Checklist Steel

This checklist is used to inspect steel reinforcement and formwork installation for the King Salman Road Side Walks & Branch of Wadi Alysan project. It contains 14 items to check, including verifying approved shop drawings and method statements are being followed, reinforcement is accurately placed and secured with the proper concrete cover, formworks are accurately positioned and fixed, and safety measures are implemented. The inspection verifies reinforcement and formwork are installed correctly according to drawings and specifications before concrete placement. Upon completion, the contractor and supervision consultant must sign off to accept the work.

Uploaded by

imtiyaz khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
126 views1 page

Checklist Steel

This checklist is used to inspect steel reinforcement and formwork installation for the King Salman Road Side Walks & Branch of Wadi Alysan project. It contains 14 items to check, including verifying approved shop drawings and method statements are being followed, reinforcement is accurately placed and secured with the proper concrete cover, formworks are accurately positioned and fixed, and safety measures are implemented. The inspection verifies reinforcement and formwork are installed correctly according to drawings and specifications before concrete placement. Upon completion, the contractor and supervision consultant must sign off to accept the work.

Uploaded by

imtiyaz khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CHECK LIST

Project Name CLIENT

PMO PMC

Contractor

GRP-02-MR004-RCRC-CIV-CL-
Checklist Title: Steel Reinforcement and Formwork Checklist No.
RW-0016

King Salman Road Side Walks & Branch of GRP-02-MR004-RCRC-CIV-ITP-


Works Location: Related ITP #
Wadi Alysan RW-0016

GRP-02-MR004-RW-CIV-MST-
GR-RW-KSR-LA-RKSR-HD-7000-03 Related MS #
Related Drawing(s) 0016 REV-00

Status - Acceptable
SN Description of checking to be carried out Remarks
Yes No NA
1 Check for the Approval of Method Statement.
2 Approved shop drawings are being used.
Steel reinforcement shall be checked against drawings for bending
3 details. It shall be ensured that all steel reinforcement accurately
in place and firmly secured against possible displacement.

Accurately position, support and secure reinforcement against


displacement. Locate and support reinforcement with bar supports
4 to maintain minimum concrete cover. Do not tack weld crossing
reinforcing bars.
Set wire ties with ends directed into concrete, not toward exposed
5 concrete surfaces.
All reinforcement shall be pressure washed with fresh water after
6 erection and immediately before placing concrete.
General: Comply with CRSI's "Manual Standard Practice" for
7 placing reinforcement
Construct formwork so concrete members and structures are of
8 size, shape, alignment, elevation and position indicated within
tolerance limits of ACI 117
9 Formworks are accurately placed in position and firmly fixed.
MEP embedded items i.e. size, type, location are as per approved
10 shop drawings.
Ensure number & spacing of struts and braces of forms are rigid &
11 uniform.
Lock joints between sections of forms shall be free from
12 movement.
Forms to ensure shape, strength, rigidity, water tightness and
13 surface smoothness for reused purposes and maintain in good
condition.
Safety measures are being implemented during the Installation of
14 Formworks.

Remarks:

For Contractor For Supervision Consultant (PMC)


Name
Designation
Date

Form Ref: TMT114, Rev-1, Date: 09-Feb-17