This document provides the design of a reinforced concrete cable trench for an MCC room. It includes calculations for the design of the side walls and base of the trench. For the side walls, the required area of steel is calculated as 5.1 cm2 and 10 mm diameter bars provided at 150 mm centers are determined to be adequate. For the base, the required steel is calculated as 1.3 cm2 and 8 mm diameter bars provided at 250 mm centers are sufficient. Distribution steel of 8 mm diameter bars at 250 mm centers is also specified.

Uploaded by

Rajiv Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views

Trench Design

This document provides the design of a reinforced concrete cable trench for an MCC room. It includes calculations for the design of the side walls and base of the trench. For the side walls, the required area of steel is calculated as 5.1 cm2 and 10 mm diameter bars provided at 150 mm centers are determined to be adequate. For the base, the required steel is calculated as 1.3 cm2 and 8 mm diameter bars provided at 250 mm centers are sufficient. Distribution steel of 8 mm diameter bars at 250 mm centers is also specified.

Uploaded by

Rajiv Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

JOB NO.

W023
TITLE RCC Design of CABLE TRENCH for MCC Room
SHEET NO.
REVISION 0
PROJECT
THIS DOCUMENT IS MBE'S PROPERTY AND MUST NOT BE USED EXCEPT IN
PREPARED A.M.
CONNECTION WITH MBE'S WORK.REPRODUCTION, USE OR DISCLOSURE OF
DOCUMENT APPROVED R.K.B.
THE CONTENT OFTHIS DOCUMENT TO THIRD PARTY/IES WITHOUT
NO.
EXPRESS/WRITTEN PERMISSION OF MBE IS STRICTLY PROHIBITED. DATE 2/12/2024

DESIGN OF R.C.C. CABLE TRENCH: W 1500 x D 1500

Surcharge = 1 T/m2
1500
Unit wt. of water = 1 T/m3

150

150 150 1.5 t/m2 0.750 0.50 t/m2


1650 (earth) t/m2 (Surcharge)
1500 (water)

Grade of concrete M25 25 N/mm2


Grade of steel Fe500 500 N/mm2

Submerged unit wt. of soil gd 1 t/m3


Coefficient of Earth Pressure = 0.5

Depth 150 mm
Effective cover 40 mm
Effective depth 105 mm
Width 1000 mm

DESIGN OF SIDE WALL:

Moment at bottom of wall = 1.398 t m/m


Mu/bd2 = 1.902 N/mm2
pt = 0.484
Ast (Required) = 5.1 cm2

PROVIDED 10 DIA. @ 150 mm C/C 5.23 cm2 ( pt = 0.498 ) AT BOTTOM. O.K.

Check for shear :


Shear at the face of support = 2.438 T
Nominal shear stress.tv = 0.35 N/mm2
tc = 0.85*Ö(0.8fck(Ö(1+5b)-1)/6b = 0.482 N/mm2
where, b = 0.8 fck/ 6.89pt = 5.997
where, Total pt = 0.484
Shear Capacity= 7.24 T > 2.44 T OK
JOB NO. W023
TITLE RCC Design of CABLE TRENCH for MCC Room
SHEET NO.
REVISION 0
PROJECT
THIS DOCUMENT IS MBE'S PROPERTY AND MUST NOT BE USED EXCEPT IN
PREPARED A.M.
CONNECTION WITH MBE'S WORK.REPRODUCTION, USE OR DISCLOSURE OF
DOCUMENT APPROVED R.K.B.
THE CONTENT OFTHIS DOCUMENT TO THIRD PARTY/IES WITHOUT
NO.
EXPRESS/WRITTEN PERMISSION OF MBE IS STRICTLY PROHIBITED. DATE 2/12/2024

DESIGN OF BASE OF TRENCH

Self weight of trench = 1.69 t/m


Live load over trench = 1 t/m
Total 2.69 t/m
Upward pressure = 1.65 t/m2
Net pressure = 1.04 t/m2
Free B.M at span = 0.353 t m/m
Mu/bd2 = 0.480 N/mm2
pt = 0.120
Ast (Required) = 1.3 cm2

PROVIDED 8 DIA. @ 250 mm C/C 2.01 cm2 ( pt = 0.191 ) AT BOTTOM. O.K.

Distribution Steel:

Distribution reinforcement= 0.060 % of gross cross sectional area on each face


Ast required = 0.06*150*1000/100 90.00 mm2
Spacing required = 558 mm

Provide 8 mm dia 250 mm c/c as distribution reinforcement OK

10 @ 150 c/c

8 @ 250 c/c
8 @ 250 c/c
1500

8 @ 250 c/c

1500