connector
CONN. ASSY., return line
LABEL, pump identificatic 22745 ** AZ;SE:MBLE & TORQUEPER XL 848
GASKET, governor cover 12054 21247 SEAL, return line connector
21249 ; COVER, governor control
-. -
i
RETAINER, rotor
SEAL, transfer pump I
LINER, transfer pump
SPRING, trans. pump bl,ade
RING, liner locating
REGULATORASSY., trans. pump
BLAIIE. tlransfer pump(Basic]
Use 20511 or 20512 as req'
19837 ROLLPIN
~ 2272 1
z239;
1234(
T 1
:
LEVER ASSY., rocker -
PIN. rocker lever pin
RING, retaining
SEAL, piston hole plug 22399 2766 1 SEAL, adv. screw hole plug
PIN cam advance 22368
-!305(
.A- PLUG, adv. screw hole
L
ELECTRIC SHUT-OFF GROUP
m
1618 [NSUlATOR. terminal
4760 : .OCKNUT. terminal contact
1518 1 TERMINAL, electric skut-off
STRAP, terminal grounding 20951
LOCKWASHER, cover screw 18493 2049 .OCKWASHER,terminal contact
NUT, terminal contact 12519 2049 % IASHER. terminal contact
WASHER,terminal contact 18501 2 IASHER. terminal insulating
.--.
.A-
-
-
-