JOB ANALYSIS
• Methods analysis is used to redesign
or improve existing jobs. An analyst
will study an existing job to
determine if the work is being done in
Figure 4. Worker-Machine Chart
MOTION STUDY
Figure 3. Process Flowchart of Copying Job • The study of the individual human
motions used in a task. The purpose
WORKER-MACHINE CHART of motion study is to make sure that a
• A worker-machine chart illustrates job task does not include any
the amount of time a worker and a unnecessary motion by the worker
machine are working or idle in a job. and to select the sequence of
This type of chart is occasionally motions that ensure that the task is
used in conjunction with a process being performed in the most efficient
flowchart when the job process way.
includes equipment or machinery.
The worker- machine chart shows if • Motion study originated with Frank
the worker's time and the machine Gilbreth, a colleague of F. W. Taylor's
time are being used efficiently that is, at the beginning of the twentieth
if the worker or machine is idle an century. F. W. Taylor's approach to
excessive amount of time. the study of work methods was to
select the best worker among a group
of workers and use that worker's
methods as the standard by which
other workers were trained.
Alternatively, Gilbreth studied many
workers and from among them
picked the best way to perform each
activity. Then he combined these
elements to form the "one best way"