SSBC 2023 Rules
SSBC 2023 Rules
Bridge Competition
2023 Rules
WELCOME
This document, which is available at aisc.org/ssbc, describes the Student Steel Bridge
Competition (SSBC) and states the 2023 rules for the Regional Competitions and National
Finals. Clarifications, which include any revisions to the rules, are published at
aisc.org/ssbc and do not appear in this document although they are formal addenda to
the rules. The website includes the form for requesting clarifications and other information.
Information at the website takes priority over any other source except as herein noted.
Cover Image taken by Steve Buhman, New Leaf Studio. Rules published September 6, 2022.
● New or updated definitions of bend, connection, corner, and faying surface. (Glossary)
● New problem statement involving the San Diego National Wildlife Refuge (Section 3)
● Change to the maximum number of eligible teams from a Regional Competition that
can advance to the National Finals (Sub-Section 4.4.2)
● Updated Construction Economy and Structural Efficiency equations (Sub-Sections
6.2.5 and 6.2.6)
● Updated lateral and vertical load locations (Table 7.1)
● Loose bolts and loose nuts shall only be used to create a connection between
members (Sub-Section 8.2.2)
● Bolts and nuts of any kind shall not be welded to the bridge (Sub-Section 8.2.2)
● New dimensional requirements for the bridge (Sub-Section 9.3)
● Updated connection requirements and penalties for violations (Sub-Section 9.4)
● Addition of a designated builder area in the staging yard for the start of construction
(Sub-Section 10.6.1)
● Single lateral load test with a 1 inch allowable sway (Sub-Section 11.4)
● Updated vertical load locations, deflection observation locations, and sway
observation locations (Sub-Section 11.5)
● Clarification on the Regional Competition appeals procedure (Sub-Section 15.1)
● New construction site plan (DWG 1)
● New bridge envelope (DWG 2)
2023 Rules | 1
TABLE OF CONTENTS
page
Glossary 3
1. Mission and Summary 8
2. Introduction 10
3. Problem Statement 11
4. Eligibility 13
5. Safety 16
6. Scoring 17
7. Schedule of Competition 23
8. Material and Component Specifications 26
9. Structural Specifications 28
10. Construction Regulations 32
11. Load Test Instructions 38
12. Equipment Provided by Host 44
13. Interpretation of Rules 46
14. Judging 47
15. Appeals 48
APPENDIX - DRAWINGS
Site Plan Diagram 51
Bridge Elevation Diagram 52
Lateral Load Test Plan Diagram 53
Vertical Load Test Plan and Elevation Diagram 54
2023 Rules | 2
GLOSSARY
Accident. Fault committed during timed construction and subsequently penalized.
Aesthetics. Award category based on the presentation of the bridge as it will be erected
during timed construction with all parts of the assembled bridge visible for judging and
the poster describing the design.
Aggregate deflection. The sum, rounded to the nearest 0.01 inch, of the absolute values
of deflections measured at D1 and D2.
Assembled Tool. A tool that is created by combining two or more tools during timed
construction.
Bend. An angle formed by deforming a plate or part of a steel section along a line or
crease.
Bolt. An unaltered, commercially available rigid connector that contains a head and has
external threads around its full circumference, but the threads need not extend over its
full length.
Bridge. Structure constructed of members, loose bolts, and loose nuts that spans the river
and is supported by piers.
Builder. Undergraduate or graduate student who constructs the bridge and is part of a
competing team. See Section 4, “Eligibility”.
Captain. One builder designated to represent the team for the entire competition, and who
signifies when the builders are ready to start timed construction, declares the finish of
timed construction, and signs the data forms.
Connection. A location where all faying surfaces resulting from two or more members
coming in contact are penetrated by at least one loose bolt and secured by a loose nut
preventing the members from separating at that location without first removing the
loose bolt(s) that connect them.
Constructed portion. A single member in contact with the footing, or two or more
members in contact with one another, with or without loose nuts and loose bolts,
assembled during timed construction by builders on the ground in the construction
zone.
2023 Rules | 3
Construction cost. Dollar amount used to determine a bridge’s construction economy
based on the number of builders, construction time, total time and load test penalties.
Construction site. The location where all construction activities occur comprising the river,
construction zones, transportation zones and the staging yards.
Construction speed. Award category based on the total time required for construction of
the bridge.
Construction zone. Location in the construction site where builders put the members
together to construct the bridge.
Corner. An angle between two, non-coplanar plates and/or sides of a steel section that is
formed by welding the plates and/or steel sections together.
Cost estimation. Award category based on the estimate of the expected overall
performance rating of a team’s bridge submitted to the host school prior to the
selection of the controlling load case.
D1, D2. Locations where the vertical deflections are measured during vertical load testing.
Data form. Forms printed from the official scoring spreadsheet used by judges to record
data collected for each team throughout the competition.
Decking. Grating that spans transversely between stringers and is used to hold load
placed on the bridge.
Deflection. Vertical translation of the bridge or parts of the bridge under load.
East end. End of the bridge determined by a randomizing process (e.g., coin flip) and
opposite the west end.
Faying Surface. Surface of a member that is in contact with the surface of another
member at a connection.
Footing. Areas marked on the ground within the construction zones where the bridge may
contact the ground.
2023 Rules | 4
Ground. Floor inside the site boundary, including footings, construction zones,
transportation zones, and staging yards, but excluding the river.
Guest Competitor. A team from a school that is not eligible to compete per Sub-Section
4.3.2 but has obtained the approval of ASCE and the Regional Competition host school
to participate in accordance with Sub-Section 4.3.3.
Head Judge. Person with full authority over the conduct of the competition, safety and
interpretation of the rules.
Judge. Person who assists the head judge with the conduct of the competition, safety and
interpretation of the rules.
L1, L2. Dimensions for positioning the decking units for the vertical load test that also
define locations of observed deflection and sway during the vertical load test.
Lateral restraint. Means of inhibiting sliding of the bearing surfaces during lateral loading
applied by the loading crew.
Load. Weight applied to the bridge to assess its stiffness and strength.
Loose bolt. Bolt not installed in or welded to the constructed portion of the bridge.
Measured weight. The weight of the bridge, not including decking, tools, lateral restraint
devices, and posters, as determined by scales provided by the host school.
North side. Side of the bridge relative to the west and east ends that corresponds to the
location where measurement D1 is taken during vertical loading.
Nut. A commercially available, mechanically unaltered portion of a connector that has the
shape of a hexagonal prism over its full length and contains internal threads around its
full circumference over its full length.
Overall performance. Overall award category based on the sum of construction cost,
structural cost, and any fines incurred as a violation of a Team Contract.
Personal protective equipment. Articles provided by the team for safety worn by builders
and team members conducting construction and loading.
2023 Rules | 5
Poster. Informative flat display that must be posted and is judged during aesthetics
judging.
Pouch. Optional article of clothing that is used to carry nuts, bolts, and tools and includes
tool belts, magnets, lanyards, and other accessories worn by builders having the same
function.
River. A restricted natural feature in the construction site that builders are not allowed to
enter.
S. Dimension for positioning the decking unit for the lateral load test that also defines the
location where the lateral load is applied and sway is measured during the lateral load
test.
Safety support. Equipment provided by the host school used to limit the consequences of
a bridge collapsing.
Scales. Calibrated equipment provided by the host school used to measure the measured
weight of the bridge.
Scoring spreadsheet. Official location where a team’s score is input by the scoring official
at the end of the team’s competition.
South side. Side of the bridge relative to the west and east ends that corresponds to the
location where the lateral load is applied and sway is observed during the lateral load
test as well as where measurement D2 is taken and sway is observed during vertical
loading.
Staging yard. Location within the construction site occupied by builders, tools, and
materials at the start and finish of timed construction.
Steel. Iron alloy that is strongly attracted to the magnet provided by the host school.
Stiffness. Award category based on the bridge’s aggregate deflection under vertical
loading.
2023 Rules | 6
Structural cost. Dollar amount used to determine a bridge’s structural efficiency based on
its total weight, measured weight, aggregate deflection, and load test penalties.
Team. Group of students from the school that they are representing who are
undergraduate or graduate students during all or part of the fall through spring of the
current competition academic year.
Template. Equipment provided by the host school to measure clearances within the
passageway of the bridge and the location of the stringers at the top of the bridge.
Tool. A device provided by a team that is used during construction of the bridge, but is not
part of the completed bridge.
Transportation zone. Portion of the construction site between the construction zones and
staging yards over which builders carry members, tools, nuts, and bolts.
Video. Optional award category based on a recording that conveys the features of the
design, analysis process undertaken to verify the design meets the structural
specifications, fabrication methods, construction procedures and overall appeal of the
bridge to the owner.
West end. End of the bridge that is opposite the east end of the bridge and from which L1,
L2, and S are measured.
2023 Rules | 7
Section 1
MISSION AND SUMMARY
VISION
Empower students to acquire, demonstrate, and value the knowledge and skills that they
will use as the future generation of design professionals and to contribute to the structural
steel design community and construction industry.
MISSION
Challenge students to extend their classroom knowledge to a practical, hands-on steel
design and construction project that grows their interpersonal and professional skills,
encourages innovation, and fosters impactful relationships between students with faculty,
industry professionals and professional organizations.
SUMMARY
Civil Engineering students are challenged to an intercollegiate competition that
supplements their education with a comprehensive, student-driven project experience
from conception and design through fabrication, erection, and testing. This experience
culminates in a steel structure that meets client specifications and optimizes performance
and economy. The Student Steel Bridge Competition (SSBC) increases awareness of real
world engineering issues such as spatial constraints, material properties, strength,
serviceability, fabrication, erection processes, safety, aesthetics, project management, and
cost estimating. Success in competition requires application of engineering principles and
theory, effective teamwork, and inclusive practices. Future engineers are stimulated to
innovate, practice professionalism, and use structural steel efficiently.
Students design and erect a steel bridge by themselves but may consult with faculty and
other advisors. Students gain maximum benefit if they fabricate the entire bridge
themselves. However, because appropriate shop facilities and supervision are not
available at all schools, students may use the services of a commercial fabricator if they
develop the work orders and shop drawings and observe the operations. Students are
encouraged to maximize their involvement in fabrication.
Safety is paramount. AISC and ASCE request that competitors, advisers, hosts, and
judges take all necessary precautions to prevent injury to competitors, judges, host
personnel, and spectators. Risky procedures are prohibited. Load testing is stopped if
sway or deflection exceeds specified limits, or if collapse is imminent. Bridges that cannot
be constructed and loaded safely are withdrawn from competition and are only eligible for
awards in the categories of aesthetics and video. In addition, the rules identify and
penalize construction errors that represent accidents in full-scale construction.
2023 Rules | 8
The Student Steel Bridge Competition provides design and management experience,
opportunity to learn fabrication processes, and the excitement of networking with and
competing against teams from other schools.
AISC and ASCE require all students to follow safety precautions in regards to the
COVID-19 pandemic when participating in activities associated with the SSBC. Student
teams should respect and follow all safety rules put in place by their respective schools as
safety and student health are paramount. Given the continually changing environment
surrounding COVID-19, modifications to the Regional Competitions and National Finals
may be required and will be assessed as deemed appropriate.
2023 Rules | 9
Section 2
INTRODUCTION
The rules simulate a request for proposal that requires a scaled model to demonstrate the
efficacy of competing designs. Section 3, “Problem Statement,” relates the rules to
realistic challenges encountered in bridge design and construction.
The rules accommodate a variety of designs and encourage innovation. Designers must
consider the comparative advantages of various alternatives. Successful teams compare
alternatives prior to fabrication using value analysis based on scoring criteria. The rules
change every year to renew the challenge and ensure new bridges are designed and built.
The rules are intended to be prescriptive, but may require interpretation. The procedure
for requesting clarification of the rules is described in Section 13, “Interpretation of Rules.”
Competitors, judges, and host personnel are encouraged to read this rules document from
beginning to end and then review the Host and Competitors Guides at aisc.org/ssbc.
That site also is the source of the official scoring spreadsheet which generates data forms
for recording data. Judges should be familiar with these data forms prior to competition.
2023 Rules | 10
Section 3
PROBLEM STATEMENT
The San Diego National Wildlife Refuge was established in 1996 and provides over 12,300
acres of preserved habitat as part of the San Diego Multiple Species Conservation
Program. Open grasslands, riverine corridors, and oak woodlands are some of the
restored habitats that can be found within the refuge. The refuge stretches from the city of
Jamul to communities in Spring Valley and eastern Chula Vista and provides not only a
safe location for wildlife, but also opportunities for hiking, mountain biking, and horseback
riding. Near the trailhead of the Sweetwater Interpretive Loop trail is located the historical
four hundred and sixty feet long and twenty-two feet wide Sweetwater River Bridge, which
is a steel Parker Through Truss bridge built in 1929. The bridge was retired from road use
in 1987 and now serves as a pedestrian bridge and the gateway into the San Diego
National Wildlife Refuge.
In order to provide better access for service vehicles and more opportunities for San Diego
National Wildlife Refuge users to access trails on both sides of the Sweetwater River, a
new bridge that pays tribute to the Sweetwater River Bridge’s use of steel has been
proposed further down river. The use of steel for the bridge also provides versatility in the
design, ease of prefabrication, ability to rapidly erect, superior strength to weight ratio,
durability, and a high level of recycled content. The bridge shall be aesthetically pleasing
and have the ability to support pedestrians, bicycles, horses, park service vehicles, and
emergency vehicles while prohibiting private motor vehicles.
A feasibility study is being conducted that includes a competition to identify the best
design for the new bridge. Your company is invited to compete by submitting a 1:10 scale
model to demonstrate its concept. The bridge must have the ability to support the weight
of pedestrians, cyclists, equestrians, and maintenance and park vehicles. Scale models
will be erected under simulated field conditions and will be tested for stability, strength,
and serviceability using standardized lateral and vertical loads. Structural cost,
construction cost and duration, and aesthetics are important considerations. Virtual costs
are assigned to critical features, including a sliding scale for material that promotes
robustness without wastefulness. The ability of your company to accurately estimate the
overall performance of your bridge also will be judged. Engineers associated with the U.S.
Fish and Wildlife Service will judge the competition and will award the design/build
contract to the company whose model satisfies the specified requirements and best
achieves the project objectives.
In order to maintain existing habitats, no construction activity can take place within the
river’s confines. Designs with permanent or temporary piers within the confines of the river
will not be considered. Soil conditions and concerns about existing wildlife habitats also
preclude temporary piers elsewhere, as well as restricting the location of footings and the
2023 Rules | 11
size of construction zones. Remote staging of material and equipment is required. The
size and quantity of members to be transported also is limited. Models will not include
deck, foundations, and approaches.
Design companies are encouraged to gather diverse teams and treat everyone with
respect. A team that creates a respectful, welcoming, and inclusive environment, and is
not predisposed to defined roles and biases, will benefit greatly from the creativity that
diversity affords.
2023 Rules | 12
Section 4
ELIGIBILITY
4.3.2 A school is eligible to compete if it has an ASCE student chapter located in North
America, which is in good standing with ASCE at the start of the Regional Competition,
and is competing in their ASCE assigned Student Conference. A list of conference
assignments and symposium host chapters are listed at
asce.org/communities/student-members/conferences.
4.3.2.1 For an ASCE Student Chapter to be in good standing with ASCE at the start
of a Regional Competition, they must:
(a) have paid their annual dues, as received by ASCE, no later than 11:59 p.m. EST on
February 1, 11:59 p.m.;
(b) have submitted their student chapter full Annual Report or EZ Annual Reporting
Form no later than 11:59 p.m. on February 1, 2023
2023 Rules | 13
4.3.3.1 Have an established AISC Student Club and have not competed as a Guest
Competitor for more than three consecutive years; or
4.3.3.4 Have an ASCE Student Chapter that is not in good standing with ASCE
prior to the start of the Regional Competition according to Sub-Section 4.3.2.1.
4.3.4 Guest Competitors will be scored and are eligible to receive the awards in Section
6.
4.3.5 A team shall consist only of undergraduate and graduate students enrolled at the
school for which they are representing during all or part of the fall through spring of the
current competition academic year.
4.3.6 The official scoring spreadsheet shall be used, and all teams shall be listed on that
spreadsheet. The official scoring spreadsheet may be downloaded from aisc.org/ssbc.
4.3.7 The host school shall promptly submit scans of the individual team’s data forms
and the completed official scoring spreadsheet file for the Regional Competition to
[email protected]. Teams from that Regional Competition will not be invited to
the Student Steel Bridge Competition National Finals until the data forms and scoring
spreadsheet file are received and eligibility is confirmed.
4.4.1.1 An ASCE Student Chapter must be in good standing with ASCE as shown
that they:
(a) Have paid their annual dues, as received by ASCE, no later than February 1, 11:59
p.m. EST.
(b) Submitted their student chapter’s full Annual Report no later than 11:59 p.m. EST
on February 1, 2023 and have received a minimum score of 40 points out of a
possible 100. Student Chapters that submit an EZ annual reporting form do not
qualify to advance on to the National Finals.
2023 Rules | 14
4.4.1.2 An ASCE Student Chapter must attend and participate in their assigned
Student Symposium as shown through their school’s:
(a) On-time attendance and active participation by a member of the ASCE Student
Chapter at the Student Symposium Business Meeting.
4.4.2 The maximum number of eligible teams from a Regional Competition that will be
invited to compete in the National Finals is based on the number of non-guest competitors
that competed at that Regional Competition (that is, presented bridges and staged them
for timed construction).
(1) The single eligible team with the best overall performance rating will be invited from
a Regional Competition in which two to five teams competed.
(2) The top two eligible teams in overall performance will be invited from a Regional
Competition in which six to ten teams competed.
(3) The top three eligible teams in overall performance will be invited from a Regional
Competition in which eleven to sixteen teams competed.
(4) The top four eligible teams in overall performance will be invited from a Regional
Competition in which seventeen or more teams competed.
4.4.3 In addition to qualifying for the National Finals by meeting the requirements of
Sub-Sections 4.4.1 and 4.4.2, the following exceptions may be made:
4.4.3.1 The Rules Committee may, with suitable notice to participating teams,
modify the number of qualifying schools as well as develop rules for additional “wildcard”
participants and qualifiers based on receiving special awards;
4.4.3.3 AISC may, with ASCE’s consent, name additional participants in the
National Finals.
4.4.4 A team competing at the National Finals shall consist only of undergraduate and
graduate students who were enrolled at the school for which they are representing during
all or part of the fall through spring of the current competition academic year leading up to
the National Finals.
2023 Rules | 15
Section 5
SAFETY
Safety has the highest priority; risk of personal injury will not be tolerated. Judges are
empowered to halt and prohibit any activity that they deem to be hazardous. If a bridge
cannot compete safely, it must be withdrawn from competition.
Sub-Sections 9.4, 9.5, 10.2, 10.3, 11.1, 11.2, and 11.5.2 of these rules identify potential
hazardous conditions and actions that can result in withdrawing a bridge from competition
if not corrected. Judges will document these safety violations by checking the appropriate
boxes on the data forms. If the problem is not listed, a judge should write a brief
description of the problem on the data form.
Students are requested to practice safe fabrication procedures and seek appropriate
instruction and supervision. Sub-Section 8.1 provides a warning for a welding hazard, and
precautions listed in Sub-Sections 11.1, 11.2, 11.5.1.2, and 11.5.2 guide safe load testing
prior to competition.
2023 Rules | 16
Section 6
SCORING
6.2.1 Aesthetics
An award is given for aesthetics. All bridges presented for aesthetics judging and staged
for timed construction are eligible for this award. The bridge’s appearance and a poster
describing the bridge design contribute to the Aesthetics ranking. Aesthetics is judged by
the following criteria.
2023 Rules | 17
6.2.1.1 Bridge appearance.
6.2.1.2.2 The following items are encouraged on the poster, but remain optional,
and will not factor into aesthetics judging:
(1) a brief summary and/or pictures on the poster of any diversity, equity, and inclusion
activities that have been undertaken,
2023 Rules | 18
(2) names of financial sponsors (alternatively, an optional second poster that can
accommodate financial sponsors’ logos can be used), and
(3) additional information of the team’s choice.
6.2.1.3 Aesthetics is the tie breaker for all competition categories unless otherwise
indicated in the rules. Judges shall not declare ties in aesthetics.
6.2.3 Lightness
The bridge with the least total weight will win in the lightness category. Total weight is
measured weight plus weight penalties prescribed in Sub-Sections 8.2, 9.3, and 10.4.2.
Decking, tools, lateral restraint devices, and posters are not included in measured or total
weight.
6.2.4 Stiffness
The bridge with the lowest aggregate deflection will win in the stiffness category.
Aggregate deflection is determined from measurements as prescribed in Sub-Section
11.5.
2023 Rules | 19
6.2.5 Construction Economy
The bridge with the lowest construction cost (Cc) will win in the construction economy
category. Construction cost is computed as
Cc = Construction time (minutes) x number of builders (persons)
x 100,000 ($/person-minute) + (Total time - Construction time)
x 250,000 ($/minute) + load test penalties ($).
“Load test penalties” are prescribed in Sub-Section 11.5.2.
6.2.8.1 Prior to the selection of the load case as prescribed in Sub-Section 7.1(8)
(e.g., at the captain’s meeting), all teams will submit their estimated overall performance
rating to the host school for all 6 load cases. The host school will input the values into the
scoring spreadsheet.
6.2.8.2 The team that has the smallest absolute value of the difference between
the actual overall performance rating and estimated overall performance rating will win the
award.
6.2.8.3 Ties for the cost estimation award will first be broken by the team that
overestimates their overall performance rating being ranked ahead of a team that
underestimates their overall performance rating and then by aesthetics ranking, if
necessary.
2023 Rules | 20
6.2.9 Video
Teams may compete in the optional video award category provided their bridge is
presented for aesthetics judging and staged for timed construction at a Regional
Competition. Being able to convey the features of the bridge’s design, the analysis
conducted to verify that the design meets the structural specifications, the fabrication
process, and the procedure by which it will be constructed is critical to a client accepting
the work of an engineer. Videos are one means of accomplishing this task if they are
professional, concise, informative, and consider the level of knowledge of the viewing
audience.
All teams competing in the optional video award category must submit their entry before
5:00 p.m. EDT on May 1, 2023 to be considered. The submission form can be found at
aisc.org/ssbc. The winning team will be announced at the National Finals and their video
will be shown during the National Finals’ award ceremony.
2023 Rules | 21
6.4 SPECIAL AWARDS
In addition to the competition category awards, special awards are given to eligible
participating teams. These awards do not factor into the category scores or overall
performance rating of a bridge as defined in Sub-Section 6.2.7.
The Frank J. Hatfield Ingenuity Award is presented to a team that shows the most
engineering ingenuity in the design and/or construction of their bridge based on the
requirements of the competition rules.
All teams that compete at the National Finals are eligible for this award.
2023 Rules | 22
Section 7
SCHEDULE OF COMPETITION
In the months before the competition, students design their bridges, fabricate members,
test load, designate the competition team, and practice construction. The regional host
school procures a venue, organizes equipment (Section 12), and recruits judges (Section
14). Judges prepare by reviewing the current rules and all clarifications (Section 13).
Clarifications, some of which may have been posted immediately prior to the competition,
are found at aisc.org/ssbc.
2023 Rules | 23
(11) Judges inspect assembled bridges. For details, see Section 9, “Structural
Specifications.” Between corrections described in Sub-Section 9.4 and the start
of load testing, force shall not be applied to the bridge except as necessary to
move it. For example, leaning or sitting on the bridge is not allowed.
(12) West and east ends of the bridge are determined individually for each bridge by a
randomizing process (e.g., coin flip).
(13) Bridges are weighed (if it is impractical to weigh the entire bridge, its individual
parts may be weighed). All bridges shall be weighed, including those that fail
as well as those which are withdrawn from competition and are not eligible
for all awards.
(14) Bridges are load tested. See Section 11, “Load Test Instructions,” for details.
(15) Data entry is conducted. After a team has completed all phases of the
competition, data for the team is transcribed from the data forms into the official
scoring spreadsheet and checked by the captain. After data entry has been
completed, a copy of the team’s “Computation” worksheet from the scoring
spreadsheet is given to the captain electronically or on paper.
(16) Scores and rankings are determined using the official scoring spreadsheet.
(17) Paper or electronic copies of the “Rankings” worksheet of the official scoring
spreadsheet are distributed to captains of all teams at the awards ceremony.
(18) The host school submits scans of each individual team’s data forms and the
completed official scoring spreadsheet file by email to
[email protected] as soon as possible after completion of the
competition.
(19) The host school retains the data forms until a confirmation email has been
received.
TABLE 7.1 Determination of L1, L2, and S
N L1 L2 S
1 4’-0” 7’-6” 7’-0”
2 4’-6” 8’-6” 7’-0”
3 7’-0” 13’-0” 10’-0”
4 8’-6” 13’-6” 13’-0”
5 10’-0” 15’-0” 10’-0”
6 11’-6” 16’-0” 13’-0”
7.2 ALTERNATIVES
The order recommended above may be altered. However, it is essential that
(1) Bridges are not modified after the die is rolled with the exception of modifications
made to the bridge during the construction portion of the competition and made
solely for the purpose of rectifying rules violations.
(2) Bridges are not modified between aesthetics judging and timed construction.
(3) Estimated overall performances ratings are submitted by all teams prior to any
team weighing their bridge or starting timed construction.
2023 Rules | 24
(4) No components or tools are added to or removed from the construction site after
staging for inspection.
(5) Modifications between timed construction and load testing are limited to
connection corrections described in Sub-Section 9.4.
2023 Rules | 25
Section 8
MATERIAL AND COMPONENT
SPECIFICATIONS
8.1 MATERIAL
Some grades of steel are not magnetically attractive. If any member, nut, or bolt is not
strongly magnetic steel or incorporates parts that are not strongly magnetic steel, the
bridge will not be eligible for awards listed in Sub-Section 6.2, except for aesthetics and
video. The bridge shall be constructed and load tested at the head judge’s discretion if
that can be done safely within available time. See Sub-Section 8.2 for specifications on
“members”, “loose bolts”, and “loose nuts”.
Health Advisory: The bright silvery or colored coating on bolts, nuts, threaded rods, and
other hardware contains zinc and cadmium. At welding temperatures, both elements
create hazardous fumes. Inhalation of zinc fumes causes symptoms resembling those of
influenza. Cadmium gas can damage lungs and kidneys and is a potential carcinogen.
Only plain (uncoated) hardware should be welded.
8.2 COMPONENTS
Violation of the specifications in this Sub-Section (8.2) will result in penalties being added
to the weight of the bridge. The penalty is 20 pounds for each individual
non-compliant loose nut and loose bolt, and 40 pounds for each individual
non-compliant member. See Sub-Sections 8.2.2, 8.2.3, and 8.2.4 for specifications on
“members”, “loose bolts”, and “loose nuts”.
8.2.1 Bridge
A bridge shall be constructed only of members, loose bolts, and loose nuts. Solder,
brazing, and adhesives are not permitted. Exceptions: Purely decorative items such as
coatings and decals are permitted, and bridge parts may be labeled.
8.2.2 Members
8.2.2.1 Parts of a member are welded together. A member shall retain its shape,
dimensions, and rigidity during timed construction and load testing. A member shall not
have parts that are cables. Exception: Deformations caused by mechanical strain (e.g.,
bending, stretching) during construction and load testing are not violations.
8.2.2.2 All members shall fit into a right rectangular prism (i.e., box) of dimensions of
3'-6” x 6” x 4”.
2023 Rules | 26
8.2.2.3 Loose bolts shall only be used to create a connection between members.
8.2.2.4 Loose nuts shall only be used to create a connection between members.
8.2.2.5 Bolts and nuts of any kind shall not be welded to the bridge.
8.2.2.6 Holes in members for loose bolts shall not be threaded.
8.2.3.2 Nominal length of loose bolts shall not exceed 3” measured from the bottom
of the head to the end. Loose bolts shall have external threads that extend around the full
circumference, but need not extend over their full length.
8.2.4.2 Loose nuts shall have internal threads that extend for the full circumference
over their full length.
2023 Rules | 27
Section 9
STRUCTURAL SPECIFICATIONS
9.1 MEASUREMENT
Conformance with the specifications in this Section (9) will be checked with the bridge in
its as-built condition after termination of timed construction and before the bridge is
moved from the construction site or load tested. The bridge shall not be modified or
distorted from its as-built condition in order to conform to these specifications except as
prescribed by Sub-Section 9.4. Dimensions will be checked without decking or applied
load. Judges may touch the bridge but shall not turn nuts or bolts or alter the
condition of the bridge in any other way.
9.2 FUNCTIONALITY
If any specification in this Sub-Section (9.2) is violated, the bridge will not be eligible for
awards in any category, except for aesthetics and video. The bridge shall be load tested at
the head judge’s discretion if it can be done safely within available time.
9.2.1 The bridge shall have exactly two stringers, each of which is contiguous. Each
stringer shall extend from inside the west end footing to inside the east end footing.
Sections of the stringer may be part of members that serve other functions in the bridge.
See the Bridge Elevation Diagram.
9.2.2 The bridge shall provide access for safely placing 3’-6” wide decking and load
at any point between the ends of the stringers.
9.2.3 The decking shall not be attached or anchored to the bridge. This prohibition
includes but is not limited to protrusions, irregularities, and textures that inhibit movement
of decking relative to the stringers.
9.2.4 Decking shall not distort the bridge from its as-built condition when positioned
for lateral and vertical load testing.
9.3 USABILITY
Specifications in this Sub-Section (9.3) are illustrated by the Bridge Elevation Diagram.
2023 Rules | 28
A weight penalty will be assessed for each specification in this Sub-Section (9.3) that
is violated, rather than for every violation of that specification. If there are multiple
violations of the same specification, the penalty will be based on the largest violation.
The penalty for violation of each of the specifications in this Sub-Section (9.3) will be an
addition to the weight of the bridge determined as follows:
(1) 20 pounds for a dimensional violation not exceeding 1/4”,
(2) 100 pounds for a violation greater than 1/4” but not exceeding 1”,
(3) 200 pounds for a violation greater than 1” but not exceeding 2”
(4) 400 pounds for a violation greater than 2” but not exceeding 3”, and
(5) if a violation exceeds 3”, the bridge will not be eligible for awards in any category,
except aesthetics and video. The bridge shall be load tested at the head judge’s
discretion if it can be done safely within available time.
9.3.1 The bridge shall not touch the river or the ground outside the footings except
when the exception in Sub-Section 10.4.2 is invoked
9.3.2 The bridge shall not extend more than 5’-0” above the ground or river.
9.3.3 The bridge shall not be wider than 5’-0” at any location along the span.
9.3.4 Vertical clearance shall be provided at all points directly over the ground and
river. The clearance shall be no less than 4”, measured from the surface of the ground or
river. Parts of the bridge, including nuts and bolts, shall not extend below this limit.
Exception 1: No clearance is required for the portion of the bridge for which the exception
in Sub-Section 10.4.2 is invoked. Exception 2: No clearance is required over the footings
except as necessary to accommodate restraint applied during the lateral load tests
described in Sub-Section 11.4.1.
9.3.5 At the ends of the bridge, parts of the bridge shall not extend away from the
river beyond the vertical planes that make up the construction zone boundary shown on
the Site Plan Diagram.
9.3.6 Each stringer shall be at minimum 23 feet long and at maximum 24 feet long,
measured along their top.
9.3.7 The tops of the stringers shall be no more than 2’-2” and no less than 1’-10”
above the surface of the river, ground, or footings at any location along the span.
9.3.8 The bridge shall provide a straight, clear decking support location conforming
to the Stringer Template detail on the Bridge Elevation Diagram. To verify compliance with
9.3.8.1 and 9.3.8.2, judges will slide the stringer template along the tops of the stringers
while holding it plumb and perpendicular to the span of the bridge. If the same
obstruction causes a violation of both 9.3.8.1 and 9.3.8.2, the judge will record only the
larger violation.
2023 Rules | 29
9.3.8.1 At no location along the full length of the stringers shall part of the
bridge, including nuts and bolts, obstruct passage of the stringer template. The
measurement for non-compliance is the distance an obstruction projects onto the stringer
template, measured perpendicularly from the obstructed edge.
9.3.8.2 The tops of both stringers shall contact the tops of the two rabbets in the
stringer template at every location along the full length of the stringers during the
verification procedure described in 9.3.8. The measurement for non-compliance is the
vertical distance between the top of a rabbet and the top of the corresponding stringer.
9.3.9 Tops of stringers shall be free of splits, separations, protrusions, and abrupt
changes in elevation or slope, except that between adjacent members that comprise a
stringer there may be a horizontal separation not exceeding 1/4” and a change in elevation
not exceeding 1/8”.
During inspection judges may touch the bridge, bolts, and nuts, but shall not turn nuts
or bolts, or alter the condition of the bridge in any other way.
9.4.1 All locations where one member touches another member require a
connection. Multiple members may be connected at the same location. If two or more
members touch at multiple locations where the points of contact are not associated with a
continuous surface or occur at different locations along the member, then a connection
shall be required at each location.
9.4.2 Each connection shall contain at least one and at most two faying surfaces
associated with each member being connected.
2023 Rules | 30
9.4.2.1 Faying surfaces are the only locations where members are in contact with
each other.
9.4.2.2 Faying surfaces that are a gradual curve shall not have inflection points.
Contact surfaces on either side of a corner or bend, as opposed to a gradual curve, shall
be treated as separate faying surfaces.
9.4.2.3 Every faying surface shall be penetrated by at least one loose bolt
secured by a loose nut such that the members cannot be separated without first
unscrewing and removing the loose bolt(s) that connects them. A loose bolt may connect
more than two members.
9.4.2.4 Minor, unintentional gaps between the faying surfaces of members due to
member and fabrication imperfections shall be allowed and treated as continuous faying
surfaces provided the resulting waves or protrusions in the faying surfaces are not large
enough to resist movement without the presence of a bolt.
9.4.3 Each individual hole in a member for a loose bolt shall be completely
surrounded by the member. Furthermore, such holes in the outer plies of a connection
shall be small enough that the nut or bolt head cannot pass through.
9.4.4 Each individual nut shall at least fully engage the threads of the matching bolt.
That is, the terminal threads of the bolt shall extend beyond or be flush with the outer face
of the nut. The threads of the nut shall match the bolt so that installation and removal
require relative rotation.
9.5 INSPECTABILITY
Each individual faying surface, nut, head of a bolt, and threaded end of a bolt shall be
visible in the completed bridge so that compliance with Sub-Section 9.4 can be verified. If
any individual faying surface, bolt head, threaded end of a bolt, or nut cannot be
inspected, a penalty of 2 minutes will be added to the construction time for each
individual violation. Bridges with violations will be eligible for awards in all categories and
will be load tested provided that it can be done safely in the opinion of the head judge.
2023 Rules | 31
Section 10
CONSTRUCTION REGULATIONS
10.1.2 All construction activities are conducted within the site boundary. The host
school marks the site boundary and its enclosed features on the floor before the
competition, as illustrated by the Site Plan Diagram.
10.1.3 Builders on the ground in the construction zones put members together to
assemble the bridge.
10.1.4 Builders carry members, tools, loose nuts, and loose bolts across the
transportation zones.
10.1.5 Builders shall wear hardhats that meet ANSI standard Z89.1 and protective
eyewear or safety goggles that meet ANSI standard Z87.1 as personal protective
equipment during all construction activities.
10.1.6 There may be multiple constructed portions. If a member that is part of the
constructed portion is removed from contact with the constructed portion, it becomes an
individual member again.
10.2.1 Only builders and judges are permitted within the site boundary during timed
construction. Other team members and associates of the team, coaches, faculty,
advisers, and spectators shall remain in designated areas at a distance from the
construction site that assures they are not at risk and cannot interfere with the
competition.
2023 Rules | 32
10.2.4 A tool shall fit within a right rectangular prism (i.e., box) of dimensions 3'-6” x
6” x 4”. During timed construction, multiple tools may be combined to form an assembled
tool that does not need to meet the requirements of Sub-Section 10.2.4.
10.2.5 Containers of lubricant shall not be in the construction site at any time.
10.3.1 Builders, judges, host personnel, and spectators shall not be exposed to risk
of personal injury. Only builders and judges may be in the construction site.
10.3.2 At all times during timed construction every builder shall wear personal
protective equipment in the proper manner.
10.3.3 A pouch or other article of clothing shall not be removed from a builder’s
person or held in a builder’s hand(s).
10.3.4 Loose nuts, loose bolts, or tools shall not be held in the mouths of builders.
10.3.5 Throwing anything is prohibited.
10.3.6 A builder shall not cross from the ground on one side of the river to the
ground on the other side.
10.3.7 A builder who is outside a staging yard shall not simultaneously support or
touch, directly or with tools, more than one member that is not in a constructed portion.
10.3.8 A builder shall not use the bridge, a constructed portion of the bridge, a
member, or a tool to support all or part of the builder's body weight. However, a builder
may be partially supported by a constructed portion if the builder is kneeling on the floor
on both knees, kneeling on the floor on one knee with the other foot on the floor, or
standing with the heels and toes of one or both feet on the floor.
10.3.9 A builder shall not depend on another builder or builders for support or
balance.
10.3.13 No part of a constructed portion shall extend beyond the site boundary at
any time.
10.3.14 A team shall construct its bridge safely using the site and floor surfaces
provided by the host school. Bridges and participants shall accommodate local
conditions.
10.4 ACCIDENTS
Accident types are described in Sub-Sections 10.4.1, 10.4.2, and 10.4.3. In general, the
clock is not stopped when there is an accident.
A penalty is assessed for each separate accident. If an accident is continuous (for
example, a builder stands in the river, or a dropped item is not retrieved promptly) it will be
counted as multiple occurrences until corrected. Builders involved in accidents may
continue to build. Items involved in accidents shall be recovered promptly and may be
used.
Construction cannot depend on deliberately committing an accident. Therefore, the clock
will be stopped if any work is accomplished by committing an accident. Before timed
construction is resumed, builders, tools, members, nuts, and bolts will be returned to the
positions they occupied immediately before the accident.
10.4.1 A builder, builder’s footwear, pouch, or article of clothing touches the river or
the floor outside the site boundary. Penalty is 2 minutes for every occurrence.
Exception: There is no penalty for stepping out of bounds or entering the river to retrieve
an object that has been dropped, such as a member, tool, nut, bolt, or personal protective
equipment.
2023 Rules | 34
10.4.2), the clock will be restarted, construction will resume, and a 200-pound weight
penalty will be assessed, even if the bearing surfaces of the bridge are within the footings
when it is completed. All penalties applied associated with this rule prior to the exception
being taken remain.
10.4.3 Outside the staging yards, a member that is not part of a constructed portion
touches or is in contact with another member that is not part of a constructed portion.
Penalty is 1/4 minute (15 seconds) for each occurrence. Exception: There is no penalty
if a member that is on the ground within a footing touches another member.
10.6 START
10.6.1 Before construction begins, only the following are allowed in the staging
yards: all builders, members, loose nuts, loose bolts, and tools. Every member, loose nut,
loose bolt, and tool must be in contact with the ground and must fit entirely within the
assigned area of a staging yard as designated on the Staging Yard detail on the Site Plan
Diagram. Loose nuts may be installed on loose bolts. Tools cannot touch each other.
Builders are wearing personal protective equipment as well as optional clothing such as
pouches. At the start, builders must be in their designated areas within the staging yards
and cannot touch members, tools, nuts, or bolts, which may only be picked up and
passed from one builder to another after timed construction begins. There shall be
nothing within the construction site that is not in a staging yard.
10.6.2 Judges inspect members, loose nuts, loose bolts, and tools as they are
placed in the staging yards. Tools that do not conform to regulation 10.2.3 and 10.2.4
shall be removed from the staging yard and shall not be used. After inspection and
throughout timed construction, additional members, tools, nuts, bolts, or other items shall
not be brought into the construction site nor shall anything be removed. Additional
builders shall not enter the construction site after the beginning of timed construction.
10.6.3 Timing and construction begin when the captain signifies that the team is
ready and the judge declares the start.
10.7 TIME
10.7.1 Time is kept from start to finish of construction. The clock will be stopped
under the following conditions:
2023 Rules | 35
(1) if a builder or judge sees a condition that could cause injury, or
(2) when a safety regulation has been violated (see Sub-Section 10.3), or
(3) when work has been accomplished by committing an accident. The clock is not
stopped if the accident does not contribute to the construction process (see
Sub-Section 10.4), or
(4) if a builder or judge is injured or incapacitated.
10.7.2 Construction ceases while the clock is stopped. After the situation has been
corrected, builders, tools, and bridge components are returned to the positions they
occupied immediately before the interruption, the clock is restarted, and construction
resumes.
10.8.2 If construction time exceeds 45 minutes, judges will halt construction. If local
conditions allow and the head judge approves, the team may move its bridge off site for
continued, untimed construction if it can be done safely. The bridge will not be eligible for
awards in any category, except for aesthetics and video, but it may be load tested at the
discretion of the head judge if that can be done safely within available time.
10.9 FINISH
10.9.1 Construction is complete when
(1) the bridge has been completed by connecting all the members that were in the
staging yard at the start of timed construction,
(2) all builders are in the staging yards,
(3) all tools are in contact with the ground in the staging yards or in a builder’s
possession, and
(4) all extra nuts and bolts are held in the hands of builders, or are in clothing worn
by builders, or are on the ground in the staging yards.
10.9.2 The clock is stopped when the captain informs the judge that construction is
complete. If the requirements of Sub-Section 10.9.1 are not met when the clock is
stopped, builders, tools, members, nuts, and bolts will be returned to the positions they
occupied immediately before the clock was stopped. The clock will then be restarted and
builders will be required to complete construction as designated in Sub-Section 10.9.1
prior to the clock being stopped when the captain again informs the judge that
construction is complete.
2023 Rules | 37
Section 11
LOAD TEST INSTRUCTIONS
11.1 DAMAGE
A bridge with damage that would reduce its strength or stability (such as a fractured weld,
missing or broken member, broken bolt, or missing nut) will not be approved for load
testing and will not be eligible for awards, except for aesthetics and video. Repair and
modifications are not permitted after timed construction except as prescribed in
Sub-Section 9.4.
11.2.1.2 Competitors who are not participating in loading, faculty, advisers, and
other spectators shall observe from a safe area designated by the judges and host school.
11.2.2.2 A bridge that sways in excess of 1 inch during lateral load testing shall not
be loaded vertically and will not be eligible for awards, except for aesthetics and video.
2023 Rules | 38
11.2.3 Vertical Load Test Precautions
Bridges may collapse suddenly without warning, and a failure may involve only one side so
that the load falls or slides sideways off the bridge. The intent of the provisions of this
Sub-Section (11.2.3) is to prevent personal injury if a bridge collapses.
11.2.3.1 The number of people near the bridge shall be minimized during vertical
load tests. The loading crew is limited to four students, but substitutions may be made
during the loading process.
11.2.3.2 Safety supports shall be provided by the host school, and shall be of
adequate strength, height, and number to arrest falling load if a bridge collapses. The use
of the AISC provided jack stands is highly recommended. The height of the jack stands
may be increased by placing wood blocks or concrete blocks underneath them provided
the jack stand remains stable.
11.2.3.3 Safety supports shall be in place under the decking units before load is
placed on the bridge.
11.2.3.4 The number and location of safety supports under a decking unit shall be
sufficient to arrest the load even if only one side or one end of the bridge collapses.
Therefore, safety supports are needed under the sides and ends of the decking units, not
just in the middle. Safety supports should be directly under decking units rather than
under bridge trusses or cross braces, if possible.
11.2.3.5 Safety supports shall be adjusted individually for each bridge so that load
cannot drop more than approximately four inches. If the height of the safety supports is
not adjustable in appropriate increments, they shall be augmented with pieces of wood,
concrete blocks or other suitable material provided by the host school.
11.2.3.6 No one shall reach, crawl, or step under a bridge, or stand inside a bridge
while any portion of the vertical load is in place. If safety supports must be adjusted
during loading, the load shall first be removed without disturbing the bridge, adjustments
made, and the load replaced as it was before being removed.
11.2.3.7 Bridges that inhibit safely placing vertical load shall not be tested and will
not be eligible for awards, except for aesthetics and video.
11.2.3.8 Judges shall continuously observe sway carefully during vertical load
testing. If sway exceeds 1 inch, loading shall cease and load shall be removed carefully.
2023 Rules | 39
11.2.3.10 Judges shall continuously observe the behavior of the bridge. Loading
shall cease and the load shall be removed carefully if, in the opinion of a judge, collapse is
imminent.
11.3 PREPARATION
The captain shall observe the load tests and may handle load. A captain who does not
handle load shall comply with Sub-Section 11.2.1.3, but does not count toward the
four-person limit.
Teams shall accept imperfect field conditions such as bent decking, sloping floors, and
unfavorable floor surfaces. Commencing the lateral load or vertical load test indicates
acceptance of all starting conditions.
For each bridge, the judge will determine by a randomizing process (e.g., coin flip) which
end is the east end. The other end is the west end. The north side and south side of the
bridge are relative to the designation of the bridge ends.
Position S designates the position of the decking unit for the lateral load test and position
L1 and L2 designate the position of the decking units for the vertical load test. These
positions are determined at the beginning of the competition as described in Sub-Section
7.1(8) and illustrated by the Lateral Load Test Plan and Vertical Load Test Plan on the Load
Test Plan Diagrams.
At their discretion, judges may impose a penalty for a bridge that incorporates parts
having the primary function of interfering with placement of decking, load, or measuring
devices. If the bridge cannot be loaded safely, or sway or deflection cannot be measured
in accordance with the provisions of this Section (11), the bridge shall not be load tested
and will not be eligible for awards, except for aesthetics and video.
Typically, sway is determined by using a plumb bob attached to the bridge or decking at a
specific point, but sway limits apply even if the plumb bob is displaced by contact with
another part of the bridge.
11.4.1 Set Up
The lateral load test is conducted with one decking unit positioned at a distance of S from
the end of the stringer at the west end of the bridge as indicated on the Lateral Load Test
Plan Diagram. Approximately 75 pounds of weight is placed on that decking above the
stringer on the opposite side of the bridge from where the lateral load will be applied. This
2023 Rules | 40
load is intended to restrain the bearing surfaces of the bridge from lifting off the floor when
lateral load is applied. No additional uplift restraint will be used, even if bearing surfaces
lift.
Bearing surfaces are prevented from sliding by lateral restraint applied by the loading crew.
This lateral restraint shall not restrain rotation or uplift. The restraint is applied as close to
the floor as possible, at the locations shown on the Lateral Load Test Plan Diagram.
Teams may provide and use optional devices to prevent sliding. However, the device must
prevent sliding only. Devices designed to prevent vertical uplift will not be permitted. The
lateral load test is failed if the bridge is restrained in other than the lateral direction, or if the
restraint is not applied close to the ground, or if the restraint is not effective.
11.5.1 Set Up
11.5.1.1 Decking units are 3’-0” long in the longitudinal (span) direction of the
bridge so that the main bars of grating span laterally. Two decking units are used.
Decking units are placed square with and centered on the stringers. Decking units shall
not be attached to the bridge and shall not distort it (see Sub-Sections 9.2.3 and 9.2.4).
One decking unit is placed at a distance L1 from the west end of the bridge measured
along the top of the north side stringer. The other decking unit is placed at a distance L2
from the west end of the bridge measured along the top of the north side stringer.
A decking unit that does not contact the top of a stringer at a location where deflection will
be measured will be clamped to the stringer at or near that location. The clamp will be
2023 Rules | 41
removed when sufficient load is in place to hold the decking unit in contact with the top of
the stringer.
11.5.1.2 Safety supports are placed under the decking units so that no portion of
the load will drop more than approximately 4 inches if the bridge collapses.
2023 Rules | 42
11.5.3 Vertical Load Test
(1) The crew distributes 100 pounds of preload on the decking unit positioned at L1
and 100 pounds of preload on the decking unit positioned at L2. The preload is
distributed uniformly, centered laterally on the decking unit, and positioned
identically for each bridge.
(2) Initialize the sway measurement devices.
(3) Initialize the two deflection measuring devices at D1 and D2 or record the initial
readings.
(4) The crew places 1300 pounds of additional load on the decking unit at L1.
(5) The crew places 1000 pounds of additional load on the decking unit at L2.
(6) Record the final readings for D1 and D2.
11.6 UNLOADING
Load on the decking unit at L2 is removed before the load on the decking unit at L1. If the
bridge collapses during unloading (situation c, d, or e in Sub-Section 11.5.2), the bridge is
not eligible for awards, except for aesthetics and video.
2023 Rules | 43
Section 12
EQUIPMENT PROVIDED BY HOST
12.2 DECKING
Preferred decking is steel bar grating identified as W-19-4 (1” x 1/8”). The dimensions of a
unit of grating are approximately 3'-6” x 3'-0” x 1” and the weight is approximately fifty
pounds. Grating has significant bending strength only in the direction of the main bars,
which are 3'-6” long. The grating will be installed with the main bars perpendicular to the
length of the bridge, creating a roadway that is 3'-6” wide. Therefore, support for the
grating is needed for the edges that are parallel to the length of the bridge but not for the
edges that are perpendicular to the length.
2023 Rules | 44
12.4 LOAD
A total load of 2500 pounds should be supplied in pieces of uniform size and weight that
can be handled safely. When in place, the load should not provide significant stiffness in
the longitudinal direction of the bridge. The recommended load consists of 25-pound
lengths of 4” x 4” x 3/8” or 5” x 5” x 5/16” steel angle placed perpendicular to the length of
the bridge. Alternatively, sacks of material, containers of liquid, concrete blocks, or
jacking systems can be used. Decking is not included as part of the 2500-pound load. If
a jacking system is used, loading forces may be concentrated nine inches in from each
end of the decking units.
12.5 TEMPLATE
A template as dimensioned in the Stringer Template detail on the Bridge Elevation diagram
shall be used to check the stringer locations and clearance. Plywood is recommended.
Holes for handholds are helpful but optional.
12.6 BOX
A box with inner dimensions of 3'-6” x 6” x 4” should be supplied to ensure that members
and tools meet dimensional requirements specified in Sub-Sections 8.2.2.2 and 10.2.4.
Wood or other non-deforming material is recommended.
12.7 SCALES
Four calibrated scales should be supplied to be used under the four bridge supports to
determine the measured weight of the bridge. The scales should be checked prior to
competition for measurement accuracy. If it is impractical to weigh the whole bridge at
once, then each individual piece of the bridge can be weighed separately on a single scale
and summed to determine the measured weight of the bridge.
2023 Rules | 45
Section 13
INTERPRETATION OF RULES
The website aisc.org/ssbc lists clarifications of the rules. Students, judges, and host
personnel may submit questions via a form on that website, but should first read the
previously posted clarifications, reread this rules document carefully in its entirety,
and review the Host and Competitors Guides at aisc.org/ssbc. Submitters’ names
and affiliations must accompany clarification requests and will be posted with the
questions and answers. Questions shall be limited to interpretation of rules; specific
designs and procedures will not be validated. Deliberation by the SSBC Rules
Committee typically requires two weeks, but possibly longer. Questions must be
submitted before 5:00 p.m. EDT on May 1, 2023.
2023 Rules | 46
Section 14
JUDGING
The host school will recruit judges. Judges are empowered to halt any activity that they
deem to be hazardous. The head judge has full authority over the conduct of the
competition and interpretation of the rules. Decisions, scoring, and ranking are the sole
responsibility of the judges and will be final. The host school will assure that the judges
are fully informed of the rules and procedures, and fully equipped for their tasks. More
information for the host school and judges is available at aisc.org/ssbc, where the official
scoring spreadsheet may be downloaded and the Host Guide reviewed.
2023 Rules | 47
Section 15
APPEALS
15.1.3 Upon receiving the decision from the RHJ, the captain shall be given 5
minutes to consult with the rest of the team in regards to whether the team consents to the
decision of the RHJ. Only the captain will discuss the decision of the team with the RHJ
15.1.3.1 If the captain consents to the decision of the RHJ, the decision is final
and the team will continue on with the competition.
15.1.3.2 If the captain does not consent to the decision of the RHJ, they shall
inform the RHJ that they plan to appeal to the SSBC Rules committee and write a brief
explanation of what is being appealed on the data form before signing it. The team will
complete the rest of the competition, provided that the bridge is deemed safe by the RHJ,
with the scoring based on the decision made by the RHJ. Participants are reminded that
civility and ethical behavior are expected during the competition, particularly concerning
appeals.
15.1.4 After the Regional Competition, the SSBC Rules Committee will consider
only those appeals that allege errors in interpretation of rules and only if those appeals
were made to the RHJ during the Regional Competition in conformance with Sub-Section
15.1.2 and 15.1.3.2. Appeals should be submitted by e-mail to Ms. Dita Frank
[email protected] and shall include
(1) name of the college or university making the appeal,
(2) captain’s name, e-mail address, and telephone number,
(3) faculty advisor's name, e-mail address, and telephone number,
(4) brief description of the problem, including citation of pertinent rules,
2023 Rules | 48
(5) action taken at the competition to deal with the problem,
(6) action that the appealing team feels should have been taken, and
(7) data showing that the team should have qualified for the National Finals.
The SSBC Rules Committee may review the submitted data forms documenting the
problem and may confer with the RHJ.
15.1.5 Appeals must be made by e-mail. An appeal will be considered only if the
email is received by 5:00 p.m. EDT on the Wednesday immediately after the Regional
Competition. Ms. Frank will forward the appeal to the SSBC Rules Committee for their
evaluation. The SSBC Rules Committee will not respond to an appeal until the official
scoring spreadsheet file for that Regional Competition has been submitted by the host
school to [email protected]. The only redress that may be made is an invitation
to participate in the National Finals if the SSBC Rules Committee is convinced that the
appeal is valid and that the appealing team should have qualified for the National Finals.
Decisions and rankings made by regional judges will not be overturned.
15.2.3 After hearing the SHJ’s ruling, the captain may request a five-minute recess
to discuss the issue with the team. During the recess, the conditions at issue will not be
changed. Immediately after that recess, if the team has justification to contest the SHJ’s
ruling, the captain has the option to appeal that decision to the national head judge (NHJ).
The NHJ will hear the appeal as soon as possible and will make a ruling. The NHJ may
consult with the SSBC Rules Committee. The conditions at issue will not be changed
during deliberation.
15.2.4 If the team has justification to contest the NHJ’s ruling, the captain has the
option to appeal that decision directly to the SSBC Rules Committee within fifteen minutes
after hearing the NHJ’s ruling. The Committee may request information from the NHJ and
SHJ but those judges will not vote on the final ruling.
2023 Rules | 49
15.2.5 The decision of the SSBC Rules Committee is final; there are no further
appeals. However, AISC welcomes written suggestions for improving future competitions.
2023 Rules | 50
2023 Rules | 51
2023 Rules | 52
2023 Rules | 53
2023 Rules | 54