Volume Dan Schedule Beton

1) The document provides volume calculations and scheduling information for concrete work on a bridge project. It calculates the volume of concrete needed for pile caps, abutments, wingwalls, decking, and other structural elements. 2) The scheduling section shows that concrete pouring for the structures will occur between November 2023 to July 2024, with the majority taking place in early 2024. 3) In total, over 5,700 cubic meters of concrete in various strength classes (FC30, FC20, FC10) will be needed for the project.

Uploaded by

arif
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views1 page

Volume Dan Schedule Beton

1) The document provides volume calculations and scheduling information for concrete work on a bridge project. It calculates the volume of concrete needed for pile caps, abutments, wingwalls, decking, and other structural elements. 2) The scheduling section shows that concrete pouring for the structures will occur between November 2023 to July 2024, with the majority taking place in early 2024. 3) In total, over 5,700 cubic meters of concrete in various strength classes (FC30, FC20, FC10) will be needed for the project.

Uploaded by

arif
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

VOLUME DAN SCHEDULE PEKERJAAN BETON

VOLUME BETON BOREPILE 0,5024

No URAIAN Satuan Moro'o Idano Gali Humene Siduo Oyo Sira'a Total

1 Borepile D 80 titik 30,00 24,00 30,00 12,00 72,00 - 168,00 Vol Beton Per M' = 0,5024 M3/M'
M' 360,00 288,00 360,00 84,00 1.176,00 - 2.268,00
M3 180,86 144,69 180,86 42,20 590,82 - 1.139,44
-
TOTAL 180,86 144,69 180,86 42,20 590,82 - 1.139,44

VOLUME BETON FC 30

No URAIAN Satuan Moro'o Idano Gali Humene Siduo Oyo Sira'a Total

1 Pile Cap Abutment M3 168,00 168,00 168,00 90,72 168,00


2 Beton Abutment M3 100,44 100,44 100,44 82,82 70,44 1.217,30
3 Beton Wingwall M3 37,85 37,85 37,85 34,34 29,63 9,54 187,07
4 Beton Plat Injak M3 21,16 21,16 21,16 21,16 21,16 18,06 123,85
5 Beton Plat Lantai Jembatan M3 126,90 95,18 126,90 18,90 296,10 21,00 684,98
6 Beton Stopper M3 3,06 3,06 3,06 6,12 15,30
7 Beton Retainning Wall M3 515,52 515,52
8 Beton Balok M3 38,88 38,88
9 Beton Diafragma M3 3,24 3,24
10 Beton Parapet M3 8,38 3,12 11,50
11 Pilecap Pier 308,00
12 Beton Pier P1,P2 M3 174,10 482,10
13 Beton Box Culvert M3 91,74 91,74
14 Beton Frame Box Culvert M3 15,38 15,38

TOTAL 804,93 257,68 289,41 207,72 905,55 158,84 3.386,85

VOLUME BETON FC 10

No URAIAN Satuan Moro'o Idano Gali Humene Siduo Oyo Sira'a Total

1 Lantai Kerja Abutment M3 14,15 14,15 14,15 8,13 14,15 64,74


2 Lantai kerja plat injak M3 7,49 7,49 7,49 7,49 7,49 37,44
3 Lantai Kerja Retaining Wall M3 50,40 50,40
4 Lantai Kerja Box Culvert M3 7,34 7,34
5 Lantai kerja P1 dan P2 M3 23,29 23,29
-
TOTAL 72,04 21,64 21,64 15,62 44,93 7,34 183,21

VOLUME BETON FC 20

No URAIAN Satuan Moro'o Idano Gali Humene Siduo Oyo Sira'a Total

1 Trotoar M3 27,54 20,66 27,54 5,51 64,26 1,32 146,82


-
TOTAL 27,54 20,66 27,54 5,51 64,26 1,32 146,82

SCHEDULE BETON

TAHUN 2023 TAHUN 2024


ITEM PEKERJAAN SAT TOTAL
NOV DES JAN FEB MAR APR MEI JUN JUL AGS SEP OKT
Beton struktur, fc'30 MPa M3 - - - 105,0 816,2 496,0 612,1 1.235,6 122,0 - 3.386,9
Beton strukur, fc'20 MPa M3 - - - - - - - - - 146,8 - - 146,8
Beton, fc'10 Mpa M3 - - - 23,9 44,7 26,8 36,4 51,4 - - 183,2

BOREPILE D80 M' - - - 278,0 118,0 72,0 800,0 1.000,0 - - - -


M3 - - - 139,7 59,3 36,2 401,9 502,4 - - - - 1.139,4