0% found this document useful (0 votes)
66 views

QC Forms For Earthworks

1) This document appears to be a request form for inspection or approval of work completed by a contractor on a construction project. It includes sections to be filled out by the contractor requesting inspection, the engineer receiving the request, and the engineer approving or denying the request. 2) The second document is an inspection report form to log inspection checks done on earthworks, pavement works, or drainage works. It includes a table to record the date, time, and comments on the work inspected. 3) The third document is a summary report of laboratory and field tests done on embankment fill, subgrade, sub-base, road base, asphaltic concrete, and shoulders for a period. It includes

Uploaded by

ikhlasliving
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views

QC Forms For Earthworks

1) This document appears to be a request form for inspection or approval of work completed by a contractor on a construction project. It includes sections to be filled out by the contractor requesting inspection, the engineer receiving the request, and the engineer approving or denying the request. 2) The second document is an inspection report form to log inspection checks done on earthworks, pavement works, or drainage works. It includes a table to record the date, time, and comments on the work inspected. 3) The third document is a summary report of laboratory and field tests done on embankment fill, subgrade, sub-base, road base, asphaltic concrete, and shoulders for a period. It includes

Uploaded by

ikhlasliving
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Contractor / Turnkey Contractor *: Project :

Consulting Engineer/Engineer/S.O.R *
Contract No. :

REQUEST FOR INSPECTION / APPROVAL CHIT CHIT NO. :

(EARTH WORKS / PAVEMENT WORKS / DRAINAGE WORKS / STRUCTURAL WORKS / OTHER WORKS)*

PART A : (To be filled by Contractor)

From : CONTRACTOR'S REPRESENTATIVE

To : RESIDENT ENGINEER

We request for inspection and permission to proceed with the following work;

Submitted by :- Signature : Checked by :- Signature :


( ) Contractor's Representative

Time : Date : / /

PART B : (To be filled by Consulting Engineer/Engineer's Staff)*

Received by:- Signature : Time : Date : / /

Name :

Comments :-

Survey & Setting Out : Inspection of Prior Work : Testing of Prior Work :

Signature : Signature : Signature :


(Survey Technician) (Inspector of Works) (Laboratory Technician)

PART C : (To be filled by Engineer / Quality Assurance Engineer)*

From : RESIDENT ENGINEER

To : CONTRACTOR's REPRESENTATIVE

Your request to proceed with the above mentioned work IS APPROVED


*
IS NOT APPROVED

Remarks :

Received for Contractor ; Signature :


Resident Engineer

Time : Date : / /
Signature :
Contractor's Representative

Neither the endorsement of this Form nor anything written on it is intended to convey final
Time : Date : / / approval for any part of the Works, nor does it relieves the Contractor of his responsibility to
comply with the quality requirements of the Works.

* select as appropriate
Contractor / Turnkey Contractor *: Project :

Consulting Engineer/Engineer/S.O.R *
Contract No. :

INSPECTION REPORT Report No :


(Earth Works/Pavement Works / Drainage Works)*

CHECKS DONE
WORK / OPERATION DATE & COMMENTS
INSPECTED TIME (Deficiencies, Degree of Completion,
1 2 3 4 5 6 7 8 9 10
Weather, others)
Ref : Approval Chit No

Ref : Approval Chit No

Ref : Approval Chit No

Ref : Approval Chit No

CHECK-LIST CHECK MARKS Checked by;

1. SETTING OUT 6. MATERIALS ALL AS REQUIRED O. K. Signature :


Inspector of Works

2. PRIOR WORK 7. TESTING DEFICIENT X Name :

3. DIMENSIONS 8. COMPACTION NOT APPLICABLE - Date :

4. EQUIPMENT 9. WORKMANSHIP NOT CHECKED O

5. LABOUR 10.

Date :

* Select as appropriate
Contractor / Turnkey Contractor *: Project :

1)
Consulting Engineer/Engineer/S.O.R *
Contract No. :

SUMMARY OF LABORATORY & FIELD TESTS


(Earth Works & Pavement Works)
For the period from : / to / / 20

No. of Tests Carried Out No. of Tests

Works Item & Type of Test During the Passed Failed Remarks
reporting Previously Total (During the Reporting
period Period)
EMBANKMENT FILL BELOW TOP 300mm :
Lab Tests : * Gradation Analysis
* Atterberg Limit (Casagrande Method)
* C. B. R. (4-Days Soaked Test)
(for the top 0.7m of fill)
* Std. Compaction Test (BS 1377:1990)
Field Tests : * Field Density Test (Sand Replacement Method)
TOP 300mm SUBGRADE (for Cut & Fill) :
Lab Tests : * Gradation Analysis
* Atterberg Limit (Casagrande Method)
* C. B. R. (4-Days Soaked Test)
* Std. Compaction Test (BS 1377:1990)
Field Test : * Field Density Test (Sand Replacement Method)
SUB-BASE :
Lab Tests : * Gradation Analysis
* Atterberg Limit (Casagrande Method)
* C. B. R. (4-Days Soaked Test)
* Aggregate Crushing Value
* Std. Compaction Test (BS 1377:1990)
Field Test : * Field Density Test (Sand Replacement Method)
ROAD BASE :
Lab Tests : * Gradation Analysis
* Atterberg Limit (Casagrande Method)
* C. B. R. (4-Days Soaked Test)
* Sodium Sulphate Soundness Test
* Aggregate Crushing Value
* Flakiness Index
* Std. Compaction Test (BS 1377:1990)
Field Test : * Field Density Test (Sand Replacement Method)
ASPHALTIC CONCRETE FOR PAVEMENT COURSES : ACBC ACWC ACBC ACWC ACBC ACWC ACBC ACWC ACBC ACWC

Lab Tests : * Gradation Analysis & Bitumen Extraction


* Aggregate Crushing Value
* Flakiness Index
* Bitumen Stripping Test
* Sodium Sulphate Soundness Test
* % Water Absorption
* Polished Stone Value (for wearing course)
* Marshall Method Tests (Prod. Stage)
Field Test : * Thickness Test (coring)
* Compacted Density Test (coring)
SHOULDERS :
Lab Tests : * Gradation Analysis
* Atterberg Limit (Casagrande Method)
* C. B. R. (4-Days Soaked Test)
* Std. Compaction Test (BS 1377:1990)
Field Test : * Field Density Test (Sand Replacement Method)
* select as appropriate
Contractor / Turnkey Contractor * : Project

Consulting Engineer/Engineer/S.O.R * Contract No. :

NATURAL MOISTURE CONTENT


Sample Location (Chainage / Borrow Pit No.)* :

Date of Test

Sample No.

Specimen No.

Container No.

Mass of Wet Soil + Container W2 (g)

Mass of Dry Soil + Container W3 (g)

Mass of Moisture W2 - W3 (g)

Mass of Container W1 (g)

Mass of Dry Soil W3 - W1 (g)

MOISTURE CONTENT Wc = W2 - W3 x 100 (%)


W3 - W1

Avg. MOISTURE CONTENT w (%)

Sample Location (Chainage / Borrow Pit No.)* :

Date of Test

Sample No.

Specimen No.

Container No.

Mass of Wet Soil + Container W2 (g)

Mass of Dry Soil + Container W3 (g)

Mass of Moisture W2 - W3 (g)

Mass of Container W1 (g)

Mass of Dry Soil W3 - W1 (g)

MOISTURE CONTENT Wc = W2 - W3 x 100 (%)


W3 - W1

Avg. MOISTURE CONTENT w (%)

Sample Location (Chainage / Borrow Pit No.)* :

Date of Test

Sample No.

Specimen No.

Container No.

Mass of Wet Soil + Container W2 (g)

Mass of Dry Soil + Container W3 (g)

Mass of Moisture W2 - W3 (g)

Mass of Container W1 (g)

Mass of Dry Soil W3 - W1 (g)

MOISTURE CONTENT Wc = W2 - W3 x 100 (%)


W3 - W1

Avg. MOISTURE CONTENT w (%)

Tested by : Witnessed by :

( ) ( )
Date : / / Date : / /

* Select as appropriate
Contractor / Turnkey Contractor *: Project :

Consulting Engineer/Engineer/S.O.R *
Contract No. :

ATTERBERG LIMIT (CASAGRANDE METHOD ) Date of Test : / /


BS 1377 : Part 2 : 1990 (Cl. 4.5)

Material Tested For : Road Section : Test No. : LL/PI/ /(sample ref. no.)

Sample Location (Chainage / Depth / Borrow Pit No. / Stock Pile No.) * :

Soil Description : Sample Ref. No :

Specimen No. 1 2 3
Container No. SPECIFICATION LIMITS :-
Mass of Wet Soil + Container (w2) g
Plastic Limit

Mass of Dry Soil + Container (w3) g L. L. - %


Mass of Container (w1) g
Mass of Dry Soil (w3 - w1) g P. I. -
Mass of Moisture (w2 - w3) g
Moisture Content (w2 - w3) x 100 %
(w3 - w1)
Average MOISTURE CONTENT %

Specimen No. 4 5 6 7 8
Number of Bumps
Liquid Limit

Container No.
Mass of Wet Soil + Container (m2) g
Mass of Dry Soil + Container (m3) g
Mass of Container (m1) g
Mass of Dry Soil (m3 - m1) g
Mass of Moisture (m2 - m3) g
MOISTURE CONTENT (m2 - m3) x 100 %
(m3 - m1)

Sample Preparation
(Delete / Identify as appropriate)
l
As received:
MOISTURE CONTENT %

l Air Dried at: °C

l Oven Dried at : °C

l Washed on 425 µm sieve :

l Proportion retained on 425 µm sieve:

%
l

Test Results
LL %

%
PL
10 15 20 25 30 # 50
PI
NUMBER OF BUMPS

Remarks :

Tested by : Signature :
( )
Name :
Witnessed by : Laboratory Technician
( )
Date : / /
* Select as appropriate
Contractor / Turnkey Contractor *: Project

Consulting Engineer/Engineer/S.O.R * Contract No. :

LIQUID LIMIT & PLASTIC LIMIT TEST (CONE PENETROMETER TEST)


B. S 1377 : Part 2 : 1990

Material Tested For : Date of Test : / /

Road Section : Test No. : LL/PI/ /(sample ref. no.)

Sample Location (Chainage / Depth / Borrow Pit No. / Stock Pile No) * :

Soil Description : Sample Ref. No :

PLASTIC LIMIT -
Specimen No. 1 2 3 4
Container No.
Mass of Wet Soil + Container (w2) g
Mass of Dry Soil + Container (w3) g
Mass of Container (w1) g
Mass of Moisture (w3 - w1) g
Mass of Dry Soil [(w2 - w3) / (w3 - w1)] x 100 g
Moisture Content %
AVERAGE MOISTURE CONTENT %

LIQUID LIMIT -
Specimen No. 5 6 7 8
Initial dial gauge reading mm
Final dial gauge reading mm
Cone Penetration mm
Average Penetration mm
Container No.
Mass of Wet Soil + Container (m2) g
Mass of Dry Soil + Container (m3) g
Mass of Container (m1) g
Mass of Moisture (m2 - m3) g
Mass of Dry Soil (m3 - m1) g
Moisture Content [(m2 - m3) / (m3 - m1)] x 100 %

LIQUID LIMIT : % Specification Limits :- Sample Preparation


PLASTIC LIMIT : % L. L. : (Delete / Identify as appropriate)
PLASTICITY INDEX : P. I. :
l As received:

28.00 l Air Dried at: °C

26.00 # # # # # # # # # l Oven Dried at : °C

24.00 l Washed on 425 µm sieve :

l Proportion retained on 425 µm sieve:


22.00
%
Penetration of Cone (mm)

20.00
Tested & Witnessed by :

1.
18.00 ( )

2..

16.00 ( )

14.00
Signature :

Name :
12.00
Laboratory Technician
Moisture Content (%)
Date : / /

* Select as appropriate
Contractor / Turnkey Contractor *: Project

Consulting Engineer/Engineer/S.O.R * Contract No.

Date of Test : / /
C. B. R. TEST (4-Days Soaked Test)
BS 1377 : Part 4 : 1990 {Cl. 7.2 (method-3 ) 7.3, 7.4, 7.5 & 7.6}

Test No. : CBR/ /(sample ref. no.)


Material Tested For : Road Section :

Sample Location (Chainage / Offset / Depth / Borrow Pit No. / Stock Pile No.) :*

Soil Description : Sample Ref. No :

SPECIMEN PREPARATION : 4.5 kg Rammer Method (Manual / Mechanical) / Vibrating Hammer Method* Result of BS Compaction Test :
* Target moisture content: % (as identified previously in Test No. ) (Using CBR mould with 62 nos. of blows/layer)
* Compaction effort : No. of blows / layer= (as identified previously in Test No. ) M.D.D. : Mg/m³
No. of layers = O.M.C. : %

BEFORE SOAKING
DENSITY MOISTURE CONTENT Top face Bottom face
Mould No. Container No.
Mass of Mould + Base + Compacted Soil (m2) g Mass of Wet Soil + Container (w2) g
Mass of Mould + Base (m1) g Mass of Dry Soil + Container (w3) g
Mass of Compacted Soil (m2 - m1) g Mass of Container (w1) g
Volume of (CBR) Mould (v) cm³ Mass of Moisture (w2 - w3) g
Bulk Density of Soil [P = (m2 - m1) / v] Mg/m³ Mass of Dry Soil (w3 - w1) g
Av. Moisture Content (w) % Moisture Content [(w2 - w3) / (w3 - w1)] x 100 %
Dry Density of Soil [Pd = 100 P/(100 + w)] Mg/m³ Av. Moisture Content w %
4- DAYS SOAKED CBR TEST : Proving Ring Constant : kN/Div
Penetration of Gauge Reading Gauge Reading Force on Plunger
Force on Plunger (kN)
plunger (Div) Penetration of plunger (mm) (Div) (kN) l
Dry Density of the specimen
(mm) Top Bottom Top Bottom Top Bottom Top Bottom Mg/m³

0 4.00

0.25 4.25 l
Specimen compacted to :
0.50 4.50 % of
0.75 4.75
MDD of sample
1.00 5.00
1.25 5.25
1.50 5.50
1.75 5.75
2.00 6.00 From the graph
2.25 6.25 (after corrections if appropriate)
2.50 6.50 CBR Values at penetrations of :
2.75 6.75 2.5 mm 5.0 mm
3.00 7.00 Top face (%)
3.25 7.25 Bottom face (%)

3.50 7.50
Accepted CBR Value : %
3.75

EXPANSION & ABSORPTION DETERMINATION :

Surcharge (if applied) : kg Remarks:


Gauge reading before soaking : mm
Gauge reading after soaking : mm
Final swell : mm
Mass of Mould + Base + Specimen (before soaking)m2 : g
Mass of Mould + Base + Specimen (after soaking) m3 : g
Mass of Water Absorption (m3 - m2) : g
( %)

Tested & Witnessed by : Signature :

Name :
Laboratory Technician
1. ; 2.
( ) ( ) Date : / /
* Select as appropriate

Format Rev. No. : 0


Computer ref.: C:/A-c-2/ISO/QC Forms/QC-07(a) CBR Test Minsar/QC/07(a)
Contractor / Turnkey Contractor *: Project :

Consulting Engineer/Engineer/S.O.R * Contract No.:

Date of Test : / /
C. B. R. TEST (4-Days Soaked Test) - Graph
BS 1377 : Part 4 : 1990 {Cl. 7.2 (method-3 ) 7.3, 7.4, 7.5 & 7.6}

Test No. : CBR/ /(sample ref. no.)


Material Tested For: / Road Section :

Sample Location (Chainage / Offset / Depth / Borrow Pit No. / Stock Pile No.) *:

Soil Description : Sample Ref. No :

Dry Density of the Specimen: Mg/m³( % of M.D.D. of sample) Moisture Content of the Specimen : %

1 2 3 4 5 6 7 8 9 # # # # # # # # # # # # # # #
TEST RESULT CURVES OF TOP & BOTTOM FACES OF SPECIMEN
1 2 3 4 5 6 7
Force on Plunger (kN)

0 1 2 3 4 5 6 7
Penetration of Plunger (mm)

Top Face Bottom Face


Calculations : Penetration of
(after corrections if plunger Force Std. Force (kN) Force Std. Force (kN)
CBR Value CBR Value
appropriate) (kN) (100% CBR) (kN) (100% CBR)
2.5 mm 13.2 ( /13.2) x 100 = % 13.2 ( /13.2) x 100 = %

5.0 mm 20 ( /20.0) x 100 = % 20 ( /20.0) x 100 = %

Remarks :

Tested By : Signature :
( )
Name :
Witnessed By : Laboratory Technician
( ) Date : / /

* Select as appropriate
Contractor / Turnkey Contractor *: Project :

Consulting Engineer/Engineer/S.O.R * Contract No.:

STANDARD COMPACTION TEST Date of Test : / /


BS 1377 : Part 4 : 1990 (Cl. 3.5 & 3.6 - 4.5kg Rammer Method/Cl. 3.7 - Vibrating Hammer Method)*

Material Tested For : / Road Section : Test No.: MDD/ /(sample ref. no.)

Sample Location (Chainage / Borrow Pit No. / Depth / Stock Pile No.) * :

Soil Description : Sample Ref. No :

Specimen No. 1 2 3 4 5

DENSITY :
Amount of Water Added ml
Mass of Mould + Base + Compacted Soil (m2) g
Mass of Mould + Base (m1) g
Mass of Compacted Soil (m2 - m1) g
Volume of Mould (1.0 litre / CBR)* (v) cm³
BULK DENSITY OF SOIL [P = (m2 - m1) / v) Mg/m³

MOISTURE CONTENT :
Container No.
Mass of Wet Soil + Container (w2) g
Mass of Dry Soil + Container (w3) g
Mass of Moisture (w2 - w3) g
Mass of Container (w1) g
Mass of Dry Soil (w3 - w1) g
(w2 - w3) x 100
Moisture Content %
(w3 - w1)
Average MOISTURE CONTENT (w) %
DRY DENSITY OF SOIL [Pd = 100 P/(100 + w)] Mg/m³

0 5 # 1. # # # 1
0 1 2 3 4 5 6 7
0 5 # # # # #
DRY DENSITY Mg/m3

0.0 5.0 10.0 15.0 20.0 25.0 30.0


MOISTURE CONTENT (%)

SPECIMEN PREPARATION :
No. of blows / layer = ; No. of layers = MAX. DRY DENSITY (MDD) = Mg/m³
Initial sample mass = OPTIMUM MOISTURE CONTENT (OMC) = %
Mass retained on (20mm / 37.5mm) * sieve= g ( %)

Remarks :

Signature :

Name :
Tested by : ( ) Laboratory Technician

Witnessed by : ( ) Date : / /

* Select as appropriate

You might also like