0% found this document useful (0 votes)
214 views

EWM QM Integration SR

The document outlines the steps to complete the SAP EWM-QM acceptance process, including creating a purchase order and inbound delivery, unloading and quality inspection tasks, and final put away of materials. It provides detailed instructions on navigating specific transaction codes for each step.

Uploaded by

srinu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
214 views

EWM QM Integration SR

The document outlines the steps to complete the SAP EWM-QM acceptance process, including creating a purchase order and inbound delivery, unloading and quality inspection tasks, and final put away of materials. It provides detailed instructions on navigating specific transaction codes for each step.

Uploaded by

srinu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 14

0

SAP EWM-QM ACCEPTANCE


PROCESS
ROHELA TECH IT SOLUTIONS PVT LTD
SAP EWM-QM ACCEPTANCE PROCESS

1.Create Purchase Order

T-Code: ME21N

 Input all the details and click on Save.

 Purchase order Created.

2.Create Inbound Delivery with reference to Purchase Order

T-Code: VL31N

 Enter to go for Next Screen.

ROHELA TECH IT SOLUTIONS PVT LTD 1


SAP EWM-QM ACCEPTANCE PROCESS

 Click on Pack icon to Pack the product into a Handling Unit and Click on
Save to Create the Inbound Delivery.

 Input Packaging Material and Hit Enter to Create Handling Unit.

 Select both the Handling Unit line item and Product line item and click
on Pack to pack the Product into the Handling Unit.

ROHELA TECH IT SOLUTIONS PVT LTD 2


SAP EWM-QM ACCEPTANCE PROCESS

 Material is Packed, save the document to Create Inbound Delivery.

 Inbound Delivery is Created and Distributed to EWM.


3.Create Unloading Task

T-Code: /N/SCWM/PRDI

 Select the line item and click on Inbound Delivery Follow up


ActionsWarehouse Task

ROHELA TECH IT SOLUTIONS PVT LTD 3


SAP EWM-QM ACCEPTANCE PROCESS

 Select the line item and click on Create + Save to Create Unloading
Warehouse Task.

4.Confirm Unloading Task in RFUI

T-Code: /N/SCWM/RFUI

 Click on 03-Inbound Processes

ROHELA TECH IT SOLUTIONS PVT LTD 4


SAP EWM-QM ACCEPTANCE PROCESS

 Click on 01-Unloading.

 Click on 01-Unloading by Delivery.

 Input Inbound Delivery and Hit Enter to go to next screen.

ROHELA TECH IT SOLUTIONS PVT LTD 5


SAP EWM-QM ACCEPTANCE PROCESS

 Click on F1-List to check number of Handling Unit for the Delivery

 Input 1 in Box and Hit Enter.

 Hit Enter to go to Next Screen.

ROHELA TECH IT SOLUTIONS PVT LTD 6


SAP EWM-QM ACCEPTANCE PROCESS

 Scan the Destination bin and Hit Enter.

 Click on F1-Yes to Completed Unloading.

 System has created Quality Inspection Task to move the Handling Unit
from GR-ZONE to Quality Inspection Work-Center as you can see in the
above Monitor Screen.

ROHELA TECH IT SOLUTIONS PVT LTD 7


SAP EWM-QM ACCEPTANCE PROCESS

5.Confirm Quality Inspection Task

T-Code: /N/SCWM/RFUI

 Click on 02- Manual Selection

 Click on 02-Selection by HU

 Input the Handling Unit and Hit Enter to go to Next Screen.

ROHELA TECH IT SOLUTIONS PVT LTD 8


SAP EWM-QM ACCEPTANCE PROCESS

 Scan the Destination data and Hit Enter to Complete Movement.

6.Quality Inspection in Work-Center

T-Code: /N/SCWM/QINSP_S4

 Input the Details and Click on Execute.

 Select the line item and click on Mass Inspection.

ROHELA TECH IT SOLUTIONS PVT LTD 9


SAP EWM-QM ACCEPTANCE PROCESS

 Input Decision as I am using A1 for Full Accepance and click on Trigger


Follow up Actions and click on Continue.

 Click on Close HU to Complete the Handling Unit.

 Handling Unit is Completed, Click on Save.

ROHELA TECH IT SOLUTIONS PVT LTD 10


SAP EWM-QM ACCEPTANCE PROCESS

 Click on Save to Complete Quality Inspection for Handling Unit so that


system can Create Put away Task.

 You can see system has created Put away task to Final bin.

7.Put away by HU

T-Code: /N/SCWM/RFUI

 Click on 03-Inbound Process

ROHELA TECH IT SOLUTIONS PVT LTD 11


SAP EWM-QM ACCEPTANCE PROCESS

 Click on 03-Put away.

 Click on 01-Put away by HU.

 Input Handling Unit and Hit Enter.

ROHELA TECH IT SOLUTIONS PVT LTD 12


SAP EWM-QM ACCEPTANCE PROCESS

 Scan the Destination Data and Hit Enter.

 Put Away is Completed as you can see in the above screen.

ROHELA TECH IT SOLUTIONS PVT LTD 13

You might also like