Measurement Sheet Name of Work:-Survey of Demolition of F9 Building (G+1)

1. The document is a measurement sheet for the demolition of a building that is 9 stories tall. 2. It lists various demolition tasks like dismantling brickwork, concrete, pipes, doors and provides the quantities and units for each task. 3. The total cost of the demolition is calculated based on the measurement of tasks and applicable rates, including costs for labor, materials, taxes, and contingencies.

Uploaded by

Shubham K
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
173 views

Measurement Sheet Name of Work:-Survey of Demolition of F9 Building (G+1)

1. The document is a measurement sheet for the demolition of a building that is 9 stories tall. 2. It lists various demolition tasks like dismantling brickwork, concrete, pipes, doors and provides the quantities and units for each task. 3. The total cost of the demolition is calculated based on the measurement of tasks and applicable rates, including costs for labor, materials, taxes, and contingencies.

Uploaded by

Shubham K
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 53

MEASUREMENT SHEET

NAME OF WORK:- SURVEY OF DEMOLITION OF


SR NO. DESCRIPTION NO LENGTH (m)
Demolishing brick work manually/ by mechanical means including stacking of
1 material within 50 metres lead as per direction of Engineer-in-charge.

Taking centre line of Bldg 1 177.73

Demolishing cement concrete manually/ by mechanical means includingdispos


2
direction of Engineer -in-charge.
brickwork (considering centre line of bldg ) 1 177.73

Demolishing R.C.C. work manually/ by mechanical means including stacking o


3
within 50 metres lead asper direction of Engineer - in- charge.

RCC slab (G+1) (considering 150mm slab thk)


Ground floor 1 186.73
First floor 1 186.73
TOTAL

RCC beam
Beam no. 1 2 3.19
Beam no. 2 1 2.01
Beam no. 3 4 2.7
Beam no. 4 3 4.38
Beam no. 5 1 2.2
Beam no. 6 2 1.7
Beam no. 7 2 2.58
Beam no. 8 2 3.34
TOTAL
GRAND TOTAL (For 2 floors) 2

RCC Column
Column nos.
Column type 1 (Below ground) 30 0.45
Column type 2 (Ground Floor) 30 0.3
Column type 3 (1st floor) 30 0.3

RCC staircase

volume of waist slab 1 2.7


volume of one step (T=250mm, R=150mm) 9
(No of flights) 4
TOTAL

RCC chajja 32 1

RCC Footing
FOOTING 30
Total RCC

Dismantling G.I. pipes (external work) including excavation and refilling trenc
4 mechanical means including stacking of pipes within 50 metres lead as per dir
nominal bore)

Outer Dia of pipe= 25mm,Inner Dia of pipe=22mm 1 120

Total Length=21m, weight per m=1.98 kg/m


(1.98*120=237.6 kg)

Dismantling of flushing cistern of all types (C.I./PVC/Vitrious China) including


5
disposal of unserviceable materials within 50 metres lead.
8

6 Dismantling of C.I. sluice valve including stacking of useful materials within a


4
weight per sluice valve =0.55 kg (0.55*4)

Dismantling doors, windows and clerestory windows (steel or wood) shutter in


7 complete and stacking within 50 metres lead (Of area 3 sq. metres and below)
MS Steel door (considering each door of 20 kg)
(6*20=120 kg) (Size
0.96m*2.2m)
D1(2*2.2) 2 2
D2(0.9*2.2) 12 0.9
TOTAL NO OF DOOR 14

Windows (Considering 5 Kg per window) 32

Disposal of building rubbish / malba / similar unserviceable, dismantled or wa


loading, transportingun loading to approved municipal dumping ground or as a
8
lead, for all leads including all lifts involved.

Considering all in average of 315 cu.m of malba


MENT SHEET
EMOLITION OF F9 BUILDING (G+1)
BREADTH (m) HEIGTH (m) QTY TOTAL QTY UNIT
uding stacking of serviceable material and disposal of unserviceable
-charge.

0.23 7.5 306.58 307.00 cu.m

s includingdisposal of material within 50 metres lead as per

0.23 7.5 306.58425 307.00 nos

uding stacking of steel bars and disposal of unserviceable material


.

1 0.15 28.0095 cu.m


1 0.15 28.0095 cu.m
56.019 56.019 cu.m

0.23 0.3 0.44022


0.23 0.3 0.13869
0.23 0.3 0.7452
0.23 0.3 0.90666
0.23 0.3 0.1518
0.23 0.3 0.2346
0.23 0.3 0.35604
0.23 0.3 0.46092
3.43413 cu.m
6.86826 13.73652 cu.m
0.45 1.2 7.29
0.45 3 12.15
0.45 3 12.15
31.59 32 cu.m

1.35 0.15 0.54675 cu.m


2.27 cu.m
2.81675
11.267 11.3 cu.m

0.15 0.12 0.576 0.58 cu.m

0.488 14.64 cu.m


128.27552 cu.m

nd refilling trenches after taking out the pipes, manually by


es lead as per direction of Engineer-in-charge(Above15 mm to 40 mm

120 120 R.meter

237.6 kg

China) including stacking of useful materials near the site and

8 8 nos

aterials within a lead of 50 metres


4 4 nos
2.2 kg

wood) shutter including chowkhats, architrave, holdfasts etc.


etres and below)
m.sq
2.2 8.8
m.sq
2.2 23.76
m.sq
32.56 33

280 kg

160 Kg

dismantled or waste materials by mechanical means, including


ng ground or as approved by Engineer-in-charge, upto 20 km initial

315 cu.m
ANNEXUR
ABSTRACT S
NAME OF WORK :- SURVEY OF DEM

Sr.No. Description

Demolishing brick work manually/ by mechanical means including


stacking of serviceable material and disposal of unserviceable
1
material within 50 metres lead as per direction of Engineer-in-
charge.

Demolishing cement concrete manually/ by mechanical means


includingdisposal of material within 50 metres lead as per
2
direction of Engineer - in -chargeNominal concrete 1:4:8 or leaner
mix (i/c equivalent design mix)

Demolishing R.C.C. work manually/ by mechanical means


including stacking of steel bars and disposal of unserviceable
3
material within 50 metres lead asper direction of Engineer - in-
charge.

Dismantling G.I. pipes (external work) including excavation and


refilling trenches after taking out the pipes, manually by
4
mechanical means including stacking of pipes within 50 metres
lead as per direction of Engineer-in-charge

Dismantling of flushing cistern of all types (C.I./PVC/Vitrious


5 China) including stacking of useful materials near the site and
disposal of unserviceable materials within 50 metres lead.

Dismantling of C.I sluice valve including stacking of useful


6
materials within a lead of 50 metres
Dismantling doors, windows and clerestory windows (steel or
wood) shutter including chowkhats, architrave, holdfasts etc.
7
complete and stacking within 50 metres lead (Of area 3 sq.
metres and below)

Disposal of building rubbish / malba / similar unserviceable,


dismantled or waste materials by mechanical means, including
loading, transportingun loading to approved municipal dumping
8
ground or as approved by Engineer-in-charge, upto 20 km initial
lead, for all leads including all lifts involved.

TOTAL COST
Cost of works as per DSR-2016

Less correction factor @10.20%

Total

Add post GST cost index @ 66.55 per cent

Sub-Total II (Z)

Cost excluding GST (Z/1.18)

Market rate items without GST


Sub-Total III (Z/1.18 + MR)

Labour cess @ 1 per cent


TOTAL(A)

Add ESI EPF @ 3% on TOTAL(A)


TOTAL(B)

Add 3% contingencies on TOTAL(B)


TOTAL COST
ADD 18 per cent for GST on TOTAL(A)
TOTAL COST including GST
ANNEXURE (A)
ABSTRACT SHEET
SURVEY OF DEMOLITION OF O9 BUILDING

Quantity Unit Rate Amount

306.58 cu.m 842.75 258370.29

306.58 nos 615.15 188592.69

128.27 cu.m 1454.55 186575.13

120 R.meter 63.65 7638.00

8 Nos. 391.20 3129.60

4 Nos. 141.15 564.60


46 Nos 61.25 2817.50

315 cu.m 120.55 37973.25

685661.06

₹ 685,661.06

₹ -69,937.43

₹ 615,723.63

₹ 409,764.08

₹ 1,025,487.71

₹ 869,057.38

₹ -
₹ 869,057.38
Reference to DSR-2016

15.7.4(Pg No 906) DSR vol 2

15.2.29(pg no 903) DSR vol 2

15.3(Pg No 904)DSR vol 2

15.44.1(Pg No.926)DSR vol 2

15.52(Pg No.933)DSR vol 2

15.53.1(Pg No.933)DSR vol 2


15.12.1 (Pg No.910)DSR vol 2

15.60 (Pg No.938)DSR vol 2

₹ 869,057.38

₹ 8,690.57
₹ 877,747.95

₹ 26,332.44
₹ 904,080.39

₹ 27,122.41
₹ 931,202.81
157,994.63
₹ 1,089,197.44
ANNEXURE (B)
CREDIT SHEET FOR MATERIALS

Sr.No. Description

1 Credit for bricks received from demolishing of brickwork

Credit for steel reinforcement received from demolishing of


2
R.C.C

Credit for dismantled M.S/ G.I/C.I. scrap received from


3
demolishing of building

Total credit
XURE (B)
T FOR MATERIALS

Quantity Unit Rate Amount Reference

83750 Nos 1.5 125625 AOR

5880 kg 20 117600 AOR

680 kg 20 13600 AOR

256825
ANALYSIS OF RATE
Credit for dismantled steel reinforecement received from

Details of cost for 11507 kg

Description
Dismantled Reinforced steel Ref:-
Scrap value rate received from M/S
Building material and all scrap. Ph
no.9967455763 Add:-
Sakinaka Mumbai. 400072

Total

Add GST 18% onTotal

Total after adding GST

ANALYSIS OF RATE
Credit for dismantled bricks received from demoli

Details of cost for 83750 Nos bricks.

Description

Dismantled bricks

Total
Add GST 18% onTotal

Total after adding GST

ANALYSIS OF RATE
Credit for dismantled M.S/G.I/C.I and misc. scrap received from d

Details of cost for 680 kg

Description
Dismantled M.S/G.I/C.I and misc .scrap
Ref:- Scrap value rate
received from M/S Building material
and all scrap. Ph no.9967455763
Add:- Sakinaka Mumbai. 400072

Total

Add GST 18% onTotal

Total after adding GST


ANALYSIS OF RATE
antled steel reinforecement received from demolishing of RCC

Details of cost for 11507 kg

Qty unit Rate Amount

11507 kg 20 230140

230140

41425.2

271565.2

ANALYSIS OF RATE
or dismantled bricks received from demolishing of RCC

Details of cost for 83750 Nos bricks.

Qty unit Rate Amount

83750 nos 1.5 125625

125625
22612.5

148237.5

ANALYSIS OF RATE
S/G.I/C.I and misc. scrap received from demolishing of RCC

Details of cost for 680 kg

Qty unit Rate Amount

680 kg 20 13600

13600

2448

16048
ACTUAL COST OF DEMOLISHING OF BUILDING

COST REQUIRED FOR DEMOLISHING OF BUILDING

INCLUDING GST

TOTAL COST

LESS TOTAL CREDIT VALUE INCLUDING GST

ACTUAL COST
NG OF BUILDING

₹ 869,057.38

₹ 169,685.13

₹ 1,038,742.51

₹ 256,825.00

₹ 781,917.51
MEASUREMENT
Name of work:- Reconstru
SR NO. Earth work in excavation by
DESCRIPTION
mechanical means (Hydraulic excavator)/manual
sqm on plan)including getting out and disposal of excavated earth lead upto 5
1

Excavation of footing (assuming size 1.2m*1.2m*2.5m)

Providing and laying in position ready mixed plain cement concrete, using flya
automatic batching plant and transported to site of work in transit mixerfor al
2
specified grade for plain cement concrete work, including pumping of R.M.C. f
shuttering and finishing, including cost of curing, admixtures in recommended

Considering 75mm thick P.C.C

Providing and laying in position ready mixed plain cement concrete, using fly a
fully automatic batching plant and transported to site of work in transit mixer
3
design of specified grade for plain cement concrete work, including pumping o
centering, shuttering and finishing, including cost of curing, admixtures in rec

Ground floor
First floor
Total

4 Brick work with common burnt clay modular bricks of class designation 7.5 in

considering centre line of building =177.73 r. metre


Less deduction for beam, jambs , soffit,columns, openings
Total Brick Work

Reinforced cement concrete work in beams, suspended floors, roofs having slo
5 window sills,staircases and spiral stair cases above plinth level up to floor five
reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded s
RCC slab (G+2)
Ground floor
First floor
TOTAL

RCC beam
Beam no. 1
Beam no. 2
Beam no. 3
Beam no. 4
Beam no. 5
Beam no. 6
Beam no. 7
Beam no. 8
TOTAL
GRAND TOTAL (For 2 floors)

RCC staircase

volume of waist slab


volume of one step (T=250mm, R=150mm)
(No of flights)
TOTAL

RCC chajja
Total RCC

Reinforced cement concrete work in walls (any thickness), including attached


6 piers,abutments, posts and struts etc. above plinth level up to floor five level,
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 m

RCC Column
Column nos.
Column type 1 (Below ground)
Column type 2 (Ground Floor)
Column type 3 (1st floor)

Providing and laying in position specified grade of reinforced cement concrete


7
work up to plinth level :

RCC Footing
FOOTING

8 Centering and shuttering including strutting, propping etc. and removal of for

Columns, piers, abutments, pillars, posts and struts

Lintels, beams, plinth beams, girders, bressumers and cantilevers,slabs


Weather shade, Chajjas, corbels etc., including edges

Stairs, (excluding landings) except spiral-staircases

footing size 1.2*1.2*1.2


Contact area =2(1.2+1.2)*1=4.8 sq.m for 1 footing
Steel reinforcement for R.C.C. work including straightening, cutting, bending,p
9
assuming (80kg steel/cu.m)
Volume of R.C.C up to plinth level = 18 cu.m
Steelin Kg =(80*18 )

10 Steel reinforcement for R.C.C. work including straightening, cutting, bending,p


Volume of R.C.C above the plinth level = 110.275 cu.m
Steel in Kg=(80*110.275)

Providing and laying vitrified floor tiles in different sizes (thickness to be spec
11 conforming to IS: 15622, of approved make, in all colours and shades, laid on
cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement

Total Area tiling work.


(Slab area per floor 364.17 sq.m)
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having therm
12 brassthreaded fittings This includes jointing of pipes & fittings with one step C
directionof Engineer in Charge External work 75 mm nominal inner dia Pipes

13 Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, havingtherm


considering 100 R.metre L.S

14 Providing and fixing white vitreous china pedestal type (European type/ wash
considering 1 nos in each flat
Providing and fixing 8 mm dia C.P. / S.S. Jet with flexible tube upto 1 metre lo
15
approved by Engineer - in - charge.
considering 1 nos in each flat
Constructing brick masonry road gully chamber 45x45x77.5 cm with bricks in
16 complete as per standard design :With common burnt clay F.P.S. (non modula

17 Providing and fixing gun metal non- return valve of approved quality (screwed
considering 2 nos

18 Providing and fixing aluminium work for doors, windows, ventilators and part
Considering 1.6kg/m

19 Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded a

Stone work (machine cut edges Veneer work) for wall lining upto 10 m height
coarse sand and jointed with Cement mortar 1:2 (1 cement : 2 stone dust), inc
20
sides by means of cramps and pins which shall be paid for separately).Kota sto

18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:


21 plaster1:6 (1 cement : 6 fine sand).
Internal plastering

Hall 2*(3.01+4.38)*3
Bedroom 2*(3.01+4.38)*3
kitchen 2*(2.01+3.19)*3
Passage 2*(3.91*2.23)*3
Bath 2*(1.38*1.70)*2.4
W.c 2*(1.2*1.70)*2.4
Slab (2*186.73)
TOTAL

External plastering

TOTAL PLASTERING
Deduction for door and window
TOTAL PLASTERING AFTER DEDUCTION
22 White washing with lime to give an even shade :New work (three or more coa
Considering plastering area

23 Providing and fixing brass bib cock of approved quality :20 mm nominal bore
Taking L.S as 30 nos

24 Providing and fixing gun metal gate valve with C.I. wheel of approved quality
Taking L.S as 5 nos

Providing and laying damp-proof course 40mm thick with cement concrete 1:2
25
nominal size)

Considering centre line of plan

Tile work in skirting, risers of steps and dado up to 2 m height over 12 mm thi
26
cement slurry @ 3.3 kg/sqm, including pointing in white cement mixed with p
Skirting
Dado
Total

Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per IS:13
27
fittings and brackets, cutting and making good the walls wherever required : K
considerng 1 sink per flat

Providing and fixing white vitreous china wash basin including making all nco
28
630x450 mm
considering 1 basin per flat

Extra for providing opening of required size & shape for wash basin/ kitchen s
29
Granite/ stone work, including necessary holes for pillar taps etc. including m
Considering 1 nos

Providing and fixing rectangular high density polyethylene water storageloft t


30 asapproved by Engineer-in-charge. The rate includes making necessary holesf
fortank shall be paid separately
Considering 500 litres tank capacity (1 nos per flat)
In litres (8*500)
Providing wood work in frames of doors, windows, clerestory windows and o
31
dash fasteners of required dia & length ( hold fast lugs or dash
Door
D1
D2

Window
W1
W2
Total
MEASUREMENT SHEET
f work:- Reconstruction of F9 Building
NO LENGTH
excavator)/manual (m) BREADTH
meansover (m)
areas (exceedingHEIGTH (m)
30 cm in QTYm in width
depth, 1.5 TOTALas QTY
well as 10
ed earth lead upto 50 m and lift upto1.5 m, as directed by Engineer-in-charge.

30 1.2 1.2 2.5 108 108

concrete, using flyash and cement content as per approved design mix and manufactured in fully
n transit mixerfor all leads, having continuous agitated mixer, manufactured as per mixdesign of
pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering,
res in recommended proportions as per IS : 9103 (footing)M15

30 1.2 1.2 0.75 32.4 32.5

concrete, using fly ash and cement content as per approved design mix and manufactured in
work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix
including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of
g, admixtures in recommended proportions as per IS : 9103 (floors)M10.

1 186.73 1 0.1 18.673


1 186.73 1 0.1 18.673
37.346 37.35

s designation 7.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand).

1 177.73 0.23 7.5 306.58425


60
246.58425 246.58425

oors, roofs having slopeup to 15° landings, balconies, shelves, chajjas, lintels, bands, plain
level up to floor five level, excludingthe cost of centering, shuttering, finishing and
one-III) : 3 graded stone aggregate 20 mm nominal size).

1 186.73 1 0.15 28.0095


1 186.73 1 0.15 28.0095
56.019 56
2 3.19 0.23 0.3 0.44022
1 2.01 0.23 0.3 0.13869
4 2.7 0.23 0.3 0.7452
3 4.38 0.23 0.3 0.90666
1 2.2 0.23 0.3 0.1518
2 1.7 0.23 0.3 0.2346
2 2.58 0.23 0.3 0.35604
2 3.34 0.23 0.3 0.46092
3.43413
2 6.86826 13.73652

1 2.7 1.35 0.15 0.54675


9 2.27
4 2.81675
11.267 11.3

32 1 0.15 0.12 0.576 0.58


81.61652

, including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars,
p to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :5.2.2
tone aggregate 20 mm.

30 0.45 0.45 1.2 7.29


30 0.3 0.45 3 12.15
30 0.3 0.45 3 12.15
31.59 32

ced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All

30 0.488 14.64

. and removal of form for all heights :

151.37 151.4

237.89 238
4.6 4.6

6.95 6.95

30 144 144

g, cutting, bending,placing in position and binding all complete upto plinth level.

1 1440
1.44
g, cutting, bending,placing in position and binding all complete above plinth level.

1 8822
8.822

thickness to be specified by the manufacturer) with water absorption less than 0.08% and
and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey
with white cement and matching pigments etc., complete.(Size of Tile 1000x1000 mm)

3 186.73 1 560.19 560

) pipes, having thermal stability for hot & cold water supply including all CPVC plain &
ings with one step CPVCsolvent cement, trenching, refilling & testing of joints complete as per
nal inner dia Pipes

8 7.5 60 60

) pipes, havingthermal stability for hot & cold water supply, including all CPVC plain &
100 100

uropean type/ wash down type) water closet pan.


8 8 8
tube upto 1 metre long with S.S. triangular plate to Eureopean type W.C. of quality and make as
8 8 8
.5 cm with bricks in cement mortar 1:4 (1 cement : 4 coarse sand ) with precast R.C.C. vertical
y F.P.S. (non modular) bricks of class designation 7.5.
6 6 6

ved quality (screwed end) :


2 2 2

ventilators and partitions with extruded built up standard tubular sections/ appropriate Z
L.S 65
104

ished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window
L.S 11.5

ng upto 10 m height, backing filled with a grout of 12 mm thick cement mortar 1:3 (1 Cement : 3
t : 2 stone dust), including rubbing and polishing complete. (To be secured to the backing and the
separately).Kota stone slabs exposed face dressed and rubbed. 25 mm thick.

L.S 22

ck cement plaster 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement

8 354.72
8 354.72
8 249.6
8 294.72
8 118.24
8 111.36
373.46
1856.82

1 230 7.5 1725 1725

3581.82
250
3331.82
k (three or more coats).
1 3331.82 3331.9

0 mm nominal bore
30 30 30

of approved quality (screwed end) : 25 mm nominal bore


5 5 5

cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm

177.73 177.73 177.73

ight over 12 mm thick bed of cement mortar 1:3 (1 cement :3 coarse sand) and jointed with grey
ement mixed with pigment of matching shade complete. Marble tiles (8 mm thick).
8 59.49 0.1 47.592
8 10.26 1.2 98.496
146.088 146

en sink as per IS:13983 with C.I. brackets and stainless steel plug 40 mm, including painting of
wherever required : Kitchen sink with drain board (510x1040 mm bowl depth 250 mm).
8 8 8

ding making all nconnections but excluding the cost of fittings :Flat back wash basin of size

8 8 8

ash basin/ kitchen sink in kitchen platform, vanity counter and similar location in marble/
aps etc. including moulding, rubbing and polishing of cut edges etc. complete.
8 8 8

e water storageloft tank with cover, conforming to ISI : 12701, colour of opaque white or
ng necessary holesfor inlet, outlet & over flow pipes. The base support i/c fittings & fixtures

8 8 8
4000
tory windows and other frames, wrought framed and fixed in position with hold fast lugs or with
old fast lugs or dash fastener shall be paid for separately). Second class teak wood
2 2 0.03 2.2 0.264
12 0.9 0.03 2.2 0.7128
0.9768 0.98

24 1.5 0.03 1.5 1.62


24 0.7 0.03 0.6 0.3024
1.9224 1.92
as well as UNIT
10

cu.m

nufactured in fully
per mixdesign of
cost of centering,

cu.m

nufactured in
ed as per mix
uding the cost of

cu.m

oarse sand).

cu.m

nds, plain
nd

cu.m
cu.m
cu.m
cu.m
cu.m

cu.m
cu.m

cu.m

cu.m
cu.m

mns, pillars,
cement :5.2.2

cu.m

inforcement - All

cu.m

Sq.m

Sq.m
Sq.m

Sq.m

Sq.m

kg
Quintal
el.

kg
Quintal

0.08% and
ointing with grey
00 mm)

sq.m

lain &
omplete as per

R.meter

lain &
R.meter

nos
ity and make as
nos
R.C.C. vertical

nos

nos

ropriate Z
metre
kg

ounters, window
sq.m

:3 (1 Cement : 3
e backing and the

sq.m

thick cement

m.sq
m.sq

m.sq

m.sq

m.sq

m.sq

Nos.
Nos.

gregate 12.5mm

Sq.m

jointed with grey


k).
Sq.m
Sq.m
Sq.m

ding painting of
0 mm).
Nos

basin of size

Nos.

in marble/

Nos.

white or
gs & fixtures

Nos.
litres
fast lugs or with
od
cu.m
cu.m
cu.m

cu.m

cu.m
ABSTRA
NAME OF WORK : RECON

Sr.No.

6
7

10

11

12
13

14

15

16

17

18

19
20

21

22

23

24

25

26

27

28
29

30

31

Internal water supply & sanitary installations


External services connections
Internal electrical connections
Total Cost
Cost of works as per DSR-2016
Less correction factor @10.20%
Total
Add post GST cost index @ 66.55 per cent

Sub-Total II (Z)

Cost excluding GST (Z/1.18)

Market rate items without GST


Sub-Total III (Z/1.18 + MR)

Labour cess @ 1 per cent


TOTAL(A)

Add ESI EPF @ 3% on TOTAL(A)


TOTAL(B)

Add 3% contingencies on TOTAL(B)


TOTAL COST
ADD 18 per cent for GST on TOTAL(A)
TOTAL COST including GST
ABSTRACT SHEET
NAME OF WORK : RECONSTRUCTION O

Earth work in excavation by mechanical means (Hydraulic excavator)/manual


Description
meansover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on
plan)including getting out and disposal of excavated earth lead upto 50 m and lift
upto1.5 m, as directed by Engineer-in-charge.
All kinds of soil.

Providing and laying in position ready mixed plain cement concrete, using flyash and
cement content as per approved design mix and manufactured infully automatic
batching plant and transported to site of work in transit mixerfor all leads, having
continuous agitated mixer, manufactured as per mixdesign of specified grade for plain
cement concrete work, including pumpingof R.M.C. from transit mixer to site of laying
and curing, excluding the cost ofcentering, shuttering and finishing, including cost of
curing, admixtures inrecommended proportions as per IS : 9103 (footing)M15

Providing and laying in position ready mixed plain cement concrete, using flyash and
cement content as per approved design mix and manufactured infully automatic
batching plant and transported to site of work in transit mixerfor all leads, having
continuous agitated mixer, manufactured as per mixdesign of specified grade for plain
cement concrete work, including pumping of R.M.C. from transit mixer to site of laying
and curing, excluding the cost ofcentering, shuttering and finishing, including cost of
curing, admixtures inrecommended proportions as per IS : 9103 (floors)M10

Brick work with common burnt clay modular bricks of class designation 7.5 in
foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)

Reinforced cement concrete work in beams, suspended floors, roofs having slopeup to
15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases
and spiral stair cases above plinth level up to floor five level, excludingthe cost of
centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse
sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).

Reinforced cement concrete work in walls (any thickness), including attached pilasters,
buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and
struts etc. above plinth level up to floor five level, excluding cost of centering,
shuttering, finishing and reinforcement :5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-
III) : 3 graded stone aggregate 20 mm.
Providing and laying in position specified grade of reinforced cement concrete,excluding
the cost of centering, shuttering, finishing and reinforcement - All work up to plinth
level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm
nominal size)

Centering and shuttering including strutting, propping etc. and removal of form for all
heights :
Columns, piers, abutments, pillars, posts and struts

Lintels, beams, plinth beams, girders, bressumers and cantilevers,slabs

Weather shade, Chajjas, corbels etc., including edges

Stairs, (excluding landings) except spiral-staircases

Foundations, footings, bases for columns

Steel reinforcement for R.C.C. work including straightening, cutting, bending,placing in


position and binding all complete upto plinth level.

Steel reinforcement for R.C.C. work including straightening, cutting, bending,placing in


position and binding all complete above plinth level.

Providing and laying vitrified floor tiles in different sizes (thickness to be specified by
the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622,
of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1
cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including
grouting the joints with white cement and matching pigments etc., complete.(Size of
Tile 1000x1000 mm)

Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal
stability for hot & cold water supply including all CPVC plain & brassthreaded fittings
This includes jointing of pipes & fittings with one step CPVCsolvent cement, trenching,
refilling & testing of joints complete as per directionof Engineer in Charge External work
75 mm nominal inner dia Pipes
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal
stability for hot & cold water supply, including all CPVC plain & brassthreaded fittings,
including fixing the pipe with clamps at 1.00 m spacing. Thisincludes jointing of pipes &
fittings with one step CPVC solvent cement and testing of joints complete as per
direction of Engineer in Charge.Internal work - Exposed on wall 25 mm nominal outer
dia Pipes

Providing and fixing white vitreous china pedestal type (European type/ wash
down type) water closet pan.

Providing and fixing 8 mm dia C.P. / S.S. Jet with flexible tube upto 1 metre long with
S.S. triangular plate to Eureopean type W.C. of quality and make as approved by
Engineer - in - charge.

Constructing brick masonry road gully chamber 45x45x77.5 cm with bricks in cement
mortar 1:4 (1 cement : 4 coarse sand ) with precast R.C.C. vertical grating complete as
per standard design :With common burnt clay F.P.S. (non modular) bricks of class
designation 7.5

Providing and fixing gun metal non- return valve of approved quality (screwed end) :50
mm nominal bore (Horizontal)

Providing and fixing aluminium work for doors, windows, ventilators and partitions with
extruded built up standard tubular sections/ appropriate Z sections and other sections
of approved make conforming to IS: 733 and IS:1285, fixing with dash fasteners of
required dia and size, including necessary filling up the gaps at junctions, i.e. at top,
bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections
shall be smooth, rust free, straight, mitred and jointed mechanically wherever required
including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass
/stainless steel screws, all complete as per architectural drawings and the directions of
Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for
separately) :Powder coated aluminium (minimum thickness of powder coating 50
micron)

Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and
prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and
similar locations of required size, approved shade, colour and texture laid over 20 mm
thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white
cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing,
moulding and polishing to edges to give high gloss finish etc. complete at all levels.Raj
Nagar Plain white marble/ Udaipur green marble/ Zebra black marble Area of slab over
0.50 sqm.
Stone work (machine cut edges Veneer work) for wall lining upto 10 m height,
backing filled with a grout of 12 mm thick cement mortar 1:3 (1 Cement : 3 coarse sand
and jointed with Cement mortar 1:2 (1 cement : 2 stone dust), including rubbing and
polishing complete. (To be secured to the backing and the sides by means of cramps and
pins which shall be paid for separately).Kota stone slabs exposed face dressed and
rubbed. 25 mm thick.

18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5
(1cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster1:6 (1
cement : 6 fine sand).

White washing with lime to give an even shade :New work (three or more coats).

Providing and fixing brass bib cock of approved quality :20 mm nominal bore

Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed
end) : 25 mm nominal bore

Providing and laying damp-proof course 40mm thick with cement concrete
1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm
nominal size)

Tile work in skirting, risers of steps and dado up to 2 m height over 12 mm thick bed of
cement mortar 1:3 (1 cement :3 coarse sand) and jointed with grey cement slurry @ 3.3
kg/sqm, including pointing in white cement mixed with pigment of matching shade
complete. Marble tiles (8 mm thick).

Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per IS:13983 with
C.I. brackets and stainless steel plug 40 mm, including painting of fittings and brackets,
cutting and making good the walls wherever required : Kitchen sink with drain board
(610x460 mm bowl depth 200 mm).

Providing and fixing white vitreous china wash basin including making all connections
but excluding the cost of fittings Flat back wash basin of size 630x450 mm
Extra for providing opening of required size & shape for wash basin/ kitchen sink in
kitchen platform, vanity counter and similar location in marble/ Granite/ stone work,
including necessary holes for pillar taps etc. including moulding, rubbing and polishing
of cut edges etc. complete.

Providing and fixing rectangular high density polyethylene water storage loft tank with
cover, conforming to ISI : 12701, colour of opaque white or as approved by Engineer-in-
charge. The rate includes making necessary holes for inlet, outlet & over flow pipes. The
base support i/c fittings & fixtures for tank shall be paid separately

Providing wood work in frames of doors, windows, clerestory windows and other
frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners
of required dia & length ( hold fast lugs or dash fastener shall be paid for
separately).Kiln seasoned and chemically treated hollock wood.
TOTAL
Internal water supply & sanitary installations
External services connections
Internal electrical connections
Total Cost
Cost of works as per DSR-2016
Less correction factor @10.20%

Add post GST cost index @ 66.55 per cent

Sub-Total II (Z)

Cost excluding GST (Z/1.18)

Market rate items without GST


Sub-Total III (Z/1.18 + MR)

Labour cess @ 1 per cent


TOTAL(A)

Add ESI EPF @ 3% on TOTAL(A)


TOTAL(B)

Add 3% contingencies on TOTAL(B)


TOTAL COST
ADD 18 per cent for GST on TOTAL(A)
TOTAL COST including GST
CT SHEET
RUCTION OF F9 BUILDING

Quantity Unit Rate Amount Reference to DSR 2016

108 cu.m 125.95 13602.6 Sr no. 2.6.1/Pg 83

32.5 cu.m 6066.5 197161.25 Sr no. 4.19.1.1 /Pg 159

37.35 cu.m 6498.8 242730.18 Sr no. 4.19.1.2 /Pg 162

246.58 cu.m 4592.9 1132517.282 Sr No. 6.2.1/Pg 250

81.62 cu.m 7390.8 603237.096 Sr no. 5.3/pg 71

32 cu.m 5351.13 171236.16 Sr no. 5.1.2 / pg 161


14.64 cu.m 6215.35 90992.724 Sr no. 5.1.2/pg 169

151.4 Sq.m 467.85 70832.49 Sr no. 5.9.6/ Pg 180

238 Sq.m 342.9 81610.2 Sr no. 5.9.5/ Pg 179

4.6 Sq.m 521.75 2400.05 Sr no. 5.9.19/Pg 193

6.95 Sq.m 419.35 2914.4825 Sr no 5.9.7/Pg 181

144 Sq.m 193.95 27928.8 Sr no 4.3.1/Pg 147

1440 kg 55.3 79632 Sr no. 5.22.1/ pg 207

8822 kg 55.3 487856.6 Sr no.5.22A.1 /pg 210

560 sq.m 2057.85 1152396 Sr no.11.41.4 /pg 674

60 R.metre 1201.05 72063 Sr no.18.9.8/Pg 1181


100 R .metre 333.6 33360 Sr no. 18.8.3 / pg 1181

8 nos 1363.65 10909.2 Sr no. 17.15 /pg 1092

8 nos 254.8 2038.4 Sr no. 17.16A / Pg 1093

6 nos 4384.5 26307 Sr no. 19.28.1 / Pg 1466

2 nos 987.7 1975.4 Sr.no 18.19.4.1 / Pg 1198

104 kg 384.5 39988 Sr .no 21.1.1.2/ pg 1514

11.5 Sq .m 1850.15 21276.725 Sr.no 8.2.1.2/ pg .no 347


22 Sq.m 1801.1 39624.2 Sr.no 7.37.1.1 / pg 337

3331.82 Sq.m 255.55 851446.601 Sr.no 13.11/ pg 777

3331.82 Sq.m 17.25 57473.895 Sr.no13.37.1 / pg 794

30 nos 280.4 8412 Sr no. 18.15.2/Pg 1192

5 nos 428.2 2141 Sr no.18.17.1/Pg 1193

177.73 sq.m 263.1 46760.763 Sr no. 4.10 / pg 154

146 Sq.m 909.7 132816.2 Sr.no 11.22.1.1 / pg .no 653

8 Nos. 2186.25 17490 Sr.no 17.10.2.2/ pg no 1089

8 Nos. 969.3 7754.4 Sr.no 17.25.1/pg no 1098


8 nos 427.95 3423.6 Sr.no 8.5/pg no 350

4000 litres 7.25 29000 Sr.no 18.48A/pg no 1258

1.92 cu.m 54930.25 105466.08 Sr no. 9.1.3/Pg 362

5866774.3785
20% of Building cost 1173354.8757
5% of Building cost 293338.718925
15% of Building cost 880016.156775
8213484.1299
₹ 8,213,484.13
₹ -837,775.38
₹ 7,375,708.75
₹ 4,908,534.17

₹ 12,284,242.92

₹ 10,410,375.36

₹ -
₹ 10,410,375.36 ₹ 10,410,375.36

₹ 104,103.75
₹ 10,514,479.11

₹ 315,434.37
₹ 10,829,913.48

₹ 324,897.40
₹ 11,154,810.89
₹ 1,892,606.24
₹ 13,047,417.13