Rule 7 8 Development Controls
Rule 7 8 Development Controls
Development Controls
Ar. Israel S. Bautista, uap
6 SITE ELEMENTS
▪ Zoning
▪ TLA
▪ Lot Type
▪ Road
▪ Orientation
▪ Slope
*Slope = Rise / Run x 100
TERMS
TLA - Total Lot Area
AMBF - Maximum Allowable Building Footprint
PSO - Percentage of Site Occupancy
USA - Unpaved Surface Area
ISA - Impervious Surface Area
MACA - Maximum Allowable Construction Area
TOSL - Total Open Space within Lot
TGFA - Total Gross Floor Area
BHL - Building Height Limit
DEVELOPMENTAL CONTROLS
PSO max
1. AMBF
Setback min