0% found this document useful (0 votes)
22 views

Form 447 Navigation Checklist-3 Dec 2018

This navigating bridge checklist is a pre-departure checklist that the master and officer of the watch must review and check off items on before departing. The checklist ensures that key ship systems like steering, engines, and bridge equipment have been tested and are operational, communication has been checked, draft requirements have been reviewed, crew and tugs if needed are ready, and the master and officer of the watch have exchanged information. Upon completing the checklist, both the master and officer of the watch must sign the deck logbook.

Uploaded by

adel belkacem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views

Form 447 Navigation Checklist-3 Dec 2018

This navigating bridge checklist is a pre-departure checklist that the master and officer of the watch must review and check off items on before departing. The checklist ensures that key ship systems like steering, engines, and bridge equipment have been tested and are operational, communication has been checked, draft requirements have been reviewed, crew and tugs if needed are ready, and the master and officer of the watch have exchanged information. Upon completing the checklist, both the master and officer of the watch must sign the deck logbook.

Uploaded by

adel belkacem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Shell International Trading and Shipping Company Limited

Navigating Bridge Checklist No 3

Pre-Departure Checklist (Nav Manual 3.8.3)


Checklist to be read by Master and responded to by OOW

) PASSAGE PLAN...............................................................................REVIEWED 
) STEERING GEAR.........................................................TESTED/TIMING NOTED 
) MAIN ENGINES....................................................................................TESTED 
) BRIDGE EQUIPMENT........................................................................CHECKED 
) COMMUNICATION...........................................................................CHECKED 
) UKC/AIR-DRAFT REQUIREMENTS ....................................................CHECKED 
) PILOT/MASTER INFO EXCHANGE CARD................................................READY 
) CREW....................................................................................................READY 
) ENGINE ROOM TEAM READY FOR STANDBY...............................CONFIRMED 
) TUGS (IF APPLICABLE)...........................................................................READY 
Note: Master and OOW to sign in DOL after completion of Pre-Departure Procedure
and Checklist

  Checklist Completed  

STASCO-STS/2: REPORTING & RECORDING MANUAL DECEMBER 2018


FORM 447 PAGE 1 OF 1

You might also like