0% found this document useful (0 votes)
17 views

Monitoring of Weekly Status of Barangay Development Program (BDP)

The memorandum provides updates on the status of projects under the Barangay Development Program (BDP) being implemented in 30 barangays across 3 provinces. It details that projects in 8 municipalities of Batangas Province have been completed, are ongoing, or have been completed. These include construction of health stations, roads, water systems, and more. The memorandum is intended to inform the Regional Director of Police Regional Office 4A on the progress of BDP projects.

Uploaded by

Batangas ISOS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

Monitoring of Weekly Status of Barangay Development Program (BDP)

The memorandum provides updates on the status of projects under the Barangay Development Program (BDP) being implemented in 30 barangays across 3 provinces. It details that projects in 8 municipalities of Batangas Province have been completed, are ongoing, or have been completed. These include construction of health stations, roads, water systems, and more. The memorandum is intended to inform the Regional Director of Police Regional Office 4A on the progress of BDP projects.

Uploaded by

Batangas ISOS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 16

Republic of the Philippines

NATIONAL POLICE COMMISSION


PHILIPPINE NATIONAL POLICE, POLICE REGIONAL OFFICE 4A
BATANGAS POLICE PROVINCIAL OFFICE
Camp General Miguel C Malvar, Kumintang Ilaya, Batangas City

MEMORANDUM

FOR : RD, PRO4A


(Attn: Chief, ROD-ISOS)

FROM : Provincial Director

SUBJECT : Monitoring of Weekly Status of Barangay Development


Program (BDP)

DATE : January 20, 2024

1. Reference: Memorandum from Regional Director, PRO CALABARZON


dated June 18, 2021 with same subject as above.

2. This pertains to the implementation of Barangay Development Program


(BDP) to the 30 identified barangays in Batangas, Rizal and Quezon Provinces.

3. In this regard, submitted are the updates on the status of projects in their
respective barangays included in the BDP in the Municipalities of Balayan, Calaca,
Calatagan, Lian, Lobo, Nasugbu, San Juan and Tuy, all in Batangas Province.

4. For information.

SAMSON B BELMONTE
Police Colonel
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE, POLICE REGIONAL OFFICE 4A
BATANGAS POLICE PROVINCIAL OFFICE
Camp General Miguel C Malvar, Kumintang Ilaya, Batangas City

Barangay Development Plan


Covered Period: January 14-20, 2024

Number of Number of
No. of
Fund Program Status of PNP AFP
Province Municipality Brgy Coordination REMARKS
Received Activities Projects personnel personnel
deployed deployed
LGUs AFP

Construction of
Brgy. Project
Received Brgy Health Completed 0 0 7 1
Patugo Completed
Station

Concreting of
Brgy Farm-to-Market Project
Received Completed 0 0 7 1
Patugo Road Completed
Batangas Balayan

Brgy Patubig sa Almost


Received Ongoing 2 0 7 1
Patugo Magsasaka Completed
Construction of Project
Brgy.
Received Two-Storey Brgy Completed 0 0 0 0 Completed
Sucol
Health Station

Brgy. Road construction Project


Received Completed
Sucol going to 0 0 0 0 Completed
mountainous area

Balayan

Brgy. Project
Received
Sucol Water System Completed 0 0 0 0 Completed

Received

Concreting Brgy
Road at Sitio
Brgy. Santolan, Completed
Project
Calaca Coral Ni Barangay Coral ni 0 0 0 0
Completed
Lopez Lopez, Calaca
City, Batangas
Concreting Brgy
Road at Sitio
Brgy. Completed
Sugod, Coral ni Project
Coral Ni Received 0 0 0 0
Lopez, Calaca Completed
Lopez
City, Batangas

Installation of
Brgy.
Solar Street Completed Project
Coral Ni Received 0 0 0 0
Lights Completed
Lopez

Sustained
Brgy. Agriculture for
Socio Economic Completed Project
Coral Ni Received 0 0 0 0
Completed
Lopez Development
Installation of
Brgy. Project
Solar Panel and
Taklang Received Completed 0 0 0 0 Completed
Anak Street Lights

Barangay Health
Brgy Project
Station with Completed
Taklang Received 0 0 0 0 Completed
Anak Isolation Facility

Taklang Anak
Elementary
Brgy School (two Project
rooms, one Completed
Taklang Received 0 0 0 0 Completed
Anak storey)
Brgy Construction of Project
Completed
Taklang Received Barangay Road 0 0 0 0 Completed
Anak

Brgy Distribution of Project


Completed
Taklang Received Financial 0 0 0 0 Completed
Anak Assistance to 500
Indigent Families

Calaca
Sustainable
Agriculture for
Socio-Economic
Brgy Development Project
Completed
Taklang Received 0 0 0 0 Completed
Anak

Brgy. Financial Completed


Calatagan Completed 0 0 0 0
Talibayog Received Assistance to Project
Indigent Individual
or Families for
Medical, Burial,
Transportation,
Food, Cash for
Work, and
Education & Basic
Training on
Proper Fishing
Basic Training on
Proper Fishing

Basic Training on
Brgy. Completed
Received Proper Fishing Completed 0 0 0 0
Talibayog Project

Lian Completed

Concreting and
Opening of Farm
Brgy. Project
Received to Market Road at 0 0 0 0
Lumaniag Completed
Sitio Bacayan 2

Brgy. Not yet Completed 0 0 0 0 Project


Lumaniag received Completed

Sitio
Camachilihan,
Brgy. Lumaniag,
Lian, Batangas
Concreting and
Project
Brgy. Opening of Farm
Received Completed 0 0 0 0 Completed
Lumaniag to Market Road at
Sitio Kay Reyna

Completed

Construction of
Project
Brgy. Level 2 Potable
Received 0 0 0 0 Completed
Lumaniag Water System

Improvement of
Project
Bgry. Farm to Market
Lobo Received Completed 0 0 0 0 Completed
Calumpit Road
Installation of
Solar Panel Street Project
Brgy. Lights along
Received Completed 0 0 0 0 Completed
Bulihan Barangay Road of
Brgy. Bulihan,
Nasugbu,
Batangas

Completed

Concreting and
Opening of Farm-
to-Market Road at Project
Brgy.
Received Sitio Bubuyasin, 0 0 0 Completed
Bulihan
Brgy. Bulihan,
Nasugbu,
Nasugbu Batangas,

Concreting of
Farm-to-Market
Road at Sitio
Brgy. Project
Received Combento, Brgy. Completed 0 0 0 0
Bulihan Completed
Bulihan,
Nasugbu,
Batangas

Concreting of
Farm-to-Market
Road at Sitio Project
Brgy.
Received Centro, Brgy. Completed 0 0 0 0 Completed
Bulihan
Bulihan,
Nasugbu,
Batangas
Construction of
Overhead Tank at Project
Brgy. Sitio As-is, Brgy.
Received Completed 0 0 0 0 Completed
Kaylaway Kaylaway,
Nasugbu,
Batangas

Construction of
Overhead Tank at
Sitio Balagbag, Project
Brgy. Brgy. Kaylaway,
Received Completed 0 0 0 0 Completed
Kaylaway Nasugbu,
Batangas

Construction of
School Building, Project
Brgy.
Received Brgy. Kaylaway, Completed 0 0 0 0 Completed
Kaylaway
Nasugbu,
Batangas

Brgy. Received Completed 0 0 0 0 Project


Kaylaway Concreting of Completed
Farm-to-Market
Road at Sitio
Balagbag, Brgy.
Kaylaway,
Nasugbu,
Batangas
Concreting of
Farm-to-Market
Road at Sitio Project
Brgy. Hulo, Brgy. Looc,
Received Completed 0 0 0 0 Completed
Looc Nasugbu,
Batangas

Completed
Concreting of
Farm-to-Market Project
Brgy. Road at Sitio
Received 0 0 0 0 Completed
Looc Maglangoy, Brgy.
Looc, Nasugbu,
Batangas

Concreting of
Farm-to-Market
Road at Sitio
Project
Brgy. Combento 1,
Received Completed 0 0 0 0 Completed
Looc Brgy. Looc,
Nasugbu,
Batangas

Concreting of
Farm-to-Market
Road at Sitio
Project
Brgy. Combento 2,
Received Completed 0 0 0 0 Completed
Looc Brgy. Looc,
Nasugbu,
Batangas
Concreting of
Farm-to-Market
Road at Sitio Project
Brgy.
Received Saluysoy, Brgy. Completed 0 0 0 0 Completed
Looc
Looc, Nasugbu,
Batangas

Received Concreting of
Farm-to-Market
Road at Sitio Project
Brgy.
Carsada, Brgy. Completed 0 0 0 0 Completed
Looc
Looc, Nasugbu,
Batangas

Construction of
one (1) Storey
Health Center at Project
Brgy.
Received Sitio Centro, Brgy. Completed 0 0 0 0 Completed
Papaya
Papaya,
Nasugbu,
Batangas

Rehabilitation and
Upgrading of Project
Brgy. Barangay Road,
Received Completed 0 0 0 0 Completed
Papaya Brgy. Papaya,
Nasugbu,
Batangas
Construction of
Level II Potable
Water System Project
Brgy. Project at Sitio
Received Completed 0 0 0 0 Completed
Papaya Hamilo, Brgy.
Papaya,
Nasugbu,
Batangas

Improvement of Completed
Level II Potable
Water System at Project
Brgy.
Received Sitio Dagundong, 0 0 0 0 Completed
Papaya
Brgy. Papaya,
Nasugbu,
Batangas
Concreting of
Farm to Market
Road at Sitio Kay Project
Brgy.
Nasugbu Received Pusa, Brgy. Completed 0 0 0 0 Completed
Butucan
Butucan,
Nasugbu,
Batangas

Brgy. Sitio Dau, Brgy.


Project
Laiya Laiya Aplaya, San
Received Completed 0 0 0 0 Completed
Aplaya Juan, Batangas

San Juan

Sitio Parang Sili,


Brgy. Brgy. Laiya Project
Quipot Received Aplaya, San Juan, Completed 0 0 0 0 Completed
Batangas
Brgy Road at Sitio
Lopez, Mahabang
Project
Brgy. Parang, Brgy.
Received Completed 0 0 0 0 Completed
Toong Toong, Tuy,
Batangas

Completed
Brgy Road at Sitio
Tuy Sampalukan, Project
Brgy.
Received Brgy Toong, Tuy, 0 0 0 0 Completed
Toong
Batangas

Improvement of
Barangay Road at
Project
Brgy. Sitio Unson,
Received Completed 0 0 0 0 Completed
Toong Barangay Toong,
Tuy, Batangas

Construction of
Barangay Health
Station Building
Project
Brgy. with Isolation
Received Completed 0 0 0 0 Completed
Toong Facility, Barangay
Toong, Tuy,
Batangas

Prepared by: Checked by: Noted by:


Julie An A Mabborang RADAM R RAMOS SAMSON B BELMONTE
Patrolwoman Police Lieutenant Colonel Police Colonel
ISOS PNCO Chief, POMU Provincial Director

You might also like