Installation Review
Installation Review
Commissioning Checklist
C7 - C32
Table of Contents
Cover Sheet….………………………………………………………………………………. 3 - 6
Start-up………………………….. ……………………………………………………………13 - 14
Vibration Levels………………..…………………………………………………………….. 15
C7 - C32 Marine Propulsion Startup &
Commissioning Checklist
Cover Sheet
General
Selling Dealer: Vessel builder:
Vessel Name: OEM Model:
IMO Number: Flag State:
Home Port: Area of Operation:
Address:
Vessel Data
Hull Type: Displacement Semi-Displacement Planing
Length: Waterline length: Beam:
Design Draft: Actual Draft: Displacement:
Expected Hull Speed: Hull exponent:
(Free Running, Knots)
Vessel Type
Pleasure Craft: Cruiser Sportfish Yacht Sailboat Other
Tow Boat: River Intercostal Ocean Lower Mississippi Other
Fishing: Trawler / Dragger Long Liner Gillnetter Trap Fishing
Cargo: Bulk Container General
Other:
Application Information
Maximum expected altitude operation: Maximum / Minimum expected ambient air temp:
Engine installation angle & front/rear down?: Maximum expected Sea Water Temp:
Maximum expected tilt angle in operation: Expected average operation hrs. per year:
Anticipated Engine load factor: Anticipated percent of idle operation:
Propulsion System
Propulsion Engine:
Model: Rating: bhp bkW
Rated speed: Performance Rating: Test Spec:
Eng. Feature code: Performance Spec No.:
Engine S/N:
Major Attachments:
Position in Vessel: Port Center Starboard Other (Eng. No)
Torsional Vibration Yes Analyst: Report No:
Analysis performed: No
Marine Transmission
Manufacturer: Model: Serial No.:
Ratio: Fwd: Reverse:
Gear Oil Cooler
Specifications:
Coupling
Manufacturer: Model: Size:
Type: Serial No.:
Propeller
Propeller Type: Fixed Pitch Controllable Pitch Surface Drive Jet Drive
Manufacturer: Model: Material:
No. of Blades: Diameter: Pitch:
Cooling System
Type: ATAA Keel SWAC SCAC Central
Type of Cooler: Material: Area:
Type Fan Drive:
Type of Coolant: ELC Conventional Glycol SCA/Water Other
Brand: % Concentration:
Sea Water Strainers: Brand: Mesh Size:
Fuel System
Fuel Type: Brand: Sulfur Content (PPM):
Primary Fuel Filters: Brand: Mesh Size:
Other: Water Separator Duplex Filters
Biodiel (%)
Tank Height above engine inlet ( - if below): m Lift Pump (if below):
Fuel supply line inside diameter: mm length: m
Fuel return line inside diameter: mm length: m
Lubrication System
System options: Duplex Filters Centrifugal Pre-Lubrication Auxiliary Oil Sump
Type of Oil Sump: deep shallow Capacity: [ ltr / US Gal]
Oil specification: Oil filled to sump: [ ltr / US Gal]
Starting Systems
System options: Electric Pneumatic Hydraulic
Starter Manufacturer: Model:
Alternator Manuf.: Model: V A
Battery Manuf.: Model / Capacity: CCA (0°C): A
Number of Batteries: Starting Cable Size: Total length supply and return: m
Starting Aids: Glow Plugs
Ether Aid
JW Heater Power: W Voltage: V
Inlet Air Heater Manufacturer Type/Model:
Exhaust System
Type: Dry Water Cooled (Wet) Lift Muffler (if wet)
Mufflers: Aftertreatment:
Additional Information
Throttle System
Type: Cat MSCS Cat Three60 Other
Manufacturer: Model: Signal:
Sync mode Slow vessel mode Trolling mode
Vessel instrumentation
Number of Stations: Type:
Location(s):
Mounting information
Type: Flexible Mounts Steel Shims Poured Shims Hard Mounted Collision blocks
Supplier of Flexible Mounts (if Equipped): Model:
Brand / Type of Epoxy Resign:
Tilt angle: Front up Front down Angle (Degrees):
to Left to Right Angle (Degrees):
Environmental Conditions
Ambient Temperature: Elevation:
Engine Room Temp: Relative Humidity:
Atmospheric Conditions:
Storage and Insulation (Genset)
Generator Dried for 48 Hours Before Start- Visual Inspection Before Start-up -- Grease,
Yes No N/A Yes No N/A
up (See SEHS9124): Water, Debris, (Foreign Material):
Drying Method:
Attachments
Documents: TVA Alignment Record Generator Insulation Ventilation Strategy
CAT ET Status Report CAMPAR Report Vibration Results Sound Test Results
Others:
Comments
Customer Acceptance
CAUTION! Only qualified personnel who have been trained to support the product should attempt to proceed with startup.
Note: Service Engineer must communicate with customer to understand site requirements for Personal Protective Equipment
(PPE), Lockout and other safety procedures.
4. Alarm Verification
1 Low water level Yes No N/A 9 Jacket Water Pressure Yes No N/A
2 High Jacket Water temperature Yes No N/A 10 MCS engine safety device (Diesel Control Unit) Yes No N/A
3 Low Jacket Water temperature Yes No N/A 11 Overspeed Yes No N/A
4 Low oil pressure Yes No N/A 12 Crank Terminate Yes No N/A
5 Low oil level Yes No N/A 13 High Exhaust temperature Yes No N/A
6 Low Fuel Pressure Yes No N/A 14 Neutral safety switch functional Yes No N/A
7 High Fuel Pressure Yes No N/A 15 Starter interlock functional Yes No N/A
Additional MCS alarm and protections demostrated and
8 E-Stop function Yes No N/A 16 Yes No N/A
verified by society surveyor
References:
Notes:
5. Governor Settings
Copy saved of the ECM replacement file or other record
1 Yes No N/A
governor settings saved
References:
Notes:
6. Intake System/Exhaust System
1 Check for damage Yes No N/A 8 Exhaust pipe properly supported and isolated Yes No N/A
2 Remove air filter bags / covers Yes No N/A 9 Exhaust bellows installed according to manf. Spec. Yes No N/A
3 Check exhaust water drain pipe & valves Yes No N/A 10 Emissions control unit installed & operational Yes No N/A
4 Air intake condensate drain provided Yes No N/A 11 Check for duct isolation Yes No N/A
5 Air filter housing seal present & serviceable Yes No N/A 12 Exhaust Temperature Port installed and accessable Yes No N/A
6 Check for missing or loose hardware Yes No N/A 13 Exhaust Backpressure Port installed and accessable Yes No N/A
7 Pre-lube turbo charger Yes No N/A
References: LEBW4969, LEBW4970
Notes:
15. Coupling
1 Veryfy coupling type and serial number Yes No N/A 3 Alignment record attached Yes No N/A
2 Alignment requirements met Yes No N/A
References:
Notes:
16. Engine Mounting System
1 Verify flexible mount type and serial number Yes No N/A
2 Flexible mount central buffer clearance checked Yes No N/A
References:
Notes:
Initial / Final
Horizontal Gap/Angle: /
Horizontal Offset: /
Vertical Gap/Angle: /
Vertical Offset: /
References:
Notes:
Start-up
1. Safety and Serviceability
1 Reviewed start-up procedure and Safety Information Yes No N/A 7 Start Engine Yes No N/A
2 Personal protection equipment worn Yes No N/A 8 Remote start/stop checked & operational Yes No N/A
3 Floors are clean / no hazards Yes No N/A 9 Emergency stop functional Yes No N/A
4 Floor openings are covered Yes No N/A
5 Gauges are functional (oil, fuel, air, other…) Yes No N/A
6 Adequate access to oil spill prevention equipment Yes No N/A
Notes:
2. Systems
1 Check for correct oil pressure Yes No N/A 7 Jacket water heater off when engine running Yes No N/A
2 Check for fuel or oil leaks Yes No N/A 8 Prelube pump off when engine running Yes No N/A
3 Oil level is correct Yes No N/A 9 All temperature and pressure gauges reading Yes No N/A
4 Check intake and exhaust systems for leaks Yes No N/A 10 take oil sample after 1st hr of running Yes No N/A
5 Expansion tank(s) appropriate level Yes No N/A Yes No N/A
6 Emissions control unit operational Yes No N/A Yes No N/A
Notes:
3. Alarm Verification
1 Low oil level Yes No N/A 4 Remote E-Stops Yes No N/A
Additional MCS alarm and protections demostrated and
2 Over speed Yes No N/A 5 Yes No N/A
verified by society surveyor
3 E-Stop Yes No N/A Yes No N/A
Notes:
4. Sea Trial
1 All fluid levels checked Yes No N/A 6 Install fuel flow meters Yes No N/A
2 Get vessel's load condition. Use nautical info form Yes No N/A 7 Engine at operating temperature Yes No N/A
3 Ask captain to log vessel speed every rpm step Yes No N/A 8 Sea trial conducted per Sea Trial Guide (LEBM0025) Yes No N/A
4 Measure API gravity and fuel Temp. Yes No N/A 9 Sea trial data loaded into CAMPAR and results attached Yes No N/A
5 Measure glycol protection Temp. Yes No N/A 10 safe ECM download Yes No N/A
References: LEBM0025
Notes:
Customer Acceptance