Pump Detail
Pump Detail
BLADDER TANK
CONCRETE PAD
(CUSTOMER CONCERN) 100 100 100 100 CONCRETE PAD (CUSTOMER CONCERN)
RISER PIPE
SS304 PIPE RISER PIPE
SS304 PIPE
300mm minumum clearance from floor of the cistern 300mm minumum clearance from floor of the cistern
P U M P D E T A I L
NOT DRAWN TO SCALE
PREPARED BY THE OFFICE OF: PROJECT TITLE & LOCATION: Surveyed: Recommended: Approved: Sheet Content: Sheet No.:
Drawn:
R.A CONSTRUCTION PROPOSED TEMPORARY FACILITY FOR
ENGINEER'S FIELD OFFICE FLOOR PLAN
FRONT AND REAR ELEVATIONS O 08
DEVELOPMENT CORP. PHINMA CENTER BACOLOD PHASE 1 Designed & Prepared by:
ADDRESS: RIZAL ST. ISABELA, NEGROS OCCIDENTAL LOCATION: BACOLOD CITY, NEGROS OCCIDENTAL