FMEA Ok
FMEA Ok
Incoming
OPRough Finish
100
150
200
50
0
- 20material
Incoming
Process Intent
Function
OD
Item
Rough Machining first setup
material storage (Bell Side)
& Inspection
Machining
Rough Machining first setup (Bell Side)
51010
storage
first
Finish OD Turning & Gear DEBURRING
side boring
10a
&
Op
Turning
Finish OD Turning & Gear side boring
2020
Finish OD Turning & Gear side boring
setup
30
Finish OD Turning & Gear side boring
-&2020
Gear
Finish OD Turning & Gear side boring
(Bell
Inspection
Finish
Finish OD Turning & Gear side boring
side
2020
Finish OD Turning & Gear side boring
Side)
Op
OD
boring
DEBURRING
2020a
Finish OD Turning & bellside boring
-Turning
Finish OD Turning & bellside boring
40Cross
Finish OD Turning & bellside boring
30 &hole
bellside
Finish OD Turning & bellside boring
Cross hole boring, spherical & Back face.
30boring,
boring
- 40
OPspherical
DEBURRING
45
Multi Gauging
Revision&
60
70
FINAl
VisualINSPECTION
STORAGE/ DISPATCH
100%
100
Change
0Tapping
Number:
face. Note
: 16.12.2018
Date :16.12.2018
Siddhesh Phalke
MACHINING ALL PROCESS
Material checmical Next operation - Affected Supplier report T.C.& Material - Properties
Properties properties Subsquent Process - Nil 8 Inadequate control at 2 Third party quarterly ( Mechanical & Chemical ) 4
( Mechanical & Out of Customer end - Field Failure supplier Material T.C/ 64
inspection
Chemical ) Specification User End - Nil third party inspection report
Poor casting
surface, Improper Next operation - Machining
fettling, Core operation Affected Inadequate control at Process control at Incoming Inspection
Apperance Mismatch, lack of Subsquent Process - Nil 4 supplier 2 supplier & visual as per IIR 6 48
material, crack, Customer End -Dissatisfaction inspection
blow holes User End - Nil
Doc. No. :FMEA/1081746-00-B
FAILURE MODE AND EFFECTS ANALYSIS Rev. No. : 00
Rev. Date :16.12.2018
ITEM HOUSING MACHINED DIFFERENTIAL, 3DU PROCESS RESPONSIBILITY : PRODUCTION HEAD
PART NO& Rev. No. 1081746-00-B3 KEY DATE : 16.12.2018
CORE TEAM Prashant Shetty, R.Gunjal,Sudhir Patil, Siddhesh,Thakur,Karna,Aman,Ranjeet
PREPARED BY Siddhesh Phalke
Concept: PROCESS FMEA
Process: MACHINING FMEA DATE (ORIG) : 05/12/2018
Operation: ALL PROCESS SUPPLIER : KRANTI INDUSTRIES LTD.
Recommended
Process Intent Process Assessment Current Process Controls Action Results
Actions
S O C Respons-
Item Critical v c Current Process control D R L ibility Actio S O D
C
R
Potential Failure Current Process Controls Recommen & Target R
Function Requirement(s) Charac Mode Potential Effect(s) or Failure r Potential Causes of Failure r Prevention
Detection E P A
ded Actions Completion ns E C E
I
P
t. t n T N S Taken V C T N
S T
y c Date
Standard Operating 4
Improper setting 2 Procedure 40
Next operation - Will affect
Subsquent Process - Nil
Thickness oversize Customer End - Fitment problem 5 Set Up Approval , FPIR
User End - Nil Insert worn out 4 Tool Change Frequency 4 80
ROUGH FLANGE
THICKNESS 12.00 Standard Operating
± 0.2 Improper setting 2 Procedure 4 40
Process control at
Next operation - Machining supplier & visual Incoming Inspection
Excess Material 2 as per IIR 5 40
operation Affected Tool wear out inspection
Subsquent Process -
Radius oversize Nil Customer End - Fitment 4
Insert worn out 2 Tool Change Frequency 5 40
problem User Set Up Approval , FPIR
RADIUS OF DIA End - Nil Standard Operating
118,RADIUS Improper setting 2 Procedure 5 40
2.5,RADIUS Process control at
10,RADIUS 80.00 Next operation - Machining Incoming Inspection
Excess Material 2 supplier & visual as per IIR 5 40
operation Affected less allowance inspection
Subsquent Process - Nil
Radius undersize Customer End -Fitment 4 Insert worn out 2 Tool Change Frequency 5 50
problem User Set Up Approval , FPIR
End - Nil Standard Operating
Improper setting 2 Procedure 5 50
Next operation - Will be affected Insert worn out 3 Tool Change Frequency 5 40
Subsquent Process - Will
Flange thickness be affected
oversize 5 SETUP , FPIR
Customer End - Fitment problem
User End - Nil Standard Operating 5 40
FLANGE Improper setting 3 Procedure
THICKNESS
10.0±0.3
Less stock from previous Previous operation stock
Next operation - Will be affected operation 2 maintaining 5 50
Subsquent Process - will
Flange thickness be affected
undersize 5 Insert worn out 2 Set up Approval SETUP , FPIR 5 50
Customer End -Fitment problem
User End - Nil Standard Operating
Improper setting 2 Procedure 5 50
Standard Operating
Loading Problem 3 Procedure 4 60
Next operation - Nil
AXIAL RUNOUT Runout Out Of Subsquent Process - Nil Standard Operating
OF BEARING DIA 5 Improper setting 3 Procedure SETUP , FPIR 4 60
spec. Customer End - Fitment problem
55 User End - Nil
Standard Operating
Clamping Pressure 3 Procedure 4 60
Doc. No. :FMEA/1081746-00-B
FAILURE MODE AND EFFECTS ANALYSIS Rev. No. : 00
Rev. Date :16.12.2018
Finish OD
ITEM HOUSING MACHINED DIFFERENTIAL, 3DU PROCESS RESPONSIBILITY : PRODUCTION HEAD
Turning &
20 NO& Rev. No.
PART Gear side 1081746-00-B3 KEY DATE : 16.12.2018
COREboring
TEAM Prashant Shetty, R.Gunjal,Sudhir Patil, Siddhesh,Thakur,Karna,Aman,Ranjeet
PREPARED BY Siddhesh Phalke
Concept: PROCESS FMEA
Process: MACHINING FMEA DATE (ORIG) : 05/12/2018
Operation: ALL PROCESS SUPPLIER : KRANTI INDUSTRIES LTD.
Recommended
Process Intent Process Assessment Current Process Controls Action Results
Actions
S O C Respons-
Item Critical v c Current Process control D R L ibility Actio S O D
C
R
Potential Failure Current Process Controls Recommen & Target R
Function Requirement(s) Charac Mode Potential Effect(s) or Failure r Potential Causes of Failure r Prevention
Detection E P A
ded Actions Completion ns E C E
I
P
t. t n T N S Taken V C T N
S T
y c Date
Incoming Inspection
Next operation - Nil More Access Material 2 Report 5 50
Groove dist Subsquent Process - Nil
oversize Customer End - Dissatisfaction 5 SETUP , FPIR
User End - Fitment Insert worn out 2 Tool Change Frequency 5 50
problem
GROOVE OF DIA
55 DIST 0.6 Less stock from previous Previous operation stock
operation 2 maintaining 5 50
Next operation - Nil
Groove dist Subsquent Process - Nil
undersize Customer End - Nil 5 Insert worn out 2 Set up Approval SETUP , FPIR 5 50
User End - Fitment problem
Wrong Offset 2 Edit Key Lock 5 50
Finish OD
Turning &
20 Gear side
boring
Doc. No. :FMEA/1081746-00-B
FAILURE MODE AND EFFECTS ANALYSIS Rev. No. : 00
Rev. Date :16.12.2018
ITEM HOUSING MACHINED DIFFERENTIAL, 3DU PROCESS RESPONSIBILITY : PRODUCTION HEAD
PART NO& Rev. No. 1081746-00-B3 KEY DATE : 16.12.2018
CORE TEAM Prashant Shetty, R.Gunjal,Sudhir Patil, Siddhesh,Thakur,Karna,Aman,Ranjeet
PREPARED BY Siddhesh Phalke
Concept: PROCESS FMEA
Process: MACHINING FMEA DATE (ORIG) : 05/12/2018
Operation: ALL PROCESS SUPPLIER : KRANTI INDUSTRIES LTD.
Recommended
Process Intent Process Assessment Current Process Controls Action Results
Actions
S O C Respons-
Item Critical v c Current Process control D R L ibility Actio S O D
C
R
Potential Failure Current Process Controls Recommen & Target R
Function Requirement(s) Charac Mode Potential Effect(s) or Failure r Potential Causes of Failure r Prevention
Detection E P A
ded Actions Completion ns E C E
I
P
t. t n T N S Taken V C T N
S T
y c Date
PART FREE FROM Loose chips, sharp Next Operation - Nil 5 Less awareness 3 As per WI/PD/27 Visual inspection 4 60
20a DEBURRING BURR, SHARP edge present on Subsquent Process - Nil Tool life
EDGES, CHIPS component Customer End - Dissatisfaction NPD
End User - Nil 8 Deburring tool wear out 5 Tool Change Frequency Visual inspection 4 160 frequency 15.2.19
to be set
Doc. No. :FMEA/1081746-00-B
FAILURE MODE AND EFFECTS ANALYSIS Rev. No. : 00
Rev. Date :16.12.2018
ITEM HOUSING MACHINED DIFFERENTIAL, 3DU PROCESS RESPONSIBILITY : PRODUCTION HEAD
PART NO& Rev. No. 1081746-00-B3 KEY DATE : 16.12.2018
CORE TEAM Prashant Shetty, R.Gunjal,Sudhir Patil, Siddhesh,Thakur,Karna,Aman,Ranjeet
PREPARED BY Siddhesh Phalke
Concept: PROCESS FMEA
Process: MACHINING FMEA DATE (ORIG) : 05/12/2018
Operation: ALL PROCESS SUPPLIER : KRANTI INDUSTRIES LTD.
Recommended
Process Intent Process Assessment Current Process Controls Action Results
Actions
S O C Respons-
Item Critical v c Current Process control D R L ibility Actio S O D
C
R
Potential Failure Current Process Controls Recommen & Target R
Function Requirement(s) Charac Mode Potential Effect(s) or Failure r Potential Causes of Failure r Prevention
Detection E P A
ded Actions Completion ns E C E
I
P
t. t n T N S Taken V C T N
S T
y c Date
Cross hole
Doc. No. :FMEA/1081746-00-B
FAILURE MODE AND EFFECTS ANALYSIS Rev. No. : 00
Rev. Date :16.12.2018
ITEM HOUSING MACHINED DIFFERENTIAL, 3DU PROCESS RESPONSIBILITY : PRODUCTION HEAD
PART NO& Rev. No. 1081746-00-B3 KEY DATE : 16.12.2018
CORE TEAM Prashant Shetty, R.Gunjal,Sudhir Patil, Siddhesh,Thakur,Karna,Aman,Ranjeet
PREPARED BY Siddhesh Phalke
Concept: PROCESS FMEA
Process: MACHINING FMEA DATE (ORIG) : 05/12/2018
Operation: ALL PROCESS SUPPLIER : KRANTI INDUSTRIES LTD.
Recommended
Process Intent Process Assessment Current Process Controls Action Results
Actions
S O C Respons-
Item Critical v c Current Process control D R L ibility Actio S O D
C
R
Potential Failure Current Process Controls Recommen & Target R
Function Requirement(s) Charac Mode Potential Effect(s) or Failure r Potential Causes of Failure r Prevention
Detection E P A
ded Actions Completion ns E C E
I
P
t. t n T N S Taken V C T N
S T
y c Date
All dimension Parameter not Proper gauging/ Corelation activity per 15 Defective parts highlighted
Multi Gauging
60
100% should be with in ok / skipped Customer End - Dissatishfaction 5 co-rrelation study 3 days with red colour on screen 4 60
specification
WASHING AS PER
WASHING W.I Work Instruction, daily
Washing skipped,
80 OILING & OILING & Run incomplete cycle Customer End - Dissatishfaction 4 RUSTY / UNCLEAN/ 3 check sheet Process audit 4 48
PACKING PACKING AS PER
W.I