QC Forms For Earthworks
QC Forms For Earthworks
Consulting Engineer/Engineer/S.O.R *
Contract No. :
(EARTH WORKS / PAVEMENT WORKS / DRAINAGE WORKS / STRUCTURAL WORKS / OTHER WORKS)*
To : RESIDENT ENGINEER
We request for inspection and permission to proceed with the following work;
Time : Date : / /
Name :
Comments :-
Survey & Setting Out : Inspection of Prior Work : Testing of Prior Work :
To : CONTRACTOR's REPRESENTATIVE
Remarks :
Time : Date : / /
Signature :
Contractor's Representative
Neither the endorsement of this Form nor anything written on it is intended to convey final
Time : Date : / / approval for any part of the Works, nor does it relieves the Contractor of his responsibility to
comply with the quality requirements of the Works.
* select as appropriate
Contractor / Turnkey Contractor *: Project :
Consulting Engineer/Engineer/S.O.R *
Contract No. :
CHECKS DONE
WORK / OPERATION DATE & COMMENTS
INSPECTED TIME (Deficiencies, Degree of Completion,
1 2 3 4 5 6 7 8 9 10
Weather, others)
Ref : Approval Chit No
5. LABOUR 10.
Date :
* Select as appropriate
Contractor / Turnkey Contractor *: Project :
1)
Consulting Engineer/Engineer/S.O.R *
Contract No. :
Works Item & Type of Test During the Passed Failed Remarks
reporting Previously Total (During the Reporting
period Period)
EMBANKMENT FILL BELOW TOP 300mm :
Lab Tests : * Gradation Analysis
* Atterberg Limit (Casagrande Method)
* C. B. R. (4-Days Soaked Test)
(for the top 0.7m of fill)
* Std. Compaction Test (BS 1377:1990)
Field Tests : * Field Density Test (Sand Replacement Method)
TOP 300mm SUBGRADE (for Cut & Fill) :
Lab Tests : * Gradation Analysis
* Atterberg Limit (Casagrande Method)
* C. B. R. (4-Days Soaked Test)
* Std. Compaction Test (BS 1377:1990)
Field Test : * Field Density Test (Sand Replacement Method)
SUB-BASE :
Lab Tests : * Gradation Analysis
* Atterberg Limit (Casagrande Method)
* C. B. R. (4-Days Soaked Test)
* Aggregate Crushing Value
* Std. Compaction Test (BS 1377:1990)
Field Test : * Field Density Test (Sand Replacement Method)
ROAD BASE :
Lab Tests : * Gradation Analysis
* Atterberg Limit (Casagrande Method)
* C. B. R. (4-Days Soaked Test)
* Sodium Sulphate Soundness Test
* Aggregate Crushing Value
* Flakiness Index
* Std. Compaction Test (BS 1377:1990)
Field Test : * Field Density Test (Sand Replacement Method)
ASPHALTIC CONCRETE FOR PAVEMENT COURSES : ACBC ACWC ACBC ACWC ACBC ACWC ACBC ACWC ACBC ACWC
Date of Test
Sample No.
Specimen No.
Container No.
Date of Test
Sample No.
Specimen No.
Container No.
Date of Test
Sample No.
Specimen No.
Container No.
Tested by : Witnessed by :
( ) ( )
Date : / / Date : / /
* Select as appropriate
Contractor / Turnkey Contractor *: Project :
Consulting Engineer/Engineer/S.O.R *
Contract No. :
Material Tested For : Road Section : Test No. : LL/PI/ /(sample ref. no.)
Sample Location (Chainage / Depth / Borrow Pit No. / Stock Pile No.) * :
Specimen No. 1 2 3
Container No. SPECIFICATION LIMITS :-
Mass of Wet Soil + Container (w2) g
Plastic Limit
Specimen No. 4 5 6 7 8
Number of Bumps
Liquid Limit
Container No.
Mass of Wet Soil + Container (m2) g
Mass of Dry Soil + Container (m3) g
Mass of Container (m1) g
Mass of Dry Soil (m3 - m1) g
Mass of Moisture (m2 - m3) g
MOISTURE CONTENT (m2 - m3) x 100 %
(m3 - m1)
Sample Preparation
(Delete / Identify as appropriate)
l
As received:
MOISTURE CONTENT %
l Oven Dried at : °C
%
l
Test Results
LL %
%
PL
10 15 20 25 30 # 50
PI
NUMBER OF BUMPS
Remarks :
Tested by : Signature :
( )
Name :
Witnessed by : Laboratory Technician
( )
Date : / /
* Select as appropriate
Contractor / Turnkey Contractor *: Project
Sample Location (Chainage / Depth / Borrow Pit No. / Stock Pile No) * :
PLASTIC LIMIT -
Specimen No. 1 2 3 4
Container No.
Mass of Wet Soil + Container (w2) g
Mass of Dry Soil + Container (w3) g
Mass of Container (w1) g
Mass of Moisture (w3 - w1) g
Mass of Dry Soil [(w2 - w3) / (w3 - w1)] x 100 g
Moisture Content %
AVERAGE MOISTURE CONTENT %
LIQUID LIMIT -
Specimen No. 5 6 7 8
Initial dial gauge reading mm
Final dial gauge reading mm
Cone Penetration mm
Average Penetration mm
Container No.
Mass of Wet Soil + Container (m2) g
Mass of Dry Soil + Container (m3) g
Mass of Container (m1) g
Mass of Moisture (m2 - m3) g
Mass of Dry Soil (m3 - m1) g
Moisture Content [(m2 - m3) / (m3 - m1)] x 100 %
20.00
Tested & Witnessed by :
1.
18.00 ( )
2..
16.00 ( )
14.00
Signature :
Name :
12.00
Laboratory Technician
Moisture Content (%)
Date : / /
* Select as appropriate
Contractor / Turnkey Contractor *: Project
Date of Test : / /
C. B. R. TEST (4-Days Soaked Test)
BS 1377 : Part 4 : 1990 {Cl. 7.2 (method-3 ) 7.3, 7.4, 7.5 & 7.6}
Sample Location (Chainage / Offset / Depth / Borrow Pit No. / Stock Pile No.) :*
SPECIMEN PREPARATION : 4.5 kg Rammer Method (Manual / Mechanical) / Vibrating Hammer Method* Result of BS Compaction Test :
* Target moisture content: % (as identified previously in Test No. ) (Using CBR mould with 62 nos. of blows/layer)
* Compaction effort : No. of blows / layer= (as identified previously in Test No. ) M.D.D. : Mg/m³
No. of layers = O.M.C. : %
BEFORE SOAKING
DENSITY MOISTURE CONTENT Top face Bottom face
Mould No. Container No.
Mass of Mould + Base + Compacted Soil (m2) g Mass of Wet Soil + Container (w2) g
Mass of Mould + Base (m1) g Mass of Dry Soil + Container (w3) g
Mass of Compacted Soil (m2 - m1) g Mass of Container (w1) g
Volume of (CBR) Mould (v) cm³ Mass of Moisture (w2 - w3) g
Bulk Density of Soil [P = (m2 - m1) / v] Mg/m³ Mass of Dry Soil (w3 - w1) g
Av. Moisture Content (w) % Moisture Content [(w2 - w3) / (w3 - w1)] x 100 %
Dry Density of Soil [Pd = 100 P/(100 + w)] Mg/m³ Av. Moisture Content w %
4- DAYS SOAKED CBR TEST : Proving Ring Constant : kN/Div
Penetration of Gauge Reading Gauge Reading Force on Plunger
Force on Plunger (kN)
plunger (Div) Penetration of plunger (mm) (Div) (kN) l
Dry Density of the specimen
(mm) Top Bottom Top Bottom Top Bottom Top Bottom Mg/m³
0 4.00
0.25 4.25 l
Specimen compacted to :
0.50 4.50 % of
0.75 4.75
MDD of sample
1.00 5.00
1.25 5.25
1.50 5.50
1.75 5.75
2.00 6.00 From the graph
2.25 6.25 (after corrections if appropriate)
2.50 6.50 CBR Values at penetrations of :
2.75 6.75 2.5 mm 5.0 mm
3.00 7.00 Top face (%)
3.25 7.25 Bottom face (%)
3.50 7.50
Accepted CBR Value : %
3.75
Name :
Laboratory Technician
1. ; 2.
( ) ( ) Date : / /
* Select as appropriate
Date of Test : / /
C. B. R. TEST (4-Days Soaked Test) - Graph
BS 1377 : Part 4 : 1990 {Cl. 7.2 (method-3 ) 7.3, 7.4, 7.5 & 7.6}
Sample Location (Chainage / Offset / Depth / Borrow Pit No. / Stock Pile No.) *:
Dry Density of the Specimen: Mg/m³( % of M.D.D. of sample) Moisture Content of the Specimen : %
1 2 3 4 5 6 7 8 9 # # # # # # # # # # # # # # #
TEST RESULT CURVES OF TOP & BOTTOM FACES OF SPECIMEN
1 2 3 4 5 6 7
Force on Plunger (kN)
0 1 2 3 4 5 6 7
Penetration of Plunger (mm)
Remarks :
Tested By : Signature :
( )
Name :
Witnessed By : Laboratory Technician
( ) Date : / /
* Select as appropriate
Contractor / Turnkey Contractor *: Project :
Material Tested For : / Road Section : Test No.: MDD/ /(sample ref. no.)
Sample Location (Chainage / Borrow Pit No. / Depth / Stock Pile No.) * :
Specimen No. 1 2 3 4 5
DENSITY :
Amount of Water Added ml
Mass of Mould + Base + Compacted Soil (m2) g
Mass of Mould + Base (m1) g
Mass of Compacted Soil (m2 - m1) g
Volume of Mould (1.0 litre / CBR)* (v) cm³
BULK DENSITY OF SOIL [P = (m2 - m1) / v) Mg/m³
MOISTURE CONTENT :
Container No.
Mass of Wet Soil + Container (w2) g
Mass of Dry Soil + Container (w3) g
Mass of Moisture (w2 - w3) g
Mass of Container (w1) g
Mass of Dry Soil (w3 - w1) g
(w2 - w3) x 100
Moisture Content %
(w3 - w1)
Average MOISTURE CONTENT (w) %
DRY DENSITY OF SOIL [Pd = 100 P/(100 + w)] Mg/m³
0 5 # 1. # # # 1
0 1 2 3 4 5 6 7
0 5 # # # # #
DRY DENSITY Mg/m3
SPECIMEN PREPARATION :
No. of blows / layer = ; No. of layers = MAX. DRY DENSITY (MDD) = Mg/m³
Initial sample mass = OPTIMUM MOISTURE CONTENT (OMC) = %
Mass retained on (20mm / 37.5mm) * sieve= g ( %)
Remarks :
Signature :
Name :
Tested by : ( ) Laboratory Technician
Witnessed by : ( ) Date : / /
* Select as appropriate