This circular from Trakhees outlines new procedures for the concept design approval process. Consultants are now required to conduct self-verification of concept designs before submitting for approval. An architectural checklist has been issued to help consultants fulfill technical requirements. The goal is to improve building permit issuance and allow consultants to comply with standards through self-performance. Compliance and cooperation is appreciated as this new process is implemented immediately.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
81 views

Cedgr 2

This circular from Trakhees outlines new procedures for the concept design approval process. Consultants are now required to conduct self-verification of concept designs before submitting for approval. An architectural checklist has been issued to help consultants fulfill technical requirements. The goal is to improve building permit issuance and allow consultants to comply with standards through self-performance. Compliance and cooperation is appreciated as this new process is implemented immediately.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

C

CIRCULA
AR

To: All Busiiness Unitts/Clients//Consultants

Subjecct: Circular fo
or improve
ement of th
he Conceptt Design P rocess

Our Re
ef: CEDGR-2-Circular

Date: 31 March
h 2015

As parrt of Trakh
hees – CE ED’s conti nual improovement ofo servicess provided to our
valued Business Units, Clie
ents for the
e issuance of the Con
ncept Desi gn NOC.

Trakhe
ees -CED Instructed consultan nt to play an
a active role
r in verrifying proc cedures
for Con
ncept Dessign approvval and ta ke up the responsib
bility of selff-verificatio
on prior
submittting for approval.

The Arrchitecturall Section has


h issued attached checklist
c on
o technicaal requirem
ments to
be fulffilled for concept de esign impro ovement and
a asked
d all consuultancy offfices to
conducct self-veriffication durring conce
ept design submission
s n.

This circular camme as parrt of the e efforts of Trakhees to develoop procedu ures for
g building permits
issuing p & activating
a tthe self-pe
erformance
e powers off consultan
ncies to
allow th
hem to commply with Trakhees
T & internatio
onal standa
ards.

Your ccompliance
e and coop
peration w s this is too be implemented
will be apprreciated as
with im
mmediate effect.
e

Eng. AAbdulla M. Belhoul


Directo
or – Trakhe
ees Civil Engineering
g Division
Port, C
Customs annd Free Zoone Corporration
AR
RCHITEC
CTURAL VERIFIC
CATION CHECKL
LIST
Projject Inform
mation
Com
mmunity Nam
me as per TKSS Site Plan

Plot No. (as perr TKS Site Plan) Projecct ID P-

TEC
CHNICAL REV VIEWING CHEECKLIST as per
p Trakheess Building Re egulations & Design
CHEC
CKED N/A
N
Guid
delines‐ Architecture & DCR of the related
r businness unit.
1 The subm
mitted propossal is comprissed with apprroved drawing by Master developer
d

2 Calculatiion sheet (Are


ea, Parking & garbage…) aas per BRDG

3 Plans, Ele
evations, Secctions and De
etails as per B
BRDG
Requirem
ment of People with disability as per R
Regulations & Design Provision For Peopple
4
With Disa
ability
5 Plot limitts with coord
dinates & plott dimension tto be as per TKS
T site plan/
/ lease drawiings

6 Plot cove
erage area ass per BRDG & DCR

7 Gate leve
el as per BRD
DG & DCR

8 Building height and in


nternal clear height as perr BRDG & DCR

9 Setback a
as per BRDG & DCR

10 Plot Fencce / Boundaryy Wall as perr BRDG

11 Openingss Requiremen
nt as per BRDG

12 External Building Elem


ment and Pro
ojection & Te
erraces as perr BRDG

13 Internal C
Corridors to be
b as per BRD
DG

14 Staircase
e, Lifts & lobb
bies as per BR
RDG

15 Fire-Esca
ape Staircase as per Dubaii Civil Defensse regulationss

16 Access ra
amps requirement as per BRDG

16.1 • Vehicle
es Ramp slope
es (straight max.
m 10 %, Cu
urved Max. 8 %, parking sttalls max. 2 %
%)

16.2
2 • Ramps width (Straig
ght one way min.
m 3 m, Cu rved min. 3.5
5 m)

16.3
3 • Curved
d ramp inner radius
r ( min. 4.5 m)

16.4
4 • Safety separation between laness (min 0.3m)

17 Off Stree
et Parking Req
quirement ass per BRDG

17.1 • Numbe
er of Parking Provision
P as Per
P Ced Regu
ulation

17.2
2 • Dimenssion of drive-ways, ramps,, parking stalll + slot numb
bering

17.3
3 • In gene
eral; stall size
e (min. 2.5 x 5.5 m)

17.4
4 • For parrallel parking
g; stall size (min. 2.5 x 6. 0 m)
17.5 • Clear overhead height within covered parking area to be min. 2.4 m

17.6 • Turning radius as per BRDG

17.7 • Loading /unloading bays to be as per BRDG


Building Requirements of development types (Residential, Religious, Commercial,
18
Educational, Health or Industrial) as per BRDG
19 Sanitation as per BRDG

20 Swimming Pool as per BRDG

21 Refuse Disposal as per BRDG

Abbreviations:

BRDG : Trakhees Building Regulations & Design Guidelines- Architecture

DCR : Development Control Regulation of Master Developer

Declaration

• We hereby confirm that all above technical aspects have been properly checked in compliance with Trakhees
Regulations & Design Guidelines as well as all related local & International standards. Complete coordination has
been insured between all submitted displays and we are fully responsible for incompliance.

• If any delay occurs due to incorrect information provided by us in the submitted checklist we hold ourselves solely
responsible for the delay.

• We are liable for any legal obligations which may occur due to invalid / tampered documents being submitted
along with this application.

Date Authorized Engineer Name & Signature

Revision 03 March 2015 Page 2 of 2

You might also like