CrossMark User Manual
CrossMark User Manual
Launch the “SYSmarkNG” application to get this Dashboard page on the screen.
Dashboard Page 2
1 3
5 6 7
9 10 11
2 3
1. Process icon – This icon represents the process performed in the background.
2. Status message – This text informs the user about the process running in the background. The
processes running in the background includes getting system information, copying & validating of input
files, running each scenario workloads, validating output files and generation of scores & PDF.
3. Iteration number – This text informs the user about the current running iteration.
4. Progress bar – Progress bar indicates the progress of the benchmark run as each underlying process
advances. It starts at 0% and ends at 100%.
5. Cancel button – User is given the control to cancel the benchmark at any stage of the run.
Settings GUI Screen
Clicking Settings button takes user to settings screen as below
1. Project name: Name of the project. This is an auto populated string based on number of previously ran
projects.
2. Number of Iterations: Number of iterations to be ran. This number ranges from 1 – 50. User clicks +/-
buttons to increase or decrease the iteration number.
Default value is 1.
3. Productivity: Determines whether productivity scenario should be included in the run. This could be set
to on or off. When set to “on” productivity scenario is included in the run.
Default value is On.
4. Creativity: Determines whether creativity scenario should be included in the run. This could be set to
on or off. When set to “on” creativity scenario is included in the run.
Default value is On.
5. Responsiveness: Determines whether Responsiveness scenario should be included in the run. This
could be set to on or off. When set to “on” Responsiveness scenario is included in the run.
Default value is On.
6. Conditioning Run: When set to “on” performs conditioning run. Could be set to on or off state.
Default value is On.
Submit Results Page