240 Tons Sewage
240 Tons Sewage
Editor Company:
JiangSu ZhongYuan new energy Co.,LTD
5th April,2018
1、 General situation
After sewage treatment used for water jet loom, the project address is
XXXXXX.
2. Sewage water quantity and quality
2.1 Sewage treatment
According to the sewage treatment capacity be provided by factory is 240m3 /
d (mainly the production of sewage in looms),the number of looms in your company
is 64sets. The processing power should be at 240m3 / d, so the production and other
parts of the water will be satisfied by the calculation of 10 tons per hour.
sewage
grid
oil separator
fan sewage pool
sewage pump
` sewage pump
alkali desilter
PAC
PAM Air flotation The sludge pool
1
filtered water pump filtered water
External disposal of
mud.
bag filter
7.Process description:
7.1 Grid:
There are thick and thin grid each 1 in the workshop sewage gutter, the thick
grid bar spacing 40mm, the thin grid bar spacing 5mm.
7.2 Regulating pool:
The pool plane is round or square.The waste water is discharged into the pool
from top to bottom of the intake pipe at the center of the desilter. The water inlet is
provided with an umbrella baffle, which makes the waste water evenly distributed in
the pool, and then slowly rises along the whole section of the pool.The suspended
material sinks into the conical sludge hopper under the action of gravity, and clarifies
the discharge of water from the overflow weir around the upper end of the
pool.Scum tank and baffle can be set in front of overflow weir to ensure water
2
quality.
tank, a dissolved gas tank, an air compressor and a reflux pump, which is controlled
by an electric control box.There are a large number of fine suspended solids in the
waste water and grease, through the processing of air floating device can greatly
reduce the pollutant concentration, the polymer flocculant is added when the air
flotation device is working, wastewater after dosing reaction in the gas floating in the
pool, and by fully mixing type TJ releaser release bubbles contact, make the
flocculation body adhesion on the tiny air bubbles in the water, the release of the
average bubble diameter Φ30 um, flocs float to the surface of the formation of scum,
scum gathered in a certain thickness, gravity to floating mud tank to the sludge
concentration pool, the lower part of water by the dissolved air flotation pool pump
pumping for dissolved air water use, the rest of the water through the overflow tube
It is a pressure type filter device, the main filter cylinder, cylinder lid and quick
opening mechanism, stainless steel filter bag strengthen network and so on the main
parts, the filtrate by filter shell side inlet tube into the filter bag, filter bag itself is
settled into strengthening netting basket, liquid penetrant fineness required for
grades of filter bag that can obtain qualified filtrate, impurity particles blocked by the
3
filter bag.It is very convenient to change the filter bag, and the filtration is basically
non-material consumption.
The bag filter has many advantages such as reasonable structure, good sealing,
strong circulation ability and simple operation.In particular, the leakage rate of the
filter bag is small, which can correctly guarantee the filtration accuracy and can
change the filter bag quickly, so that the operation cost is reduced.The internal and
average and easy to clean.We know that the bag filter filtering method is taken by
the method of side in side out, side in bottom out, also can take through the
pressure in the pipeline to filter the liquid medium pressure into or smoke into the
barrel, the bag filter to filter the liquid medium filter blue supporting by electrolytic
polishing punching support of filter bag filter, change of solid liquid to liquid medium
to be filtered results.
7.6 Water reuse pool: after purification, the sewage flows into the clear water
tank, and the pressure difference is used for water use in the workshop.
8 Main construction and equipment list
8.1Main constructions
According to design drawing
Alkali medicine PE
3 1000L 1unit 6000
cabinet
4
Coagulant and PE
4 1000L 1unit 6000
medicine cabinet
Coagulant and PE
5 1000L 1unit 6000
medicine cabinet
Stainless steel
7 Dissolved air pump CDL16-40 1unit 9000
hangzhou south
UPVCHuaYa Complete
14 Piping, valves, etc. DN15-100 22000
d
5
8、Operation cost analysis
work is the normal operation of the sewage station, equipment and pipes
The total cost is 1.00 yuan /m3. Water, that is, the average treatment per m3 of
different, and the artificial wage is different, the water treatment fee will be changed.
6
Therefore, the above data is for reference. Please understand.
9、Station location
The design life of the disposal unit is 50 years. The design life of the metal parts
equipment (facilities) maintenance for life.We have fully considered the stability of
7
12.1.1 In order to ensure the quality of our equipment and the safe operation, we
make the following commitments to the after-sales service:
1、The components of all materials in this equipment are new and unused high
quality without any defects affecting the performance.The main supplier of the key
equipment and materials accessories is the supplier with ISO9001 quality assurance
system qualified.
2、Detailed random information will be provided when the equipment is shipping,
3 、 Responsible for the installation, commissioning and commissioning of the
equipment until the equipment meets the technical standards required by the user.
12.1.2 Engineering time arrangement
1、The supply of engineering equipment shall be finished on time according to
the demand.
2、Engineering installation and commissioning about 7 days.
3、System operator training for about 3 days.
12.1.3 Personnel training and engineering commissioning.
1、Personnel training: mainly training the operators and management personnel
provided by the users.
Operator: familiar with the principle of handling, and operation of the equipment.
Management personnel: familiar with and master the principles of handling
engineering, operating procedures, knowledge of test procedures to be able to
independently master the normal operation of the system.
2 、 Equipment commissioning: after all equipment construction and installation is
finished and the monomer test is carried out,our debugging personnel for the linkage
of the equipment running and the user side personnel on-site guidance training, until
after treatment met the requirement of the water, and responsible for free technical
advice and equipment maintenance in the warranty period.
1、The seller shall provide the free spare parts of equipment when the equipment
is damaged due to poor quality and cannot work normally after 12 months from the
commissioning date.
2、The company is informed within 24 hours.
12.1.5 Delivery date and place of delivery.
Delivery time: 30 calendar days after the contract becomes effective.
Delivery place: the seller shall deliver the goods to the buyer's designated place.
12.1.6 Handover list
1、The civil condition drawing shall be provided within 1 week from the effective
date of the contract,
2、List of qualified spare parts and daily medicine list.
3、Provide operating instructions.