Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
19 views
TRW Systems Group
PDF de la TRW sur Apollo 11
Uploaded by
Paul Cultrera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save TRW Systems Group For Later
Download
Save
Save TRW Systems Group For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
19 views
TRW Systems Group
PDF de la TRW sur Apollo 11
Uploaded by
Paul Cultrera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save TRW Systems Group For Later
Carousel Previous
Carousel Next
Save
Save TRW Systems Group For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 49
Search
Fullscreen
Read> sew, APOLLO Il TAW INC. - ONE SPACE PARK - REDONDO BEACH, CALIFORNIA 90278 - TELEPHONE 213/679-8711 (Cape) ‘Tom Branigan, Bob Lander, July 1, 1969 Mike Steinman (30S) 783-9441 oa (Houston) Ben Gillespie, Bob Lander, Hank Litten (713) 591-3133,ext. 2611 or JIPC (713) 488-5472 (Los Angeles) Hank Litten, Mike Steinman (213) 679-8711 ,ext. 65647 ONCE UPON A TIME THERE WAS THIS MILKWAGON THAT THOUGHT IT WAS A LUNAR MODULE . HOUSTON, Texas -- Somewhere at the Manned Spacecraft Center there is a group of NASA test engineers sure to win an "excellent" on their cost effectiveness rating for using an old walk-in panel truck as a substitute for a new lunar module. The requirement was for a dynamic platform -- that's something moveable -- for the testing of the Lunar Module's Abort Guidance System (AGS). (The AGS is the backup guidance system which permits the LM astronauts to take over control of the vehicle, abort the mission, and rendezvous with the Command Service Module. Only, of course, if the primary guidance system should develop a malfunction.) AGS was designed and built by TRN's Systens Group for Grumman Aircraft Engineering Corporation, Lunar Module prime contractor, Naturally the ultimate test is in space, but for the AGS then it was a case of riding before it flew. And AGS needed a vehicle which could house several racks of test equipment, although it occupies 3 cubic feet in the real lunar module. Test engineers combed the NASA motor pool for an answer. The milk- wagon-like walk-in van fulfilled the specifications except that it couldn't fly. But it could walk forvard and backwards, right and left, and that was sufficient for the tests required.Once Upon A Time There Was This Milkwagon Page 2 ‘That Thought It Was A Lunar Module . ‘TRW, which designed and built the AGS for the Apollo program, helped even further by supplying a refurbished quality test model of the AGS for the low budget test program and the software. Numerous tests were conducted, and computer programming and targeting were checked out on Houston's streets before similar programs were designed for the lunar Landing ‘Thus was born what NASA acronamed the MISER progran for Mobile Inertial Sensor Evaluation Rogatory. Rogatory? Look that one up in your Funk and Wagnalls. It means information seeking. And that MISER did on a bare bones budget. = 30-few, APOLLO II TRW INC. » ONE SPACE PARK - REDONDO BEACH. CALIFORNIA 90278 » TELEPHONE 213/679-8711 (Los Angeles) Hank Litten, Mike Steinman, (213) 679-8711, ext. 65647 Sean (Cape) Tom Branigan, Bob Lander, Mike uly 1 1969 Steinman - (305) 783-9441 (Houston) Ben Gillespie, Hank Litten, Tom. Branigan, Bob Lander - (713) 591-3133, ext. 2611, or JIPC (713) 488-5472 LUNAR LANDING ALREADY ACCOMPLISHED --VIA COMPLEX COMPUTER SIMULATIONS HOUSTON, Texa computer simulations. Apollo already has landed on the Moon--at least in It has been there hundreds of times via "Flights" on high-speed computers conducted and developed in cooperation with the NASA Manned Spacecraft Center by TRW Inc., at the Redondo Beach, California, headquarters and Houston Operations of TRW's Systems Group. One of its major tasks for the Apollo program has been assisting NASA in the design and development of spacecraft trajectories, simulating and evaluating these trajectories to come up with the best route to the lunar surface and back within the many limitations imposed by launch windows, launch vehicle, spacecraft, communications, and tracking systems capabilities. One computer simulation TRW developed for the Apollo program incorporates mathematical models of all the subsystems of the Apollo spacecraft, together with elements to compute their significant interactions (such as when the fuel cells generate power they also produce water which goes into the water management system). ‘The functioning of spacecraft's environmental control system, for example, is affected by the position of the sun relative to the spacecraft radiators; this means that the program must provide the attitude of the spacecraft in relation to the sun and, from that, the solar heat changes on the radiators are computed. Communications capabilities for the several communication links with earth are also calculated at each point in time.Lunar Landing Already Accomplished ... Page 2 ‘The purpose of this TRW program is primarily to monitor the state of critical values and operations during the mission. These include fuel and oxygen remaining in the tanks, cabin and suit temperature, electrical power available, and others, in addition to the communication requirements mentioned earlier. By running the program through an Apollo lunar landing mission, it is possible to determine whether the spacecraft and its subsystems are, in fact, capable of performing the mission without exceeding allowable limits or running out of some consumables, euch as oxygen, electrical power or propellants. ‘The advantage of such a simulation is that many different kinds of missions can be evaluated, including off-nominal and abort cases. The program can also be used in designing missions that will stay within prescribed limits, or even in analyzing spacecraft and subsystem design to determine if some relatively small change might extend significantly the mission capabilities of the spacecraft. Because of the size and complexity of this computer program, a single Apollo mission simulation may require upwards of 20 minutes on a computer performing half a million operations per second, (Thus, one simulation may require 600 million computer operations. Even at that rate, however, it is a very inexpensive way to check on whether or not a given mission can be performed successfully. ‘The other way to check would be to launch the spacecraft and see what happened. TRW is one of the nation's pioneers in space flight, having been the first industrial company to build a spacecraft and a contributor to nine out of every 10 U. S. space launches. TRW's Mission Trajectory Control Program has aided the engineers, scientists and Astronauts at NASA's Manned Spacecraft Center in the Mercury, Gemini and Apollo programs. -30-7 IWEWY, D MEV RW i (los Angeles) Mike Mathews (213) 679-8711 Ext. 65647 FORAELEASE: — Inmediate (Cocoa Beach) Mike Steinman (305) 783-9441 (Houston) Bob Lander (713) 591-3133, Ext. 2611 or JIPC (713) 488-5472 FIRST MOON LANDING REQUIRES SOLAR FLARE WARNINGS CAPE KENNEDY, Fla. -- The first manned lunar landing will take place at the time when the possibility of encountering dangerous radiation from the sun is at its highest ‘The sun is at the peak of its eleven year cycle of activity. Larger and more frequent solar flares streak across the universe. Some of these are powerful enough to harm an astronaut on the moon or in the Lunar Module. Monitoring the sun for advance signs of these dangerous eruptions are four sun-orbiting Pioneer spacecraft and ten earth-orbiting Vela mclear test detection satellites, all built by TRW Inc. in Redondo Beach, Calif. Information about the sun from the Pioneers and Velas is transmitted to the Environmental Sciences Services Administration (ESSA) forecast center in Boulder, Colo, It is correlated with information received from earth- based observatories. Fron this data, ESSA is able to provide sufficient warnings of major solar eruptions to delay a launch or alter an orbit if necessary. ‘While it is quite improbable that a dangerous solar flare would occur during any given Apollo mission," according to Dr. A. K. (Dolf) Thiel, vice president and general manager of TRW's Space Vehicles Division, "it is a definite possibility. The ESSA predictions, aided by Pioneer and Vela, are keeping NASA alerted for action if such a flare occurs."FIRST MOON LANDING REQUIRES SOLAR FLARE WARNINGS - Page 2 Pioneer is a program of NASA's Ames Research Center, Mountain Vies, Calif. Vela is a program of the Advanced Research Projects Agency and is managed by ‘the USAF Space and Missile Systems Organization, El Segundo, Calif. ‘The first attempt to reach a moon was by @ Pioneer spacecraft. TRW's Pioneer I, the first spacecraft built by an industrial contractor and NASA's first spacecraft, was launched on October 11, 1958. It reached an altitude of 70,717 miles, 29 times as far as any previous spacecraft had traveled from the earth. ‘TRW Inc. has more than 75,000 people at over 250 locations around the world applying advanced technology to electronics, space, defense, aircraft, automotive, and related industrial and commercial markets 169 -30-Ld saw, APOLLO I TRW INC. » ONE SPACE PARK + REDONDO BEACH, CALIFORNIA 90278 - TELEPHONE 213/679-8711 (Los Angeles) Hank Litten, Mike Steinman, contaer, (213) 679-8711, ext. 65647 ron nctease (Cape) Tom Branigan, Bob Lander, Mike eee Steinman - (305) 783-9441 (Houston) Ben Gillespie, Hank Litten, Tom Branigan, Bob Lander - (713) 591-3133, ext. 2611, or SIPC (713) 488-5472 APOLLO IS A FAMILY AFFAIR FOR YOUNG TRW COUPLE HOUSTON, Texas is really a family affair, For the Leon M. Vick, Jr., family, going to the Moon Leon, a 31-year-old engineer, and his wife, Mary, a mathematician, are both members of the professional staff at the Houston Operations of TRW's Systems Group and both are deeply involved in NASA's program to land U.S. astronauts on the Moon. Leon is a member of the TRW team which assists the Flight Crew Support Division at the NASA Manned Spacecraft Center in preparing flight plans for Apollo missions, while Mary has the task of positioning the tracking ships to cover reentry into the earth's atmosphere and the splashdown, Mary, in fact, was once thought by U.S. Navy representatives to be a computer. Often when the Navy came to NASA with a question concerning tracking ship placement or movement, NASA officials would reply, "Let us check it with Mary." Thus the Navy men assumed "Mary" was an acronym for a computer or computer program. One day, Mary walked into a NASA-Navy meeting and the naval officers were most pleasantly surprised to learn Mary was really a very attractive brunette, who has been described as looking "more like a chorus girl than a mathematician. " Mary's introduction to the space program came in April of 1968 when she and Leon joined the TRW staff in Houston. At that time, she made the seemingly improbable transition from cows to spaceflight. Prior to joining TRW she headed the Data Processing Department of the Texas and Southwestern Cattle Raisers Association in Ft, Worth, Texas.» Apollo is a family affair... Page 2 | A native of Sylacauga, Alabama, Mary received her degree in mathematics -- along with a host of academic honors -- from Birmingham-Southern College in 1966. While Mary's job requires coordination with Mission Planning and Analys: Division officials at the Manned Spacecraft Center and with Navy representatives, Leon's responsibilities in flight planning bring him into contact with the astronaut crews themselves. “We must review everything with the crew," he points out, "and integrate the various activities into a timeline--or schedule--that is workable and will allow the achievement of mission objectives." The team--usually composed of two TRW engineers and two or more NASA planners--also sits in on mission simulations to monitor how well the flight plan can be followed by the crew. Leon is the space "veteran" of the family, having become associated with the program following graduation from the University of Alabama in 1963. During missions Leon works in the Flight Director's Staff Support Room in the Mission Control Center, monitoring the progress of the flight and assisting in rescheduling crew activities, should such be required. So, while Leon is at work in flight planning, Mary is determining the best positioning and movement of tracking ships in the South Pacific. Ship positioning not as simple as it may first appear. Because NASA's requirements call for tracking, telemetry and communications between the spacecraft and Mission Control from two minutes prior to the translunar injection maneuver--or launch out of earth orbit toward the Moon--to the completion of the maneuve: Because the ships' tracking capability extends only so far, and the ground track of the spacecraft changes with the passage of time, position of the ships to obtain maximum coverage during a specified time period must be determined. A launch delay of a day or more would, also, change the ground track even more and require movement of the ships. Considering rate of change of the spacecraft ground track, the speed at which the ships can move, islands, reefs, atolls, and--in some instances-- relatively uncharted waters, the complexity of the task becomes apparent. Surprisingly, perhaps, Mary and Leon find that the periods during missions are not their busiest. The largest part of their work has been completed by the time the spacecraft leaves the launch pad.Apollo is a family affair... Page 3 Changes are ""Pre-mission periods are the most hectic," Leon observe made frequently to trajectories, procedures and other elements of the flight, sometimes up until 24 hours before launch. Mary and Leon are parents of a two-year-old daughter, Lara Ann, and live in nearby Clear Lake City, a few minutes from their TRW offices and the adjacent Manned Spacecraft Center. Boating and tennis are favorite recreations, and both are active in the Clear Lake Civic League. Mary has also served as a block chairman for her political party. -30-/ POLLO Il TRW WEWS TRW INC. . ONE SPACE PARK - REDONDO BEACH. CALIFORNIA 90278 « TELEPHONE 213/679-8711 (Cape) Tom Branigan, Bob Lander and July 1, 1969 Mike Steinman 305-783-9441 (Houston) Ben Gillespie, Hank Litten 713-591-3133 ext. 2611 or JIPC 713-488-5472 (Los Angeles) Hank Litten, Mike Steinman 213-679-8711, ext. 65647 BACKGROUNDER: TRW'S LUNAR MODULE DESCENT ENGINE Project History ‘The history of the Apollo spacecraft's Lunar Module Descent Engine (LMDE) can be traced to a handful of engineers who, in 1960, initiated research at TRW Inc. ona stable, throttleable rocket engine for varied space applications. In the next two years their efforts resulted in the demonstration of a 500- pound-thrust engine. Successful tests of this engine attracted the interest of NASA and Grumman Aerospace Corp., the Lunar Module prime contractor. In July 1963, TRW!s Systems Group was awarded a preliminary development contract by Grumman, In January 1965, TRW was declared the winner of an intense 18-month competition with a parallel subcontractor and was awarded the contract to build 15 LMDE flight model engines. (On August Il, 1967--49 months after the initiation of TRW's development program, an unusually short time for the development of a new rocket engine to perform such a complex task--the LMDE completed its qualification testing. The LMDE was first tested in orbit on Apollo 5 in January 1968. After being prematurely shut down during its initial ignition due to an error in the guidance computer programming, the engine was successfully fired two additional times-~ for 33 and 28 seconds, LMDE performance on Apollo 5 was rated normal and the engine subsequently was given a ""man-rated" designation. The Apollo 9 mission in March 1969 included the second orbital test of the LMDE. On Apollo 9's third day in orbit the descent engine was fired for 370 seconds--the first manual throttling of a rocket engine in space, as astronautBACKGROUNDE! ‘TRW'S LUNAR MODULE DESCENT ENGINE - Page 2 Jim Me Divitt varied the engine's thrust between 40 to 10% for the last 56 seconds of the bura, This firing, conducted with the LM and CSM docked, simulated both the use of the LMDE to return the Apollo spacecraft to earth (in the event of a SPS malfunction) and the Apollo Il lunar landing throttling profile. ‘The LMDE's second and third burns, for 21 seconds each, were phasing and insertion burns during the LM's rendezvous maneuvers. All three burns were executed as planned, Apollo 10's flight in May 1969 represented the final in-orbit test of LMDE prior to the Apollo Il lunar landing mission, Apollo 10 was placed in lunar orbit, the LM and CSM separated and the LMDE fired for 27 seconds in a DOI (descent orbit insertion) burn identical to that required on Apollo Il, The burn caused "Snoopy" to drop, 57 minutes later, to a pericythion (low point) of nine miles, some 300 miles east of landing site #2. One hour and 12 minutes later the LMDE was restarted and burned for 40 seconds, to modify the LM's orbit for rendezvous and docking maneuvers. Both burns were normal. Design of the Descent Engine The LMDE is a pressure-fed, liquid bipropellant, variable-thrus gimballing rocket engine employed in the Apollo Lunar Module's descent propulsion system (DPS). The LMDE produces a maximum thrust of about 9, 850 pounds and is throttleable down to 1, 050 pounds. The propellants are nitrogen tetroxide (N204) and a 50-50 blend of hydrazine and unsymmetrical dimethyl hydrazine (NjH,/ UDMH). Ignition is hypergolic. The engine has an ablative combustion chamber and nozzle throat, with a crushable, radiation-cooled nozzle extension. The total dry engine weight is about 383 pounds. ‘The key to the LMDE design is the single-element coaxial injector that distributes propellants into the combustion chamber. The LMDE injector meets the stringent Apollo requirement to insure a soft landing: throttling range of 10:1, high combustion efficiency, dynamic stability, and high reliability. Other major elements of TRW's design include dual flow control valves and an ablative combustion chamber, The LMDE utilizes variable-area, cavitating venturi flow control valves, In operation, the flow control valves isolate the propellant feed system from the combustion chamber, accurately maintaining propellant delivery regardless of chamber pressure fluctuations or changes in injector or manifold pressures. The titanium-encased ablative combustion chamber is designed for an operating lifetime of 1,000 seconds. ‘The chamberBACKGROUNDEH: TRW'S LUNAR MODULE DESCENT ENGINE - Page 3 is surrounded by a heat shield to keep external temperatures within the LM below 400°F, A crushable, radiation-cooled, columbium nozzle skirt extends below the chamber to provide complete flow expansion with minimal additional weight. The combustion chamber is mounted in a lightweight box-beam gimbal assembly which can be swivelled * 6° in two planes to provide directional control. Descent Engine Test Program Testing the LMDE is an extensive task. As of July 1969, the test record showe Injector test firings 1862 Head end assembly test firings 1346 Ablative engine test firings 573 Total ground test firings 3781 Total ground test firing time 207, 213 Total in-orbit test firings 8 Total in-orbit test firing time 544 The engine to be employed on Apollo 11 (serial number 1043) has been test fired for 147 seconds at TRW's Capistrano Test Site near San Juan Capistrano, Calif. Descent Engine Program Management at TRW Robert Bromberg, V.P. and General Manager, Science & Technology Div. (STD) Arthur F, Grant, Jr., Assistant General Manager, STD Gerard W. Elverum, Jr., Manager-Energy Systems Operations, STD Robert C. Anderson, Manager - Project Operations, STD Robert L. Larson, Manager - LMDE Project Office, STDBACKGROUNDER: TRW'S LUNAR MODULE DESCENT ENGINE - Page 4 Descent Engine Sheet Engine specs: Dimensions: Materials: Contractor: Major subcontractors: Thrusts: 9, 850 to 1, 050 Ibs Oxidizer/fuel ratio: 1.6 to 1 Flow rate: oxidizer - 20 Ibs/sec, fuel - 12.5 Ibs/sec (max) Chamber pressure: 104 psi (max.) Expansion area ratio: 47 tol Restart capability: 20 times Engine life: 1,000 seconds Gimbal: 1 6 degrees, x and y axes Weight: 383 pounds Overall length: 90,5 inches Skirt diameter (at base): 59 inches ‘Thrust chamber shell: titanium ‘Thrust chamber ablator: silica phenolic ‘Thermal blanket: stainless steel foil & glass wool Nozzle extension: columbium alloy Gimbal assembly: aluminum alloy Gimbal bearings: Fabroid TRW Systems Group (under subcontract to Grumman) Bendix Corp, (throttle actuator) Ryan Aeronautical Co, (combustion chamber case) TRW Equipment Group (combustion chamber liner) ‘Transport Dynamics (gimbal bearings) Whittaker Corp. (bipropellant shutoff valve) -30-POLLO Il TRW INC. » ONE SPACE PARK - REDONDO BEACH. CALIFORNIA 90278» TELEPHONE 213/879-8711 contact: (Cape) Tom Branigan, Bob Lander, Fon ncteast: July 1, 1969 Mike Steinman 305-783-9441 (Houston) Ben Gillespie, Hank Litten 713-591-3133, ext. 2611 or JIPC 713-488-5472 (Los Angeles) Hank Litten, Mike Steinman 213-679-8711, ext. 65647 DOWN TO THE SEA IN LM -- COURTESY TRW'S DESCENT ENGINE REDONDO BEACH, Calif. -- Only 10 untried miles now separate man from the moon. With Apollo 10 successfully behind us, the U.S. will bridge that final gap on July 20 with the soft landing of NASA astronauts Neil Armstrong and Edwin Aldrin in the lunar Sea of Tranquility. ‘To do s0, NASA and th designed to throttle--like an automobile engine--so that the LM can cover Apollo Il crew will depend on a rocket engine those last 10 miles slowly, safely and successfully. This unique rocket engine was built by TRW Inc. for the LM prime contractor, Grumman Aerospace Corp. It has been designed and fabricated at TRW's Systems Group in Redondo Beach, California. Its Role on Apollo I The LM descent engine will be fired twice during Apollo Il, First, as on Apollo 10, to bring the M from its 69 statute mile orbit down to an altitude of 50,000 feet, 300 miles east of the landing site. Then the descent engine will be put through the longest and most complex firing in space for a U.S. rocket engine, The 12-minute firing will brake the LM's fall toward the moon, will permit the crew to hover above their landing site if necessary and will finally lower the LM onto the moon at 2 mph (vs. Apollo I's top speed of almost 25,000 mph achieved in leaving earth orbit enroute to the moon).Down to the Sea in LM - Page 2 Ite Background Work on the LM descent engine began nine years ago at TRW. By 1962, a small group of engineers had demonstrated a 5000-pound-thrust throttleable engine, and the following year Grumman awarded TRW a preliminary develop- ment contract for the LM descent engine. In January 1965, the company was awarded the contract to build 15 flight model engines. It's Throttleable whe LM descent engine is the first large throttleable rocket engine in the U.S. space program, Its thrust can be varied--automatically by the LM primary guidance system or manually by either member of the LM crew. ‘Maximum thrust of the engine is 9,850 pounds. It can be throttled down to as low as 1,050 pounds for the delicate task of lunar soft landing. Durable ‘The LM descent engine can be fired in space for up to 1, 000 seconds. On Apollo ll, it is expected to be fired for 28 seconds on its first or "DOI" (descent orbit insertion) burn and for more than 700 seconds on its second or “powered descent" burn, This is longer than any other large U.S, rocket engine. To provide this long-duration burn capability, more than one-half of the LM's total weight is in propellants for the descent engine--about 18, 180 pounds out of a LM total of 33,742 pounds. ‘The engine itself weighs only 383 pounds (13 pounds under the design specifications--a feat that earned TRW an $162, 000 incentive bonus} It's Crushable ‘The LM descent engine also features the first crushable nozzle extension or "skirt." The skizt, intended to improve the engine's efficiency by providing more complete flow expansion of exhaust gases, extends below the bottom of the LM to within 18 inches of the landing pads. Should the skirt strike a rock or small boulder during the LM's landing, it must crush up to a maximum of 28 inches to avoid tipping over the LM. To accomplish this, TRW engineers selected a columbium alloy for the skirt that will both crush and withstand the temperatures predicted--2, 400°F at the top of the skirt.Down to the Sea in LM - Page 3 It's Ready The descent engine has been test fired almost 4, 000 times on the ground (at TRW's propulsion test site near President Nixon's summer residence at San Clemente, Calif.) and eight times in space--thrice on Apollo's 5 and 9 and twice on Apollo 10, This unique engine is now ready to carry out its intended function--to land man on the moon. -30-TRW WES TAW ING. . ONE SPACE PARK - REDONDO BEACH. CALIFORNIA 90278 - TELEPHONE 213/679-8711 contact: (Cape) Tom Branigan, Bob Lander and FOR RELEASE: July 11, 1969 Mike Steinman 305-783-9441 (Houston) Ben Gillespie, Hank Litten 713-591-3133 ext. 2611 or JIPC 713-488-5472 (Los Angeles) Hank Litten, Mike Steinman 213-679-8711, ext. 65647 BACKGROUNDER: HOW MAN WILL LAND ON THE MOON Apollo 11 Spacecraft Commander Neil Armstrong and LM Pilot Edwin Aldrin will begin their historic descent to the lunar surface with a 28-second "descent orbit insertion (DOI)" burn of their TRW-built LM descent engine. After a coast period of 57 minutes, the LM will reach an altitude of 50, 000 feet and the descent engine will be restarted for "powered descent" lasting about 12 minutes--until the LM is settling onto the lunar Sea of Tranquility. ‘The powered descent burn will be the longest and most complex firing of a U.S. rocket engine in space. ‘The Lunar Module descent engine is built by TRW's Systems Group in Redondo Beach, California for the LM prime contractor, Grumman Aerospace Corp. ‘The unique engine is the first large throttleable rocket engine in the U.S. space program. Its thrust can be varied in direction and magnitude--from 9, 850 pounds down to 1, 050 pounds--automatically by the LM's guidance system or manually by either member of the LM crew. Descent Orbit Insertion (DOI) Apollo 11's initial burn essentially will duplicate Apollo 10's DOI burn. The descent engine will be fired for 15 seconds at 10% thrust (1, 050 pounds), then the crew will throttle up to 40% thrust (4, 200 pounds) for about 13 seconds. When the LM has been slowed 47 mph (70 fps AV}, to a speed of 3,600 mph, the engine's firing will be terminated by the primary guidance & navigation system (PGNS). As on Apollo 10, the DOI burn will take place behind the moon, About 40 minutes later, as the LM and its crew are falling" toward the moon, communications will be re-established and a good burn confirmed. Powered Descent: Braking Phase When the LM reaches the pericynthion (low point) in its orbit of about 50,000BACKGROUNDER: How Man will Land on the Moon - Page 2 feet, 300 statute miles east of landing site #2, the descent engine will be restarted to begin powered descent. ‘This final descent is divided into three phases: braking, approach and landing. ‘The braking phase is designed for efficient reduction of the LM's orbital velocity, the approach phase is intended to permit the crew to visibly assess their landing site and the landing phase will permit manual control for lunar touchdown. The braking phase will begin at the 10% thrust level for 26 seconds, then auto- matically will throttle to full thrust (9, 850 pounds) for about 358 seconds, and finally will be throttled in the range of 55% thrust (5, 775 pounds) to 59% thrust (6, 150 pounds) for two minutes, This portion of the burn is intended to place the LM on a trajectory ‘an altitude of 7, 500 feet where the vehicle should that passes through a "high gate" target. be traveling about 340 mph. ‘The LM will be in a windows-down attitude until it reaches an altitude of 45, 000 feet, when it will be rotated 180° to a windows-up attitude so that the landing radar can be used beginning at an altitude of about 40,000 feet. The LM will be in PGNS control throughout the braking phase. Powered Descent: Approach Phase ‘The approach phase begins “high gate," when the guidance system switches to its “low gate" target--an altitude of 500 feet where the LM should be slowed to a speed of about 40 mph, The landing site will come into view for the crew during the approach phase, at about 8 1/2 minutes into the powered descent. During the approach phase the engine will be throttled in the range of 59% thrust to 26% thrust (2, 725 pounds). The crew can assume manual control of their attitude and/or semi-manual or manual throttling of their descent engine, or can let the PGNS continue to control the descent during this phase. Attitude control is maintained by gimballing the descent engine and/or by firing the reaction control system (RCS) engines. In the semi-manual throttling mode, the crew can select their rate of descent and have it carried out by the guidance system. In the manual throttling mode, the rate of descent is directly controlled by the crew, using a hand control. ‘The approach phase will be completed when the LM reaches its "low gate. "BACKGROUNDER: How Man Will Land on the Moon - Page 3 Powered Descent: Landing Phase ‘The crew probably will have assumed semi-manual throttling by the time they reach "low gate," and will be steadily throttling back as they near the moon. If they want to take one last good look at their landing site, they can hover for up to about two minutes (a longer hover period could cause them to run out of propellants). Here they can select their precise landing site and can make final , translating horizontally if necessary with their RCS engines. adjustment! From an altitude of 150 feet on, their descent will be straight down. Final descent will be at 3 fps (2.0 mph), with about 25% thrust (2, 625 pounds) throttle setting, The LM's landing probes will make contact with the surface at an altitude of 5 feet, turning on a warning light in the cabin. Astronaut Armstrong will shut off the descent engine as Apollo I's LM is settling onto the surface of the moon. -30-TRwicrs APOLLO I TAW INC. » ONE SPACE PARK - REDONDO BEACH, CALIFORNIA 90278 - TELEPHONE 213/679-8711 cowracr: (cape) Tom Branigan, Bob Lander Fon nevease: July 1, 1969 Mike Steinman (305) 783-9441 (Houston) Ben Gillespie, Bob Lander Hank Litten (713) 591-3133, ext, 2611 (Los Angeles) Hank Litton, Mike Steinnan (213) 679-8711, ext. 65647 BACKGROUND INFORMATION APOLLO 11 LUNAR MODULE ABORT GUIDANCE SYSTEM (AGS) ‘The LM AGS (called ags, rhymes with tags, by the astronauts) was naned for its ability to allow astronauts to take over control of the LM vehicle safely, to abort the mission, and rendezvous with the CSM orbiting above them. ‘The astronauts do not plan to use the abort guidance capability of AGS unless a malfunction develops in the primary guidance system (PGNCS). Under nomal circumstances, the AGS functions in an "open-loop" fashion, navigating in parallel with the LM primary guidance system and supplying the astronauts with an independent source of position, velocity, attitude, and steering information which they can compare with the primary system to help evaluate its performance. ‘At any point in the normal descent to the lunar surface, on the lunar surface, or ascent and rendezvous with the CSM, the AGS is immediately available to take over control to effect a safe return to the CSM. The AGS, developed and produced by TRN's Systems Group under sub- contract to Grumman Aircraft Engineering Corporation (GAEC), consists of three assemblies: Abort Electronics Assembly (AEA) -- the guidance computer; Abort Sensor Assembly (ASA) -- the inertial sensor package; and the Data Entry and Display Assembly (DEDA, pronounced deeda) -- a keyboard device for astronaut interface with the guidance computer. The ASA is provided by Hamilton Standard Systeas Center (HSSC) under subcontract to TRH.Background Information Apollo 11 Page 2 Lunar Nodule Abort Guidance System (AGS) ‘The key functions performed by the AGS are as follows * Maintains attitude reference * Performs navigation (LM and CSHO) * Solves explicit guidance problems * Drives attitude and navigation displays * Provides steering and engine commands * Provides for navigation updating using the on-board radar * Provides automatic alignnent and sensor calibration ‘The AGS is the first complete strapdown guidance system to be employed in space and the first such system to be used in a manned space progran. In this system, additional mathematical computations are substituted for considerable electromechanical gear (gimbals, torque motors, slip rings, etc.) found in conventional inertial guidance systems. This technique results in a smaller, lighter, and more reliable unit than the typical gimbaled systens. Guidance equations and software for the AGS are provided by TRW's Systems Group under @ contract to NASA/MSC. -30-D ewe, APOLLO II TRW INC. - ONE SPACE PARK - REDONDO BEACH, CALIFORNIA 90278 - TELEPHONE 213/679-8711 (Cape) Tom Branigan, Bob Lander July 1, 1969 Mike Steinman (305) 783-9441 (Houston) Ben Gillespie, Bob Lander Hank Litten, (713)591-3133,ext. 2611 (Los Angeles) Hank Litten, Mike Steinman (213) 679-8711, ext. 65647 ‘TRW'S ELECTRONIC "GOLD" BOXES HELP ASSURE SAFE LUNAR VOYAGE HOUSTON, Texas--Two gleaming gold-plated boxes and a grey and black panel assembly house the backup guidance systen that will help assure a safe voyage by the Apollo 11 astronauts to and from the moon's surface in the lunar module. ‘The gold-plated boxes and panel assembly physically represent the vital components of the Lunar Module Abort Guidance System or AGS (rhymes with tags) as it is called by NASA's astronauts. Built for Grumman Aircraft Engineering Corp., LM prime contractor, by TRW's Systens Group, the AGS is named for its ability to allow astronauts to safely take over control of the LM vehicle in the event the mission is aborted, and rendezvous with the Command Service Module orbiting above then. Should trouble develop in the Primary Guidance Navigation Control Systens (PGNCS) of the LM, the astronauts may take over control with AGS at any point in the nomal descent to the moon's surface, on the surface, or during ascent and rendezvous with the CSM with the AGS. During the periods of communications blackouts when the LM is behind the moon, the AGS takes on an additionally important role because the astronauts must depend on the systen for verification of navigational data. This is normally done with Mission Control Center here with AGS serving as an auxiliary source. The AGS was first tested successfully in space during the Apollo 9 mission and then in lunar orbit during the Apollo 10 mission. The system was "exercised" by putting it through a nunber of operations such as controlling staging, descent and ascent engine firing, and other navigational maneuvers.‘TRN'sElectronic "Gold" Boxes Help Assure Safe Lunar Voyage Page 2 Astronaut control with the AGS is achieved by actuating switches located on the main control panel which technically are not part of the AGS itself. Tucked strategically into the LM are the gold boxes and the grey control panel of the AGS. One gold box, measuring 5 inches by 8 inches by 23.75 inches, "the brain" of the AGS, is @ digital computer with 4096 word menory located in the aft equipment bay of the lunar module. Technically its the Abort Electronics Assembly (AEA). ‘The other gold box, the Abort Sensor Assembly, is the "nerve" center of the AGS and contains the motion detection devices -- the gyroscopes and accelerometers -- for sensing the attitude and velocity of the LM. Weighing 20.7 pounds this assembly is 9 inches by 15.5 inches by 9 inches and is mounted on the LM navigation base. The ASA was designed and built for TRW by Hanilton Standard Systens Center of United Aircraft Corporation. Gold plating serves to control thermal radiation and to provide the ultimate anti-corrosion protection afforded by a noble metal. Astronauts can put data into the computer and read it out on the grey panel with the pushbuttons and luminescent numbers. ‘This panel is 5.5 inches by 6 inches by 5.19 inches and is located on the right side of the LM control panel at waist level. Because it contains additional electronics besides lights and pushbuttons, this Data Entry and Display Assembly (DEDA) tips the scales at 8.4 pounds. Under normal circumstances the AGS operates in parallel with the PGNCS It supplies the astronauts with an independent source of position, velocity, attitude and steering information which they compare with the primary system to evaluate performance. Astronauts may call up data from the AGS by operating the DEDA, or may enter data into the AGS via the same grey-panelled set of pushbuttons and Lights.D sw, APOLLO HI TAW INC. . ONE SPACE PARK - REDONDO BEACH, CALIFORNIA 90278 - TELEPHONE 213/679-8711 (Los Angeles) Hank Litten, Mike Steinman, contacr (213) 679-8711, ext. 65647 ron netenan (Cape) Tom Branigan, Bob Lander, Mike Taly 1, 1969 Steinman - (305) 783-9441 (Houston) Ben Gillespie, Hank Litten, Tom Branigan, Bob Lander - (713) 591-3133, ext. 26ll, or SIPC (713) 488-5472 TRW ROLES IN THE APOLLO PROGRAM REDONDO BEACH, California -> TRW Inc., the first industrial firm to build a spacecraft and a participant in 9 out of 10 space projects, is performing eight major roles in the Apollo lunar landing program. They are: LUNAR MODULE DESCENT ENGINE (LMDE) TRW Systems Group's Science & Technology Division, under subcontract to Grumman Aircraft Engineering Corp., supplies the rocket engine that will soft-land the Lunar Module on the moon. A throttleable, gimballed, liquid bi-propellant engine, LMDE will be varied in thrust from 1,050 to 9,850 pounds during the lunar landing. LMDE, as the key element of the LM's descent propulsion system (DPS), will be fired twice during Apollo ll, The first burn, behind the moon, will initiate LM's descent to a lunar altitude of 10 miles. The second burn will last some 12 minutes and will slowly lower the LM to the lunar surface. MISSION TRAJECTORY CONTROL PROGRAM (MTCP) ‘At its Houston Operations adjacent to the NASA Manned Spacecraft Center, TRW's Systems Group is providing major assistance to the MSG Mission Planning and Analysis Division in the areas of trajectory design and analysis, orbital maneuvers, flight control computer program development, range safety analysis, operational software, and mission error analysis. SPACECRAFT SYSTEMS ANALYSIS PROGRAM (SSAP) ‘Also at its Houston Operations, TRW is performing analytical and experimental studies, technical fact-finding and evaluation, technical systems analysis, and investigations of spacecrait systems and associated equipment to provide a basis for technical decision-making by NASA MSC personnel.RW ROLES ... Page 2 LUNAR MODULE ABORT GUIDANCE SYSTEM (LM/AGS) ‘The LM/AGS, designed and built by the TRW Systems Group's Electronic Systems Division for Grumman, understudies the primary guidance and navigation system (PGNS) and provides a backup should PGNS develop a malfunction. The AGS also provides reference data for comparison with other systems during normal LM operations. SIGNAL DATA DEMODULATOR SYSTEM (SDDS) Built by the TRW Systems Group's Electronic Systems Division for Collins Radio Co., the SDDS equipment, which enhances clear voice communications through advanced techniques during the Apollo missions, is installed at 18 worldwide locations and on board Apollo ships as part of the Apollo S-band communications network. The SDDS handles nearly all forms of information from the spacecraft including telemetry data, in addition to voice communications. Should an emergency occur, SDDS will provide communications via a simple telegraph key. SATURN V THIRD STAGE ATTITUDE CONTROL ENGINES (ACE) TRW's Equipment Group, under subcontract to McDonnell Douglas Corp. , provides six 150-pound-thrust attitude control engines for the Saturn V's S-4B third stage. The rockets, a part of the S-4B auxiliary propulsion system (APS), are mounted in two clusters of three each and may be fired singly or in groups. On the Apollo 11 mission, the engines will maintain roll control during the first J-2 engine burn, provide roll, pitch and yaw control in earth orbit and align the S-4B stage in earth orbit prior to J-2 restart to inject Apollo 11 into translunar trajectory. TEST & TRAINING (TETR) SATELLITES TRW Systems Group's Space Vehicles Division, under contract to NASA's Goddard Space Flight Center, has produced two Test & Training Satellites placed in low earth orbit to check out the Apollo's worldwide Manned Space Flight Network and train the network's operators. The 44-pound octahedral satellites are members of TRW's Environmental Research Satellite (ERS) series. TETR 1 was launched December 13, 1967, and simulated Apollo spacecraft communications during its 4 1/2-month life- time. The second TETR was orbited November 8, 1968 and has been used to ready the Apollo network for the Apollo ll mi SOLAR FLARE WARNING (PIONEER AND VELA) Four Pioneer spacecraft in orbit around the sun and 10 Vela satellites orbiting the earth are monitoring the sun for signs of major solar flares and other radiation powerful enough to harm an astronaut in space or on the moon. Built by 'TRW Syst ems Group's Space Vehicles Division, they are providing NASA with sufficient advance warning to delay a launch or alter an orbit, if necessary. -30-MPAD 5420 § (IU) LM DESCENT CSM ORBIT (62 BY 58N. MI.) LM DESCENT ORBIT (60 N. MI. BY 50 000 FT) UNDOCKING = aes SUN ‘SEPARATION EARTHOPERATIONAL PHASES OF POWERED DESCENT ee ae csM ORBIT fotG0N. MI.) k rovtesounc—> <> (LANDING PHASE) a Time, PACTITUDE, | RANGE, ] PHCH. T TONITION 0 | 30.000 | 258 | % } papa acriruoe uroate| 5 | 36.000 | 52 | 7 , i bss AUTOMATIC (P-64165) so.on0 MT}TUBE® “ E Fen n sat as 280 ata 60 2-000 RANGE, FT RANGE, N. MI.Pap s4se si TIME HISTORIES OF DESCENT TRAJECTORY AND GUIDANCE PARAMETERS SEQUENCE OF EvENTS 1 Po. 2 URATuPoATE 3 Tinorn recovery 4 Uevevupoare avo woatz visieiiry 5 HIGH cave : © INMATE verrcasoescent is 1 rei | ‘ ey we PERCENT OF RATED 5p THRUST.“ iust Titust cad ° 0% 107 Am, | | | i ° ° ALTITUDE gy fates es 71 | | fesse eee ees ea eee -m i” LPD AND FDA | Pre OG fat Prreu = PD ° 10x10 HORIZONTAL | I | | vewocity, Fes 5 er om mm mm so 50 wo mm ‘TIME FROM ULIAGE, SEC VU isMPAD 4846 S LM ASCENT csm (60 BY 60.N. MI.) Ss UN, POWERED ASCENT INSERTION (9145 NMI. ORBIT) EARTHMPAD 5215 § (IU) VERTICAL RISE PHASE 720) 75 16 640} 560} 4 70 14 480] 400} TIME FROM AUIITUDE, gq AUTITUDE |}? LUNAR RATE, FPS LIFT-OFF, 320 ‘SEC 240} 4 50 10 GUIDANCE SWITCH TO 3 160 RBIT 140 INSERTION PuasE |, 6 we aS 20 4 Lea O mB aa 160 DOWN-RANGE POSITION, FT bMPAD 5499 SU) ORBIT INSERTION PHASE ORBIT INSERTION PHASE ASCENT BURN OUT COAST TO 44,07 N. MI. APOLUNE END VERTICAL 59.927.5 FT RISE ~166.52 N. M1.—=| TOTAL ASCENT: BURN TIME = 7:14.65 MIN:SEC AV REQUIRED = 6,055.39 FPS PROPELLANT REQUIRED = 4,989, 86 LB INSERTION ORBIT PARAMETERS ONBOARD DISPLAYS AT INSERTION hy + 54,905.4 FT V = 5,535.9 FPS fh 32.2 FPS h = 6041295 FT ha 7 44.07 N. MI. a 2 17.59° ae y+ 324°MPAD 5470 S(IU) NOMINAL LM RENDEZVOUS FOR APOLLO 11 PF 31 FPS (THEORETICAL) CSM AT PC : nnn reenerrnnrensee entrantLM cst, un a) PHASING (1) CSM AT LM INSERTION MPAD 5472 SUV) PHASING/CSI-FOR-CDH LM-ACTIVE SEQUENCE NOTE: CSI, REPLACES THE ORIGINAL COH CSM AT CSM AT CSI, PHASING LM TPF (6) csm AT TPL LM AT eSMene INSERTION ton / cst, ‘ EARTH EARTHMPAD S471 S(IU) PHASING/CSI-FOR-CDH RESCUE SEQUENCE CSM PHASING: CSM IN NOMINAL- PARKING ORBIT CSI, REPLACES THE ORIGINAL CDH CSM CST, LM AT PHASING iM AT csi, / i EARTHa LM AT RESCUE 2 CSM RESCUE 2 a CSM NOMINAL PARKING ORBIT LM ORBIT AFTER PARTIAL ABORT INIT MPAD 5473. S(IU) RESCUE 2 SEQUENCE NOTE: DEPENDING ON SITUATION, CSM COULD REMAIN IN CSI-TO-CDH ORBIT 1, 2, OR 3 REVOLUTIONS csm TPF (5) LM AT TPI csm TPI (4) CH cot LM aT ea Nee > com LM AT / CDH csi oo 6) EARTH Path ‘ V YUNO-PDI ABORT LM-ACTIVE SEQUENCE (2 IMPULSE TO CDH-OFFSET) LM (ZERO_AV) csm AT CSI CSM AT TP sm AT LM ABORT ABORT Init (1) / INIT : / EARTH EARTH MPAD 5475 S(IU) iM CoH @) AT COHMPAD 5474 SU) HIGH-DWELL RESCUE SEQUENCE CSM WELL. INITOD CSI 3 REVS AFTER Va CSI (2) DWELL INITIATION LM AT LM AT CSM DWELL INIT CSM TPF. / LM AT CSM TPH csM TPL CSM DWELL a) REV LM AT END OF 2ND LM AT CSM DWELL INSERTION 25, ESM CDH a / CDH (3) CSM AT UM INSERTION EARTH CSM IN DWELL ORBIT 3 FULL REVOLUTIONS EARTHMPAD 5422 S MISSION PROFILE LOI-1 60 BY 170 N. MI. LOI-2 65 BY 55 N. MI. LUNAR SURFACE STAY TIME 21.5 HR TRANSEARTH COAST~ 60 HR TOTAL LPO DURATION~59.5 HR INJECTION INTO TRANSLUNAR COAST~ 76 HR + ~ TRANSLUNAR TRAJECTORY © = MIDCOURSE CORRECTION00; 3.4 NOMINAL TIMELINE LUNAR SURFACE EVA oon Me cor une DEPRESS CABIN FROM 3.5 PSI| OPEN HATCH Al INSURE SUBLIMATOR TCED als ale RB ae tee PERFORM COMM CHECK gr a MOVE TO POSITION MONITOR CDR ACTIVITY Bib! wo _]] ofecvensetnega PLAY OU bec 25 TURN TV ow 2 + START SEQUFNCF CAMERA (SC) eel Nove: DETAILED PROCEDURES 33 ARE PRESENTED IN "FINAL BESCEND TO, FOOTPAD PLAY WUT LEC 25 EVA PROCEDURES. APOLLO. 11® CHECK ASCENT PROCEDURES 138 SUBMITTED BY EVA BRANCH, FCSD 3 Sep TH GRFACE Hane sc FR TO 24/SEC ne REST/CHECK EMU cae CHANGE SCR To 12/6 | ee stow Lec aly VISUALLY MONITOR COR ACTIVITY PROVIDE CHECKLIST ASSISTANCE + + cuecx aN Discuss BALANCE/STABILITY NOVE THROUGH HATCH + ASSIST coR ChANGE SC FILM HAG CHECK TNGRESS PROCEDURE PLAY OUT LEC CHANGE FR TO 6/SEC A aL Je mL TaneH Dae con TE Baa FRG FINAL. TORE 27, 196: Ti2430_- 112458, 3/19 Tort]con DETACH Tow CAHERA cHECK +r REST/CHECK EMU UNSTOW CSC AND DEPLOY HANDLE EXTEND BAG COLLECT SAMPLE BAG AND DISCARD, HANDLE SAMPLE TRANSFER STILL TO SURFACE TETHER, CRNERA REST/CHECK EMU CHECK ANO REPORT 1M STATUS ERRALN AND LIGHTING NOMINAL TIMELINE ue CHECK LAND EMU a START SC MONITOR COR ACTIVITY PREPARE FOR ‘CAMERA. TRANSFER ASSIST COR’ CHANGE SC'FR TO 1/SkC PERFOR FINAL LAND EMU CHECK CONFLRN "GQ", FOR EVA PLACE” SPARE ‘CAMERA’ OW LW FLOOR reo sc co MONITOR AND PHOTO EGRESS MONITOR AND PHOTO LMP PREPARE HESA FOR TV DEPLOYHENT REVOVE TRIPOD CHANGE FROM WA TO LD LENS REVOVE TV CABLE A REMOVE. CAMERA A canny TV To DEPLOY SITE PERFORM COMM CHECK MOVE THRU HATCH CHECK INGRESS PROCEDURE DESCEND TO PAD CHECK ASCENT PROCEDURE STEP TO SURFACE REST/CHECK EMU ceck BALANCE/STABILITY REACH CAPABILITY DETERMINE WALKING CAPABILITY SBION. DATE avy, TAGE, WPOLLO- TT TRE 27. 1968 5/20 ZorTco, 7 RY TV CAF ry oervol site TAKE! FAST- ScAN PAKORIEA 50-4 ‘OR SEVERAL POINTS OF INTEREST PLACE TV FOR SUB. EVA wove NEAR LMP REST/CHECK EMU “ PHOT Swe YZ] PLACE CAMERA ON MESA = PREPARE MESA FOR 7] BULK SAMPLE COLLECTION —Y} PREPARE ALMT AND SRC COLLECT ROCKS AND LOOSE MATERIAL = NOMINAL TIMELINE we. REST/CECK, EA POLL TW ‘ABLE FROM, MESA ERECT SRC TABLE REMOVE SwC FROM MESA DEPLOY IN SUNLIGHT ops EVALUATE AND REPORT EVA CAPABILITY AND EFFECTS ON ‘SURFACE (TETHER CAMERA WHEN REQUIRED) EVALUATE AND REPORT LiGHTING/VISTBILITY oor 7 REST/CHECK EMU CLOSE AID SEAL SRC CONNECT LEC a av AND TERRAIN TN SUNLIGHT EVALUATE AND REPORT LIGHTING /VISIBILITY AND TERRAIN ‘NT SHADOW EDGE TAKE PHOTO PANORAMA EVALUATE AND REPORT LIGHTING/VISIBILITY ‘AND TERRAIN. TN SHADOW REPORT STATUS AND PHOTO QUAD 1 REPORT STATUS AND PHOTO +2 GEAR PHOTO BULK SAMPLE AREA Dare seo WHE [apouto WHE 27. 7 969 | STEELoR CARRY, ALSCC REPORT STATUS quan tv REPORT STATUS +7 GEAR evaLiate TERRAIN/VISIBILITY TAKE CLOSE-UP PHOTOS REPORT. STATUS Quan TIT ¢ REPORT STATUS =Z GEAR 4 TETHER STILL CAMERA REPORT STATUS AND PHOTO QUAD IT PHOTO EASEB OFF LOAD NOMINAL TIMELINE uw pe REMOVE ALSCC FROM MESA AND DEPLOY PHOTO QUAD IV PHOTO +¥ GEAR TAKE PHOTO PANORAMA PHOTO QUAD ITT PHOTO -Z GEAR + TRANSFER CAMERA TO COR +. OPEN SEQ, BAY DOOR con REPORT STATUS ‘AND. PHOTO =Y GEAR TAKE PHOTO PANORAMA PHOTO EASEP OFFLOAD TAKE, CLOSE-UP PHOTOS carry CANERAS TO DEPLOY SITE REPORT POSITION FROM LM vepLoy Lr? Pworo LR? MOVE 79 PSE Le REMOVE PACKAGE 1 (PSE) REMOVE PACKAGE 2 (LR?) CLOSE SEQ BAY DOOR REST/SELECT DEPLOY SITE CARRY. EASEP PACKAGES TO DEPLOY SITE REST/CHECK EMU DEPLOY PSE TAKE CLOSE-UP PHOTOS Scion BATE TEOION Tie BAY, PAGE, TEENS FHIAL TORE 13, 1905 42 — 114106 5/20 Tortcon ass PHOTO PSE MOVE TO. QUAD IL REsT/PHOTO LMP TAKE CLOSE-UP PHOTOS PHOTO SAMPLING TETWER SABLE BAG TO Le vata on PHOTO DS AREA SELECT DS AREA NOVE TO DS AREA NOMINAL TIMELINE ue WOVE TO MESA REST/CHECK EMD WOVE BULK SRC TO STRUTS OR FOOTPAD PREPARE DS SRC AND SAAPLING EQUIPHENT + 1450. ‘con PHOTO SAMPLES AND SAMPLE. AREA ASSIST LMP we DESCRIBE. SAMPLES ‘AND SAMPLE. AREA COLLECT SAMPLESNOMINAL TIMELINE on, we ne ASCEND 10 PLATFORM REST/PHOTO LMP REMOVE ALSCC FILM sro Age uN Stow tn se rocker rnctess MOVE TO MESA eevee PU Sap BY hese ae W SCALE + poet open Lakce envin CHECK LN AND ML Se ae aR REMOVE CAMERA MAGAZINE HOLD CONTAINER COLLECT LOOSE MATERIAL 2b COME Te, LEC - SEAL AD STs + |. CHANGE SC FILM HEOKLENT CAMERA an OPEN SHALL CONTAINER manele HOLD CONTAINER ai fo" ad COLLECT ROCK SAMPLE ane TRANSFER BULK RETRIEVE SWC ust STARE INTO sc00? Loose av20 SRYPLE, SRC AND Assist coR, SURFACE. MATERIAL INTO HERA HAG, TF REQUIRED ASSESS FORCE. SAUPLE BAG PATO a 1 PLACE Sit IN BAG HOLD She BAG a% io Discontect AND IF TIME AVATLABLE STOW SRC. AND PACK SRE COLLECT CORE SAMPLE REST/CHECK EMU CAVERA HAG, ae MOVE TO LADDER ‘leat oie Close SEAL ste YE TO LA a Tien Dae sro Tie Ba PAGE POLLO TT FINAL SRE 27, 1965 | Tiae30 = Tse 5720-21 SofNOMINAL TIMELINE oR ine, ise Loveh tec JETTISON EQUIPMENT ATTAGH TO DS SRC CLOSE HATCH ASSIST COR, S TT STOP sc TF REQUIRED ‘TRANSFER DS SRC CABIN REPRESS 2+40 aol om DISCONNECT REST/CHECK EMD AND STOW SRC CLEAN EMU ales CHANGE sc FR TO 12/SEC WONITOR COR ASCENT ASCEND TO a PLATFORM DISCONNECT LEC AND PASS TO COR DISCARD LEC + : ASSIST COR INGRESSNASA APOLLO Il — FIRST MANNED LUNAR LANDING MISSION INFORMATION DISPLAY TRW ] Sein Ss APOLLO Il TRAJECTORY
You might also like
Analysis & Simulation of The Trajectory of The Apollo 11 Flight To Moon
PDF
No ratings yet
Analysis & Simulation of The Trajectory of The Apollo 11 Flight To Moon
57 pages
The "Blue Suit" Space Station: Giuseppe de Chiara Foreword by Dwayne Allen Day
PDF
No ratings yet
The "Blue Suit" Space Station: Giuseppe de Chiara Foreword by Dwayne Allen Day
31 pages
Analysis & Simulation of The Trajectory of The Apollo 11 Flight To Moon
PDF
No ratings yet
Analysis & Simulation of The Trajectory of The Apollo 11 Flight To Moon
56 pages
The Apollo Chronicles: Engineering America’s First Moon Missions Brandon R. Brown - Download the ebook with all fully detailed chapters
PDF
100% (1)
The Apollo Chronicles: Engineering America’s First Moon Missions Brandon R. Brown - Download the ebook with all fully detailed chapters
51 pages
20032940
PDF
No ratings yet
20032940
67 pages
Download The Apollo Chronicles: Engineering America’s First Moon Missions Brandon R. Brown ebook All Chapters PDF
PDF
100% (3)
Download The Apollo Chronicles: Engineering America’s First Moon Missions Brandon R. Brown ebook All Chapters PDF
51 pages
48694
PDF
No ratings yet
48694
55 pages
Nasa Lego Lunar Lander 10266
PDF
No ratings yet
Nasa Lego Lunar Lander 10266
124 pages
Download full The Apollo Chronicles: Engineering America’s First Moon Missions Brandon R. Brown ebook all chapters
PDF
100% (5)
Download full The Apollo Chronicles: Engineering America’s First Moon Missions Brandon R. Brown ebook all chapters
41 pages
A Brief History of The Lunar Roving Vehicle
PDF
No ratings yet
A Brief History of The Lunar Roving Vehicle
27 pages
10th Anniversary of U.S. Manned Space Flight
PDF
No ratings yet
10th Anniversary of U.S. Manned Space Flight
9 pages
Catalog of Apollo Experiment Operations
PDF
No ratings yet
Catalog of Apollo Experiment Operations
161 pages
Ad Astra, Vol. 31.2 (Spring 2019)
PDF
No ratings yet
Ad Astra, Vol. 31.2 (Spring 2019)
100 pages
The Apollo 1 Disaster The Controversial History and Legacy of the Fire that Caused One of NASA’s Greatest Tragedies Charles River Charles River Editors Z-Library
PDF
No ratings yet
The Apollo 1 Disaster The Controversial History and Legacy of the Fire that Caused One of NASA’s Greatest Tragedies Charles River Charles River Editors Z-Library
63 pages
NASA CSM News Reference H Missions
PDF
No ratings yet
NASA CSM News Reference H Missions
350 pages
Project Apollo
PDF
100% (2)
Project Apollo
174 pages
Safetymessage 2013 04 01 Safetyculturefivefactormodel
PDF
No ratings yet
Safetymessage 2013 04 01 Safetyculturefivefactormodel
6 pages
The Apollo Legacy
PDF
No ratings yet
The Apollo Legacy
3 pages
John Houbolt: The Unsung Hero of the Apollo Moon Landings William F. Causeyinstant download
PDF
100% (2)
John Houbolt: The Unsung Hero of the Apollo Moon Landings William F. Causeyinstant download
60 pages
Chariots For Apollo A History of Manned Lunar Spacecraft
PDF
100% (3)
Chariots For Apollo A History of Manned Lunar Spacecraft
558 pages
Apollo Program
PDF
No ratings yet
Apollo Program
47 pages
Nasa
PDF
No ratings yet
Nasa
4 pages
Apollo Experience Report The Application of A Computerized Visualization Capability To Lunar Missions
PDF
No ratings yet
Apollo Experience Report The Application of A Computerized Visualization Capability To Lunar Missions
19 pages
A Primer The U.S. Manned Space Flight Program
PDF
No ratings yet
A Primer The U.S. Manned Space Flight Program
83 pages
Apollo 11
PDF
No ratings yet
Apollo 11
359 pages
NASA Apollo 11 Mission Report PDF
PDF
No ratings yet
NASA Apollo 11 Mission Report PDF
359 pages
Project Apollo, NASA Moon Landing Program - QuickSciTech
PDF
No ratings yet
Project Apollo, NASA Moon Landing Program - QuickSciTech
9 pages
Chariots For Apollo A History of Manned Lunar Spacecraft
PDF
100% (3)
Chariots For Apollo A History of Manned Lunar Spacecraft
549 pages
20100042135
PDF
No ratings yet
20100042135
37 pages
Cox-Murray - Apollo The Race of The Moon Part 3
PDF
100% (1)
Cox-Murray - Apollo The Race of The Moon Part 3
151 pages
Apollo Moon Landing Hoax
PDF
100% (4)
Apollo Moon Landing Hoax
21 pages
NASA Facts NASA's Ranger Program
PDF
No ratings yet
NASA Facts NASA's Ranger Program
8 pages
Catalog of Apollo Experiment Operations
PDF
No ratings yet
Catalog of Apollo Experiment Operations
184 pages
Man in Space
PDF
100% (2)
Man in Space
31 pages
NASA Missions
PDF
No ratings yet
NASA Missions
62 pages
NASA Facts Rangers and Surveyors To The Moon
PDF
100% (1)
NASA Facts Rangers and Surveyors To The Moon
4 pages
Apollo by The Numbers - A Statistical Reference
PDF
100% (3)
Apollo by The Numbers - A Statistical Reference
345 pages
Apollo by The Numbers A Statistical Reference
PDF
No ratings yet
Apollo by The Numbers A Statistical Reference
345 pages
Ranger VI Press Kit
PDF
No ratings yet
Ranger VI Press Kit
54 pages
10 Years US Manned Space Flight
PDF
No ratings yet
10 Years US Manned Space Flight
9 pages
Living On The Moon
PDF
No ratings yet
Living On The Moon
8 pages
Lunar Roving Vehicle Navigation System Performance Review
PDF
No ratings yet
Lunar Roving Vehicle Navigation System Performance Review
60 pages
Apollo Training Apollo Spacecraft and Systems Familiarization
PDF
100% (1)
Apollo Training Apollo Spacecraft and Systems Familiarization
183 pages
514476main Al ST Lunarlander 7-2-09
PDF
No ratings yet
514476main Al ST Lunarlander 7-2-09
4 pages
Constellation Program Brochure
PDF
100% (1)
Constellation Program Brochure
2 pages
Apollo Experience Report Lunar Module Electrical Power Subsystem
PDF
No ratings yet
Apollo Experience Report Lunar Module Electrical Power Subsystem
16 pages
This Is NASA 1971
PDF
100% (2)
This Is NASA 1971
22 pages
News Briefing On Apollo 8 Moon Orbital Flight
PDF
No ratings yet
News Briefing On Apollo 8 Moon Orbital Flight
116 pages
Apollo 12 Mission AS-507
PDF
No ratings yet
Apollo 12 Mission AS-507
82 pages
Apollo 12 Mission Operation Report
PDF
100% (1)
Apollo 12 Mission Operation Report
111 pages
Gse 2019 Mainframes and The Moon PDF
PDF
No ratings yet
Gse 2019 Mainframes and The Moon PDF
48 pages
Apollo Experience Report Guidance and Control Systems
PDF
No ratings yet
Apollo Experience Report Guidance and Control Systems
20 pages
NASA Saturn V (Apollo 11)
PDF
No ratings yet
NASA Saturn V (Apollo 11)
184 pages
ApolloLMRadarTND6849
PDF
No ratings yet
ApolloLMRadarTND6849
24 pages
Apollo 16 - Mission Operations Report
PDF
No ratings yet
Apollo 16 - Mission Operations Report
393 pages
Ranger VII Press Kit
PDF
No ratings yet
Ranger VII Press Kit
62 pages
GCTA-Manual
PDF
No ratings yet
GCTA-Manual
94 pages
19850008613
PDF
No ratings yet
19850008613
15 pages
Rocketdyne f1 Engine Manual
PDF
No ratings yet
Rocketdyne f1 Engine Manual
93 pages
master-pnp-habshaer-fl-fl0700-fl0790-data-fl0790data
PDF
No ratings yet
master-pnp-habshaer-fl-fl0700-fl0790-data-fl0790data
79 pages
1962 Van Allen
PDF
No ratings yet
1962 Van Allen
7 pages
Radiation Analysis for Moon and Mars Missions
PDF
No ratings yet
Radiation Analysis for Moon and Mars Missions
11 pages
collins_spacecraft_communication_systems
PDF
No ratings yet
collins_spacecraft_communication_systems
47 pages
Apollo_Fuel_Cell_Powerplant_Model_PC3A-2_Component_Descriptions
PDF
No ratings yet
Apollo_Fuel_Cell_Powerplant_Model_PC3A-2_Component_Descriptions
59 pages
fligcontcompsatspaveh_051107114001
PDF
No ratings yet
fligcontcompsatspaveh_051107114001
16 pages
Ballistic motion of dust particles in the Lunar Roving Vehicle dust trails
PDF
No ratings yet
Ballistic motion of dust particles in the Lunar Roving Vehicle dust trails
6 pages
Air Power History 2017 Fall
PDF
No ratings yet
Air Power History 2017 Fall
68 pages
20100027320
PDF
No ratings yet
20100027320
34 pages
Alignment_Optical_Telescope_for_Apollo_Lunar_Module
PDF
No ratings yet
Alignment_Optical_Telescope_for_Apollo_Lunar_Module
2 pages
Road To The Moon Through WNY
PDF
No ratings yet
Road To The Moon Through WNY
17 pages
AD0669103
PDF
No ratings yet
AD0669103
266 pages
Electronics V40 N10 19670515 LM Radar Altimeter
PDF
No ratings yet
Electronics V40 N10 19670515 LM Radar Altimeter
9 pages
The Rope Memory-A Permanent Storage Device
PDF
No ratings yet
The Rope Memory-A Permanent Storage Device
14 pages
Apollo Personal Crew Equipment
PDF
No ratings yet
Apollo Personal Crew Equipment
123 pages
Automatic Theodolite For Pre Launch Azimuth Alignment of The Saturn Space Vehicles
PDF
No ratings yet
Automatic Theodolite For Pre Launch Azimuth Alignment of The Saturn Space Vehicles
6 pages
North American Rockwell
PDF
No ratings yet
North American Rockwell
36 pages
Gemini B Mol Schematics
PDF
No ratings yet
Gemini B Mol Schematics
30 pages
1964 Spaceport News Summary Final
PDF
No ratings yet
1964 Spaceport News Summary Final
47 pages
Apollo Skylab Suit - Program Management Systems Study Vol I
PDF
No ratings yet
Apollo Skylab Suit - Program Management Systems Study Vol I
254 pages
Platform: F The
PDF
No ratings yet
Platform: F The
39 pages
Saof 0008
PDF
No ratings yet
Saof 0008
138 pages
19720025202
PDF
No ratings yet
19720025202
67 pages
Lunar Sample Tool Catalog
PDF
No ratings yet
Lunar Sample Tool Catalog
101 pages
Saturn Engines - Saturn Rockets
PDF
No ratings yet
Saturn Engines - Saturn Rockets
2 pages