FS-04 - EXL Iloilo - FM 200 Miscellaneous Details 2
FS-04 - EXL Iloilo - FM 200 Miscellaneous Details 2
A E
G L
E E
N A
T S
E
SLAB
RELEASING
POST-RELEASE
ALM1 ALM1
ALM2
WF/ALM3
ALM2
WF/ALM3
ARC1 TBL
SYSTEM ALM
8 8 8
ARC2 TBL
COUNTDOWN TIMER (SECS)
MAN REL MAN REL SYSTEM TBL
ABORT ABORT NAC1 TBL SYSTEM SUP
SUP1 SUP1 TBL NAC2 TBL PSU TBL
SUP2 SUP2 TBL NAC3 TBL GROUND TBL ACKNOWLEDGE SIGNAL SYSTEM OUTPUT
(HOLD FOR SILENCE RESET DISABLE
LAMP TEST)
℄
FENWAL 732
DOOR OUTSIDE
MPS ABORT
FLOORING LINE
SMOKE DETECTOR INSTALLATION DETAILS
@ ROOM SPACE W/ CEILING
FM-200 CONTROL PANEL ELEVATION DETAILS FM-200 DEVICES ELEVATION DETAILS
CEILING LINE CEILING LINE CEILING LINE CEILING LINE CEILING LINE
℄
CONTROL PANEL
483
ABORT
MPS
114
STATION
120
UTILITY BOX SQUARE BOX
2300
2300
SMOKE DETECTOR INSTALLATION DETAILS
@ ROOM SPACE W/O CEILING
1200
1200
FFL FFL FFL
FFL FFL
PROPOSED
PROJECT TITLE: OWNER CAD BY: TITLE: SCALE: SHEET NO.:
N.LAMALAN
PETER L. WEE EXL SERVICE PHILIPPINES INCORPORATED
PROFESSIONAL ELECTRONICS ENGINEER
Authorized Signatory
CHECKED BY: FM-200 MISCELLANEOUS
AS FS-04
REG. NO.: 0319 TIN: 103-932-386
EXL ILOILO 12F SM STRATA OFFICE FIT-OUT MARILOU COMIA DETAILS 2/2
PTR:
PLACE:
8547022
MAKATI CITY
DATE: 11-JAN.2021
LOCATION: 12F SM STRATA, MANDURRIAO, ILO-ILO CITY, PHILIPPINES SAVP, COMMERCIAL-COMPLIANCE DATE: AUG. 11, 2021 SHOWN